Default Ceramic tile over subfloor in Kitchen

I am remodeling my kitchen/dining room and among many other things, want to put down ceramic tile. The kitchen floor is 21' by 11'9"; 205 SF; supported by 2x8 joists running the short span 11'9" long. They are resting on outside foundation wall and on the inside a ledger attached to a double 2x10 girder. The girder is supported by concrete block columns 7' oc. The subfloor is 1/2 " plywood covered with particle board. The particle bd and plywood will be replaced with 3/4 T/G OSB. I plan on transitioning from the tile to laminate flooring in dining room and hallway.
1. Will the supports/foundation handle the load of the Tile & thinset and subflooring.?
2. Can I install the tile over the OSB or should I cover the OSB with additional plywood or backer bd?
3. Should I tile the entire floor and put cabinets over the tile? Planning on installing new cabinets, island and granite counter top. Been told by store rep cannot remove granite counter top if dish washer or other appliances usually mounted on subfloor need to be replaced. He recommended installing tile floor first and then cabinets, dish washer, etc. The I can slide out appliances.

Any comments or recommendations would be helpful and very much appreciated.

pinkertonpv is offline   Reply With Quote
Join DIYChatroom.com

Join the #1 DIY Forum Today - It's Totally Free!

DIYChatroom.com - Are you about to start a new home improvement task and need some help? Do you need advise on what products to buy? Or maybe you can give others some advice? No matter where you fit in you'll find that DIY Chatroom is a great community to join. Best of all it's totally free.

Join DIYChatroom.com - Click Here
JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. DIYChatroom.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any home improvement task!
Old 02-02-2009, 06:43 PM   #2
Super Moderator
 
Floorwizard's Avatar
 
Join Date: Dec 2003
Location: Alaska!
Posts: 1,537
Default

If your going to put down new 3/4 OSB subfloor then it would be wise to suppliment with a backerboard.
You could put the tile under the cabs, but that would be at least 50 sq ft of unseen tile for no good reason...sounds like a waste of money really.
The only way to install directly on wood substrate is if the total thickness is 1 1/4 and is completely plywood only. Even then I would add something to help with movement.
__________________
Time to ride again!
Floorwizard is offline   Reply With Quote
Old 02-02-2009, 09:46 PM   #3
K&B Remodeler/Tile Guy
 
angus242's Avatar
 
Join Date: Apr 2008
Location: Illinois
Posts: 886
Default

How far are the joists spaced from each other? That will help determine if your joists are strong enough.

You should use an exterior grade T&G plywood instead of OSB. You're on the low end of what might be an acceptable subfloor for tiling. I'd consider adding maybe another layer of 5/8" exterior grade plywood over the T&G.

You need to use some kind of underlayment for the tile. Cement backer board is one option. A tile membrane is another. Ditra is an excellent product. Easier to install than cement board although it's a bit more expensive. Well worth it in my opinion.

I like to tile under cabinets.
__________________
Angus
My Albums
angus242 is offline   Reply With Quote
Old 02-02-2009, 11:36 PM   #4
Tileman-Manufacturers rep
 
Join Date: Feb 2007
Location: Troy, MI
Posts: 840
Default

Let's start with the joists. You say the span and the room width ia 11'9". Are you sure? Did you measure the span from underneath? Please double check. Please answer Angus's question about the joists' spacing. Would also be nice to know the species and grade of those wimpy 2x8 joists.

I'm not clear how the joists are attached to this girder. I bet there's some give in the girder, no? You will have to reinforce that floor because of the island if everything else is OK, and I don't know yet.

1. 3/4" t&g sub is generally ok, more plywood is better. Don't know about the joists yet. 2x8 joists are too weak in most cases if the span is even a bit less than you stated. Add the island, no good.

2. You can not install tile direct to any OSB.

3. I prefer installing the tilles first, you still don't have to cover the entire floor though. If you install the cabinets first, they need to be shimed up anyway, so the DW is not really an issue.

Jaz
__________________
Tile 4 You Inc. Troy, MI
KERDI Shower Expert...DITRA Installs...Containers of TRAVERTINE Direct from Turkey Quarry...SAVE 40-70%
JazMan is offline   Reply With Quote
Old 02-03-2009, 01:22 PM   #5
Newbie
 
Join Date: Aug 2008
Posts: 26
Default

I appreciate you guys responding.
1. Joists spacing is 16 inches oc. Meant to include in original post.
2. Joists are 11’9” from outside concrete block foundation to inside support girder. Measured from inside the crawl space. Joists are attached to the girder by a ledger board. You can see it in the pictures
3. Don’t know species or grade of wood. Nothing written on joists or ledger, but wood looks like pine or fir. House is 35 years old and located in N. Alabama.
4. Will use exterior plywood instead of OSB and another layer on top of that. Will use ditra if necessary. From the web site it sounds like excellent stuff. May have pros put down tile once I get the sub floor in and all the kitchen prework done.
5. I can add several sister joists where the Island will go. Or will an intermediate support be necessary? The Island will actually be “L” shaped and run along the girder for 5 feet and turn 90 degrees toward the kitchen door for 6 feet. You can see the door in the picture. The wall in the picture will be replaced by a beam supported by a post. The edge of the wall is the outside edge of the island.
Attached Thumbnails
ceramic-tile-over-subfloor-kitchen-kitchen-floor.jpg   ceramic-tile-over-subfloor-kitchen-girder-1.jpg  
pinkertonpv is offline   Reply With Quote
Old 02-03-2009, 10:31 PM   #6
Tileman-Manufacturers rep
 
