Not sure about the prep Maintenance 6 beyond them sanding off the old epoxy. There was a spot in the floor where something had been bolted down and when they removed whatever that was, it chipped the concrete. They were worried that it could be a safety hazard, so they removed the old epoxy, filled in the chip and redid the floor.
Thanks for the advice Ranger, I'll check it out.
And no Bud, no bonus in my pay, although that would be nice.
The facilities guy who ultimately decided on who would do the job and what they would use will probably find a way to blame me for this. "He must have been hacking away at the floor!!"
He was insistent that the crew they used was the best for the job and that it was a special process. Why does the term kick-back come to mind?