Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > Flooring

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Search this Thread Display Modes
Old 04-12-2012, 06:48 AM   #1
Newbie
 
Join Date: Apr 2012
Posts: 2
Share |
Default

Laying hardwood floors over plywood and tile in a mobile home


We pulled up the carpet from a mobile home and found some areas with bare plywood, and others with old vinyl/asbestos tile. The floor is especially unlevel around the seam of the house (down the middle). We have a nice load of oak hardwood flooring we'd like to lay down.

I'm wondering what might be the best way to prepare this subfloor? The rooms with tile are fairly level, but given they're asbestos tile, we thought it might be a better idea to lay down some plywood on top to nail into? And for the existing plywood floor, we're not what the best way to level this out? I went to lowes and they mentioned some kind of concrete leveler, but then we can't nail into that?

chrismarx is offline   Reply With Quote
Old 04-15-2012, 02:58 PM   #2
Remodeling Contractor
 
Join Date: Jan 2012
Location: Chicago Burbs
Posts: 68
Default

Laying hardwood floors over plywood and tile in a mobile home


Can't be sure of floor load requirements in a trailer? We can't calculate
joist size - span - , cause you don't have them?

__________________
Phil,
http://www.edgestripkits.com
pgc555 is offline   Reply With Quote
Old 04-15-2012, 03:23 PM   #3
Member
 
Join Date: Feb 2012
Location: Utica, NY
Posts: 516
Default

Laying hardwood floors over plywood and tile in a mobile home


First, the chances of the vinyl being asbestos is low. Now the cement is another thing.
framer52 is offline   Reply With Quote
Old 04-15-2012, 04:55 PM   #4
Newbie
 
Join Date: Apr 2012
Posts: 2
Default

Laying hardwood floors over plywood and tile in a mobile home


Well, we stopped by another hardware/building store and they recommended luan, so we're laying that on top of the tiles, and I putting a bead of construction adhesive around the edges of the boards to seal in any dusy (if we are in the low chances of the tiles having some asbestos). We also got a bundle of cedar shingles and some cedar shims, and I'm going to try to see what I can do to get some of the areas level with those, I'm all ears for suggestions-
chrismarx is offline   Reply With Quote
Reply

Tags
hardwood floor, mobile home, sub floor repair


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Can I tile over old plywood with no gaps? JFERTICH Flooring 5 02-21-2011 02:52 PM
matching up 1/2" hardwood floor to 1" tall tile cmlcsu Flooring 3 10-20-2009 08:56 PM
Tile over plywood? Thurman Flooring 3 07-12-2009 09:05 AM
Removing tile from plywood underlayment Martinglmt Flooring 3 12-13-2008 07:06 PM
Tile Plywood Sub-Floor Help woodlab Flooring 1 10-21-2008 10:58 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.