Join Date: Feb 2007
Location: Troy, MI
Posts: 840
Default

1. OK, 16" o.c. is standard.

2. A span of 11'9" is too much for tile. You need to either sister or install a supporting bean under across those joists. Make sure they all touch, maybe steel I-beam? I think I'd rather sister if there's any obstructions at all.

3. Well OK, you're gonna sister or put in a beam so doesn't matter.

4. Make sure you do NOT buy pressure treated "outdoor" plywood. Get 3/4" subfloor grade plywood, it'll say something like "exposure 1". The underlayment can be thinner, like 3/8" or 1/2" or thicker if you need the height. The more the better. Ditra is a good idea, better than cement board and only adds 1/8", so you can go with thicker plywood.

5. Sounds good cuz you've already done #2.

Jaz
__________________
Tile 4 You Inc. Troy, MI
KERDI Shower Expert...DITRA Installs...Containers of TRAVERTINE Direct from Turkey Quarry...SAVE 40-70%
JazMan is offline   Reply With Quote
Old 02-03-2009, 11:13 PM   #7
Newbie
 
Join Date: Aug 2008
Posts: 26
Default

Jazman; Thanks for the info. I don't think I can add a girder or steel beam under the joists. the run would be over 22' and I would need several concrete block columns. Sistering sounds better, but will I need to sister every joist or can I just sister every other joist. I will be adding the two layers of plywood. Obviously I need to sister joists and increase the strength under the island.
pinkertonpv is offline   Reply With Quote
Old 02-03-2009, 11:42 PM   #8
Tileman-Manufacturers rep
 
Join Date: Feb 2007
Location: Troy, MI
Posts: 840
Default

Adding plywood will not improve your joists' deflection. You should sister every joist because 1. of the island and 2. the joists are overspanned which affects the entire area,

Jaz
__________________
Tile 4 You Inc. Troy, MI
KERDI Shower Expert...DITRA Installs...Containers of TRAVERTINE Direct from Turkey Quarry...SAVE 40-70%
JazMan is offline   Reply With Quote
Old 02-04-2009, 01:25 AM   #9
K&B Remodeler/Tile Guy
 
angus242's Avatar
 
Join Date: Apr 2008
Location: Illinois
Posts: 886
Default

Plywood only adds support to the areas between the joists. You still need to address the over-spanned joists themselves.

Follow Jaz's advice and you're good to go!
__________________
Angus
My Albums
angus242 is offline   Reply With Quote
Reply


More On This Topic

In this clip I'm going to introduce you to the project, and summarize the steps that we take. After a recent kitchen renovation your builder stock white outlet cover and switch plates are going to stand out against your beautiful tile that you have... Read More »

Hi, my name is Kevin and on behalf of Expert Village, I'm going to talk a little bit today about woodworking. When you're woodworking for your home or for a project that you're doing for your business, one of the main things you have to decide is whether... Read More »

Hi I'm Betty Ingham and speaking on behalf of Expert Village and I would like to give you a little information on decorating a Victorian kitchen. One of the neat things about restoring an old Victorian house is you can do it the way you want to we wanted... Read More »

Now we’re going to talk a little bit about the recycled products. The terrazzo type countertop material is usually a ¼ inch, you can even order it thicker than the ¼ inch, ½ inch, and it does have to have underlayment so it doesn... Read More »

How to Trim Tile
How to Trim Tile by eHow.com

Applying tile to a room can add interest as well as accentuate architectural details. Choosing the right tile for trim is very important and can add the proper finishing touch that makes or breaks a project. Read this article to learn more. Read More »

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Ceramic tile over existing (full mud) ceramic? rjniles Flooring 7 12-24-2008 08:12 PM
porcelain versus ceramic tile pandora Flooring 55 11-24-2008 11:01 AM
Ceramic Tile On A Kitchen Wall BustedBungalow Remodeling 17 09-19-2008 05:47 PM
Preping for ceramic tile install leroyme Flooring 21 11-29-2007 05:31 PM
need contractor advice for laying kitchen tile ng622 Flooring 5 12-07-2005 12:28 PM

Top of Page | View New Posts


All times are GMT -4. The time now is 05:21 AM.


Powered by vBulletin® Version 3.8.1
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
© 2003 - 2009 The Building Network LLC