Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > Flooring

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Search this Thread Display Modes
Old 06-05-2006, 01:39 PM   #1
They're all fixer-uppers
 
J187's Avatar
 
Join Date: May 2006
Location: MA
Posts: 991
Share |
Default

Getting ready to tile bathroom floor, question


I'm going to be tiling over the existing tile. existing tile is in fabulous condition. My question is this, I recently put in a new bathtub and there is about a 5/8" space between where the old concrete substrate and tiles stop and the side of the tub begins. What should I fill this space with before tiling. I was wondering if I could use self-leveling concrete filler or if something else would be better.

J187 is offline   Reply With Quote
Old 06-05-2006, 02:37 PM   #2
Member
 
Join Date: Mar 2006
Posts: 2,083
Default

Getting ready to tile bathroom floor, question


what kind of tile will you be putting down? (vinyl, ceramic...)

redline is offline   Reply With Quote
Old 06-05-2006, 03:07 PM   #3
They're all fixer-uppers
 
J187's Avatar
 
Join Date: May 2006
Location: MA
Posts: 991
Default

Getting ready to tile bathroom floor, question


The kind of tile? How did i leave that out, sorry.

Ceramic
J187 is offline   Reply With Quote
Old 06-06-2006, 11:35 AM   #4
Member
 
Join Date: May 2005
Posts: 37
Default

Getting ready to tile bathroom floor, question


I'd use some caulk. Fill it with SLC or thinset and you could have problems with expansion and tenting in the original installation.

Rich
Remodeling is offline   Reply With Quote
Old 06-06-2006, 12:31 PM   #5
They're all fixer-uppers
 
J187's Avatar
 
Join Date: May 2006
Location: MA
Posts: 991
Default

Getting ready to tile bathroom floor, question


Good point. Do you think that the caulk will provide enough support for the tile, the tile go over the gap area to meat the tub by the half inch or so? That will be ok if I caulk up to the top of the substrate and tile over that? Or are you saying I should just fill most of the crevace w/ caulk and then let the tile hang over to the tub edge.
J187 is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Bathroom flooring (tile?) Nhrafan Flooring 30 06-11-2007 11:44 AM
Approach to demo bathroom ceramic tile floor for remodel corky Flooring 3 01-29-2007 09:59 AM
bathroom floor tile job advice needed dbrew Flooring 14 01-23-2007 07:03 PM
Getting ready for the bathroom subfloor project scheduled for this weekend... tallycat77 Flooring 8 07-10-2005 10:50 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.