Forums | Home Repair | Home Improvement | Painting | Interior Decorating | Remodeling | Landscaping


Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > Flooring

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Search this Thread Display Modes
Old 10-21-2011, 01:01 AM   #1
Newbie
 
Join Date: Apr 2010
Posts: 25
Share |
Default

leveling concrete subfloors for engineered wood installation


This has to be one of the hardest DIY jobs i've done. Basically I am preparing about 900 square feet of concrete subfloors for proper leveling so that I can install my engineered wood floor down properly. Im starting in a room that about 12x12.

I must say I dont know what I am doing. I must have bought 15 bags of 50 lb self leveling powder and my floors are still not leveled. At $35 bucks a bag...well you can do the math. I think I have 5 bags left.

Its hard to describe exactly what the problem is im experiencing but basically if i place my straight edge on the wall to my left starting in a corner my straight edge only tells me what my dips and peaks are for up to 4 feet and not remaining 8 feet that the straight edge does not cover. Now if i move the straight edge over 4 feet i can determine where my high and low points are but im no longer correlated with my previous 4 feet high/low measurement and the last 4 feet high/low measurement.

Im inclined to believe that I need a straight edge that is closer to the length of the room, maybe 11 feet. Its funny all the videos on utube say you need a straight edge but they dont say how long the straight edge has to be.

Overall the floors are not messed up to the point that i need to chip up any level compound it seems like i will measure a low, fill in the low and the low is still there next time i measure and i think this is happening because im not laying down the straight edge like i did the first time so my low/high measurement are changing on me if you kinda understand what im getting at.

Any advice?

robismyname is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Bamboo on modified concrete pad jhanson Flooring 0 10-08-2011 11:58 AM
Installing 9mm bamboo over 9mm wood floor and concrete hellobritt Flooring 4 08-30-2011 09:35 PM
Help on tool selection for leveling concrete slab Wohn Flooring 3 07-11-2010 02:03 AM
Wood to Concrete Block bmancanfly Building & Construction 7 09-22-2009 03:45 PM
Wood to Concrete without Drilling MattStata Carpentry 1 04-19-2006 04:16 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.