Floating Bamboo Floor Installation - Subfloor Preparation - Flooring - DIY Chatroom Home Improvement Forum


Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > Flooring

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Display Modes
Old 08-05-2011, 11:11 AM   #1
Newbie
 
Join Date: Aug 2011
Posts: 8
Rewards Points: 10
Default

Floating bamboo floor installation - subfloor preparation


Our great room was previously part carpet, part lino. After tearing up the carpet, we found there was 3/8"; particle board under the lino to make the two types of flooring even. is it possible to just add 3/8"; plywood to the area where the carpet had been and then install a floating bamboo floor over the whole area? My concern is that there will be ~1/16"; (the thickness of the vinyl) difference between the two areas, and I am concerned you will be able to feel the transition when the new flooring is installed. Is there a better way to level out the two areas?
Any tips are appreciated!

Advertisement


Last edited by pilotgirl; 08-05-2011 at 11:13 AM.
pilotgirl is offline   Reply With Quote
Old 08-05-2011, 07:55 PM   #2
Member
 
woodman58's Avatar
 
Join Date: Aug 2010
Location: Blackwell, Missouri
Posts: 454
Rewards Points: 250
Default

Floating bamboo floor installation - subfloor preparation


You can use 15# felt paper and layer it up to the vinyl. Start at about 30 inches and cut them shorter by 6 or 8 inches each layer until you reach the right hight. Don't forget to layer it back on the sides to.

Advertisement

woodman58 is offline   Reply With Quote
Old 08-06-2011, 07:42 PM   #3
Newbie
 
Join Date: Aug 2011
Posts: 8
Rewards Points: 10
Default

Floating bamboo floor installation - subfloor preparation


That was something I was considering - I guess just staple it down under the cork underlayment I got for the floating floor? I'm having trouble visualizing what you mean by layering out the sides - would I lay it out under the whole area affected or just "feather" it out from the transition?
pilotgirl is offline   Reply With Quote
Old 08-07-2011, 07:05 AM   #4
Member
 
woodman58's Avatar
 
Join Date: Aug 2010
Location: Blackwell, Missouri
Posts: 454
Rewards Points: 250
Default

Floating bamboo floor installation - subfloor preparation


To layer the sides you do the same thing as you did from lino out. If the door is 4' wide start with a peice 6' wide and the next peice will be 6" shorter on both sides and then the next peice is 6" shorter than that and so on.
woodman58 is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
To use, or not to use Bamboo... dmcandy Flooring 10 08-23-2012 01:19 PM
can bamboo be refinished acerunner Flooring 7 05-23-2011 01:27 AM
Bamboo Flooring Installation - subfloor question Shazza Flooring 5 03-19-2011 02:34 PM
refinish bamboo? racebum Flooring 0 07-23-2010 04:08 AM
bamboo over radiant heat montaillou Flooring 7 07-25-2007 02:17 PM




Top of Page | View New Posts