I am planning to build a slate patio that will be approximately 3 inches above the level of the ground. Rather than pour a concrete surface, I would like to place composite lumber sleepers 85% into the ground and install the cement board so it is just above the level of the ground.

I will then install the slate using an appropriate type of thinset mortar.

I have not yet determined how to stabilize the grid of sleepers but am confident they will be solidly in place. I am more concerned with the ability of the backer board to withstand moisture and the freeze-thaw cycles of northern Illinois.

Advertisement

allenjacque is offline   Reply With Quote
Old 04-16-2013, 06:06 PM   #2
"You can do anything"-Mom
 
brockmiera's Avatar
 
Join Date: Oct 2012
Location: Littleton, CO
Posts: 724
Rewards Points: 500
Default

Exterior slate installation over concrete backer board


I think you are asking for trouble doing it that way. Do you have any pictures? those sleepers will degrade over time plus they dont have enough bearing surface to stay put under the weight of people walking above. Why not just build up your grade ?

Advertisement

brockmiera is offline   Reply With Quote
Old 04-16-2013, 06:12 PM   #3
Newbie
 
Join Date: Apr 2013
Posts: 5
Rewards Points: 10
Default

Exterior slate installation over concrete backer board


No pictures as it only exists in my head.

I do not want to commit to the expense and permanent nature of a poured slab.

I was not aware that the composite lumber would fail if it were exposed to moisture.
allenjacque is offline   Reply With Quote
Old 04-16-2013, 06:20 PM   #4
"You can do anything"-Mom
 
brockmiera's Avatar
 
Join Date: Oct 2012
Location: Littleton, CO
Posts: 724
Rewards Points: 500
Default

Exterior slate installation over concrete backer board


Quote:
Originally Posted by allenjacque View Post
No pictures as it only exists in my head.

I do not want to commit to the expense and permanent nature of a poured slab.

I was not aware that the composite lumber would fail if it were exposed to moisture.
Yeah i dont think the composite lumber would fail but how far would you place between them? I think you'd need something stronger than concrete board to span that distance. I think natural stone needs like L/720 deflection in order to assure it wont fail.

I dont think you need to do a concrete slab but why no just build it up 3" with sand or compacted fill?

A picture of the area in question was what i was looking for.
brockmiera is offline   Reply With Quote
Old 04-16-2013, 06:22 PM   #5
Newbie
 
Join Date: Apr 2013
Posts: 5
Rewards Points: 10
Default

Exterior slate installation over concrete backer board


I could probably put the sleepers at 12" O.C. As far as fill, the area is not level so building a surface is preferable.

Last edited by allenjacque; 04-16-2013 at 06:24 PM. Reason: I forgot to add one comment.
allenjacque is offline   Reply With Quote
Old 04-16-2013, 06:29 PM   #6
"You can do anything"-Mom
 
brockmiera's Avatar
 
Join Date: Oct 2012
Location: Littleton, CO
Posts: 724
Rewards Points: 500
Default

Exterior slate installation over concrete backer board


Quote:
Originally Posted by allenjacque View Post
I could probably put the sleepers at 12" O.C. As far as fill, the area is not level so building a surface is preferable.
You are going to end up spending more on the composite boards than you would just doing slate on a sand bed. If the ground isn't level then a small retaining wall would work to keep the soil and patio in place. But you are saying that its only 3"????

I guess I dont see the issue.

If you are dead set on doing this not only would you have to put your sleepers in 12" O.C. but you'd have to perpendicularly blocks 12" O.C the other direction. You'd also need to ensure that you will have enough bearing surface on the board so when you couple the dead load (weight of framing) and live load (people walking around) your boards dont just sink into the ground.
brockmiera is offline   Reply With Quote
Old 04-16-2013, 06:54 PM   #7
Newbie
 
Join Date: Apr 2013
Posts: 5
Rewards Points: 10
Default

Exterior slate installation over concrete backer board


The highest point of ground would be 3" but the lowest point would have a gap of about 12" between the ground and the backer surface. You are probably right about building the sand bed. I will figure out my needed volume. Thank you for your help.
allenjacque is offline   Reply With Quote
Old 04-16-2013, 08:25 PM   #8
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 27,728
Rewards Points: 572
Default

Exterior slate installation over concrete backer board


Your trying to use one of the most brittle, poris, slippery natural stones on top of two products there were never intended to be used that way.
Cement board has 0 top load strenght when over any span and was never made to be inconstant contact with moisture.
__________________
When posting in forums, letting us know your location will help others give better feedback/advice/solutions to your questions

Last edited by joecaption; 04-16-2013 at 08:37 PM.
joecaption is offline   Reply With Quote
Old 04-16-2013, 08:32 PM   #9
Newbie
 
Join Date: Apr 2013
Posts: 5
Rewards Points: 10
Default

Exterior slate installation over concrete backer board


Well that pretty well sums it up. Thank you for your input.
allenjacque is offline   Reply With Quote
Old 04-16-2013, 09:04 PM   #10
Tileguy
 
JazMan's Avatar
 
Join Date: Feb 2007
Location: Troy, Michigan
Posts: 4,186
Rewards Points: 2,230
Default

Exterior slate installation over concrete backer board


Allen,

Yea, that was a bad plan. The job would have been a mess by January. Either build a patio or a deck that is at least 18" above the ground. In either case you'll have to take special precautions is tiles are to be used.

Jaz

Advertisement

__________________
Tile 4 You LLC Troy, MI

DITRA Installs - KERDI Watertight-Mold-Free Showers. I have NEVER made a mistake, I thought I did ONCE, but, I was WRONG! A+ BBB rating - est. 1987 - over 50 yrs. exp.
JazMan is offline   Reply With Quote
Reply

Tags
exterior horizontal patio


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Backer Board Around Tub Deteriorated. devnull88 Plumbing 2 05-18-2011 04:56 PM
Backer Board Around Tub Deteriorated devnull88 Building & Construction 3 05-16-2011 10:18 PM
Greenboard to Backer Board xsmiles23x Drywall & Plaster 3 09-12-2010 09:40 AM
Backer board vs. plywood for tile underlayment allpraisebob Flooring 4 01-07-2007 08:44 PM
Concrete board installation HELP! irlizard Flooring 4 07-28-2006 09:35 PM




Top of Page | View New Posts