Base molding or carpet first???


I'm finishing the upstairs of my house, and we're still deciding on carpet colors and styles.

I want to get something done, and my door case molding and base moulding would be a good weekend project.

Should I wait to have the carpet installed, or just leave a small gap on the base moulding for the carpet to be tucked into?? Will the base moulding take a beating when the carpet gets installed??

Thanks in advance, I have learned alot here already.

Dan N is offline   Reply With Quote
Old 01-29-2007, 02:51 PM   #2
Lic. Builder/GC/Remodeler
 
AtlanticWBConst.'s Avatar
 
Join Date: May 2006
Location: New England
Posts: 7,556
Rewards Points: 2,000
Default

Base molding or carpet first???


Actually, we always install baseboard prior to carpet installation. We just take scrap 1/2" stock and slide it under the baseboard during it's installation. This keeps the Baseboard up about 1/2" space....

If you install baseboard after the carpet, and years down the road it needs to be removed or replaced - The baseboard is going to have to be removed, since it is holding down the carpet edges against the tack strips.

AtlanticWBConst. is offline   Reply With Quote
Old 01-29-2007, 11:49 PM   #3
Member
 
Floorwizard's Avatar
 
Join Date: Dec 2003
Location: Alaska!
Posts: 1,522
Rewards Points: 1,000
Default

Base molding or carpet first???


Quote:
If you install baseboard after the carpet, and years down the road it needs to be removed or replaced - The baseboard is going to have to be removed, since it is holding down the carpet edges against the tack strips.
__________________

unless the installer knows a bit about install and will keep it far enough away.
Floorwizard is offline   Reply With Quote
Old 01-31-2007, 10:26 PM   #4
remodeling pro
 
Join Date: Sep 2006
Posts: 1,399
Rewards Points: 500
Default

Base molding or carpet first???


You will most likely get some scuffs in the moulding, but it should not get banged up badly(Gouged or cut with razor knife) unless you have the bad luck of poor installers. You want to get the trim up, prepped, and hopefully one finish coat of paint before the carpet, then the second coat will take care of any blems. If you are carpeting with any type of plush rug with padding, just use the thickness of the base moulding, 1/2" to 9/16", to space the trim off the floor. If you are thinking one of the thinner, more commercial-like products without any padding, I would lessen the spacer to 1/4" to 3/8" to prevent any unsightly gaps.
troubleseeker is offline   Reply With Quote
Old 01-31-2007, 10:48 PM   #5
Lic. Builder/GC/Remodeler
 
AtlanticWBConst.'s Avatar
 
Join Date: May 2006
Location: New England
Posts: 7,556
Rewards Points: 2,000
Default

Base molding or carpet first???


Quote:
Originally Posted by troubleseeker View Post
You will most likely get some scuffs in the moulding, but it should not get banged up badly(Gouged or cut with razor knife) unless you have the bad luck of poor installers. You want to get the trim up, prepped, and hopefully one finish coat of paint before the carpet, then the second coat will take care of any blems. If you are carpeting with any type of plush rug with padding, just use the thickness of the base moulding, 1/2" to 9/16", to space the trim off the floor. If you are thinking one of the thinner, more commercial-like products without any padding, I would lessen the spacer to 1/4" to 3/8" to prevent any unsightly gaps.
Good suggestions.
AtlanticWBConst. is offline   Reply With Quote
Old 02-01-2007, 09:29 AM   #6
Handyguy
 
Brik's Avatar
 
Join Date: Jan 2007
Location: SE PA
Posts: 803
Rewards Points: 500
Send a message via Skype™ to Brik
Default

Base molding or carpet first???


What they said ^^^^^^
I asked this same question of an installer yesterday! Low pile Berber, top end pad, below grade slab (basement). His recommendation was 3/8", install before. His point was you don't want to be cutting and dealing with say dust after the carpet is in. He also said, carpet should be the absolutely last thing to go in.

Brik is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Base molding helpless handyman Carpentry 16 04-01-2008 06:06 PM
Gaps at baseboards after carpet install cometbus Flooring 9 10-01-2007 08:48 PM
Carpet Glued On OLD linoleum-HELP gradlass Flooring 5 09-30-2007 09:26 PM
Carpet Nightmare The Nomad Remodeling 3 09-30-2007 09:25 PM
glued down carpet...can I cheat? Dusty Flooring 3 10-10-2006 06:18 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.