Dry wall first or tile first?


Doing a full bathroom renovation. Should I put the dry wall first or tile first?

Advertisement

tripower is offline   Reply With Quote
Old 06-24-2008, 06:41 PM   #2
Registered User
 
Termite's Avatar
 
Join Date: Apr 2008
Posts: 6,520
Rewards Points: 2,000
Default

Dry wall first or tile first?


I don't see any other way to do it than to install the drywall first, then tile. Otherwise you'll never be able to hide the transition between the backerboard and the drywall. You always finish your walls before tile.

Advertisement

Termite is offline   Reply With Quote
Old 06-24-2008, 11:57 PM   #3
K&B Remodeler/Tile Guy
 
angus242's Avatar
 
Join Date: Apr 2008
Location: Illinois
Posts: 887
Rewards Points: 500
Default

Dry wall first or tile first?


Drywall is installed before tile. I'd suggest using DensArmor wall board. It's paperless and therefore, mold resistant. Don't even think about greenboard. It was useless and obsolete the day it was introduced.
If you're tiling in a wet location, make sure you waterproof before you tile. Cement backer board is NOT waterproofing.

Good luck
__________________
Angus
My Albums
angus242 is offline   Reply With Quote
Old 02-21-2009, 03:54 PM   #4
Member
 
Join Date: Nov 2006
Posts: 350
Rewards Points: 282
Question

Dry wall first or tile first?


Just to resurrect this thread, if I am installing drywall on a concrete floor (before the tile) do I let the drywall sit on the floor or raise it just a hair off of the floor.
tripower is offline   Reply With Quote
Old 02-21-2009, 05:18 PM   #5
Member
 
Join Date: Nov 2006
Posts: 350
Rewards Points: 282
Question

Dry wall first or tile first?


Quote:
Originally Posted by angus242 View Post
Drywall is installed before tile. I'd suggest using DensArmor wall board. It's paperless and therefore, mold resistant. Don't even think about greenboard. It was useless and obsolete the day it was introduced.
If you're tiling in a wet location, make sure you waterproof before you tile. Cement backer board is NOT waterproofing.

Good luck
How do you waterproof?
tripower is offline   Reply With Quote
Old 02-21-2009, 06:39 PM   #6
K&B Remodeler/Tile Guy
 
angus242's Avatar
 
Join Date: Apr 2008
Location: Illinois
Posts: 887
Rewards Points: 500
Default

Dry wall first or tile first?


Quote:
Originally Posted by tripower View Post
Just to resurrect this thread, if I am installing drywall on a concrete floor (before the tile) do I let the drywall sit on the floor or raise it just a hair off of the floor.
Yes, leave a gap. If you start from the ceiling you should end up with a natural gap between wall/floor anyway.
__________________
Angus
My Albums
angus242 is offline   Reply With Quote
Old 02-21-2009, 06:45 PM   #7
K&B Remodeler/Tile Guy
 
angus242's Avatar
 
Join Date: Apr 2008
Location: Illinois
Posts: 887
Rewards Points: 500
Default

Dry wall first or tile first?


Quote:
Originally Posted by tripower View Post
How do you waterproof?
With the use of a membrane. There are 2 main types; paint on or fleece sheet. RedGard is a paint on membrane. Kerdi is a fleece membrane sheet. They install differently but serve the same purpose. Either method will keep moisture from penetrating into the tile substrate which, if happened, causes many bad things (mold, rot, etc).
It is not necessary to use a membrane in a non-wet location like bathroom walls, just in a shower or tub surround.
__________________
Angus
My Albums
angus242 is offline   Reply With Quote
Old 02-21-2009, 09:38 PM   #8
Member
 
Join Date: Nov 2006
Posts: 350
Rewards Points: 282
Exclamation

Dry wall first or tile first?


Quote:
Originally Posted by angus242 View Post
Yes, leave a gap. If you start from the ceiling you should end up with a natural gap between wall/floor anyway.
And so I am assuming that when I begin tiling I tile under that 1/2" gap?
tripower is offline   Reply With Quote
Old 02-21-2009, 09:40 PM   #9
Member
 
Join Date: Nov 2006
Posts: 350
Rewards Points: 282
Default

Dry wall first or tile first?


Quote:
Originally Posted by angus242 View Post
With the use of a membrane. There are 2 main types; paint on or fleece sheet. RedGard is a paint on membrane. Kerdi is a fleece membrane sheet. They install differently but serve the same purpose. Either method will keep moisture from penetrating into the tile substrate which, if happened, causes many bad things (mold, rot, etc).
It is not necessary to use a membrane in a non-wet location like bathroom walls, just in a shower or tub surround.

And if I am building my own shower surround with tile how might I do that? I know in my older house it was build with sand and then a thin layer of concrete then the tile. Isn't there a better way to do this?
tripower is offline   Reply With Quote
Old 02-21-2009, 10:36 PM   #10
Member
 
Join Date: Jan 2009
Posts: 489
Rewards Points: 250
Default

Dry wall first or tile first?


Schluter makes a pan system that is presloped. They also sell curbs to go with it, or if you want you can frame up short walls.
__________________
Josh Jaros Remodeling in The Woodlands, Texas www.jarosbros.com
jaros bros. is offline   Reply With Quote
Old 03-02-2009, 07:50 PM   #11
Member
 
Join Date: Nov 2006
Posts: 350
Rewards Points: 282
Default

Dry wall first or tile first?


I am assuming that when using the cement backing board for the shower that I leave the 1/2" gap between the board and the cement floor just as I did with my drywall so that I can tile under it, correct? Or do I need more of a gap?

Oh, and what is the waterproofing procedure for the shower area before tiling?
tripower is offline   Reply With Quote
Old 03-02-2009, 09:06 PM   #12
Member
 
Join Date: Jan 2009
Posts: 489
Rewards Points: 250
Default

Dry wall first or tile first?


Proper installation calls for a pan and not using the concrete as the pan. Excess moisture will transfer through the concrete to other areas.
__________________
Josh Jaros Remodeling in The Woodlands, Texas www.jarosbros.com
jaros bros. is offline   Reply With Quote
Old 03-29-2009, 11:29 AM   #13
Member
 
Join Date: Nov 2006
Posts: 350
Rewards Points: 282
Question

Dry wall first or tile first?


Can someone explain to me why a shower pan would cost $700!? Also, is there a link somewhere on DIY that gives a step by step as far as laying down the pan, liner, waterproofing, etc?
tripower is offline   Reply With Quote
Old 03-29-2009, 12:15 PM   #14
Member
 
Join Date: Feb 2006
Posts: 334
Rewards Points: 250
Default

Dry wall first or tile first?


That's cheap.

http://www.schluter.com/143.aspx



http://www.ontariotile.com/preslope.html

There are other products and variations of both methods that make it easier to do as well.

http://www.oatey.com/apps/catalog/in...an%20Liner.pdf

Advertisement

R&D Tile is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Tiling Shower: Decorative tile thicker than Wall tile digexpressions Remodeling 11 06-08-2008 06:49 PM
8 x 17 Porcelain Wall Tile steve65 Flooring 4 03-19-2008 11:26 PM
Bathroom wall tile Ricksweares Flooring 10 02-26-2008 04:16 PM
Raising Doorway Height (load bearing?) treefrog Building & Construction 6 02-25-2008 10:11 PM
Tile floor or wall first? LX8850 Flooring 3 08-30-2006 01:01 AM




Top of Page | View New Posts