Dan N 01-29-2007 01:07 PM

Base molding or carpet first???
 
I'm finishing the upstairs of my house, and we're still deciding on carpet colors and styles.

I want to get something done, and my door case molding and base moulding would be a good weekend project.

Should I wait to have the carpet installed, or just leave a small gap on the base moulding for the carpet to be tucked into?? Will the base moulding take a beating when the carpet gets installed??

Thanks in advance, I have learned alot here already. :thumbsup:

AtlanticWBConst. 01-29-2007 01:51 PM

Actually, we always install baseboard prior to carpet installation. We just take scrap 1/2" stock and slide it under the baseboard during it's installation. This keeps the Baseboard up about 1/2" space....

If you install baseboard after the carpet, and years down the road it needs to be removed or replaced - The baseboard is going to have to be removed, since it is holding down the carpet edges against the tack strips.

Floorwizard 01-29-2007 10:49 PM

Quote:

If you install baseboard after the carpet, and years down the road it needs to be removed or replaced - The baseboard is going to have to be removed, since it is holding down the carpet edges against the tack strips.
__________________

unless the installer knows a bit about install and will keep it far enough away.

troubleseeker 01-31-2007 09:26 PM

You will most likely get some scuffs in the moulding, but it should not get banged up badly(Gouged or cut with razor knife) unless you have the bad luck of poor installers. You want to get the trim up, prepped, and hopefully one finish coat of paint before the carpet, then the second coat will take care of any blems. If you are carpeting with any type of plush rug with padding, just use the thickness of the base moulding, 1/2" to 9/16", to space the trim off the floor. If you are thinking one of the thinner, more commercial-like products without any padding, I would lessen the spacer to 1/4" to 3/8" to prevent any unsightly gaps.

AtlanticWBConst. 01-31-2007 09:48 PM

Quote:

Originally Posted by troubleseeker (Post 31958)
You will most likely get some scuffs in the moulding, but it should not get banged up badly(Gouged or cut with razor knife) unless you have the bad luck of poor installers. You want to get the trim up, prepped, and hopefully one finish coat of paint before the carpet, then the second coat will take care of any blems. If you are carpeting with any type of plush rug with padding, just use the thickness of the base moulding, 1/2" to 9/16", to space the trim off the floor. If you are thinking one of the thinner, more commercial-like products without any padding, I would lessen the spacer to 1/4" to 3/8" to prevent any unsightly gaps.

Good suggestions. :yes:

Brik 02-01-2007 08:29 AM

What they said ^^^^^^
I asked this same question of an installer yesterday! Low pile Berber, top end pad, below grade slab (basement). His recommendation was 3/8", install before. His point was you don't want to be cutting and dealing with say dust after the carpet is in. He also said, carpet should be the absolutely last thing to go in.