Main Bathroom Gut


This project began the week after Christmas, me and my fiancÚ took a week off of work and attempted our version of Renovation Realities.

The idea was to gut the room, rebuild the shower, insulate, and have it done in a week. Yeah who were we kidding. A month and a half later it is still not complete but it is functional. This is our only bathroom.

Starting with the before of course.
This was after I pulled up the vinyl 12x12. Ugly wall tile, boxed in shower and hidden toilet.








Oh and the various surface mold issues



Beginning of demo:
Removing Tile:


Removing Tub/Shower Surround and divider wall:


Oh and little bit of mold behind the surround


Who doesn't like a little plaster and lathe


Last edited by khappe; 02-01-2012 at 10:01 AM. Reason: correcting picture links
khappe is offline   Reply With Quote
Old 02-01-2012, 10:23 AM   #2
Newbie
 
Join Date: Jan 2012
Posts: 7
Rewards Points: 0
Default

Main Bathroom Gut


Keep at it mate, it,ll look brilliant when finished! Are you keeping all of your previous bathroom furniture ect?

josh1998 is offline   Reply With Quote
Old 02-01-2012, 10:37 AM   #3
Newbie
 
Join Date: Feb 2012
Location: Pittsburgh, PA
Posts: 10
Rewards Points: 0
Default

Main Bathroom Gut


Once all the plaster and lathe was removed we discovered that our main stack was rusted out.


We always had a slight sewer smell in the basement but thought it was just the sewer line on the road outside. (city living, old pipes)
After a lengthy conversation with the fiance we decided the main stack was over my head and with the risk of not having working plumbing if I break something on New Years Eve weekend. We got a plumbing who was able to replace the stack from the basement to the room above the bathroom.
Everything they took out:


So after everything was inspected and approved I was finally able to start rebuilding.
Built a bump out around the 4 inch stack, floor to ceiling:

Repaired floor under toilet, previous water damage destroyed floor and sub floor. New 3/4 OSB to match old t and g floor, and then 1/2 hardibacker for eventual tile.


Life got a little better once the drywall started going up:
All the drywall was 1/2 Mold and Moisture Resistant



Also got the hardi up for the new shower tile.
khappe is offline   Reply With Quote
Old 02-01-2012, 10:40 AM   #4
Coconut Pete's paella!
 
CoconutPete's Avatar
 
Join Date: Jan 2010
Location: Charlotte, NC / Denmark
Posts: 1,318
Rewards Points: 0
Default

Main Bathroom Gut


Nice!
CoconutPete is offline   Reply With Quote
Old 02-01-2012, 11:03 AM   #5
Newbie
 
Join Date: Feb 2012
Location: Pittsburgh, PA
Posts: 10
Rewards Points: 0
Default

Main Bathroom Gut


So after a few days of joint compound and sanding sessions after work, it was primed. Then I started on the shower:
Tile finished with my dog's inspection.

New shower rod, reused the facet and control since I just bought it last year.



Cheap clear shower curtain for now until we get colors.
Light color tile was bought at a reuse/savage place, here in Pittsburgh http://www.constructionjunction.org/
We had just enough to do the entire wall and paid about a 1/3 of the cost.


Quote:
Originally Posted by josh1998 View Post
Are you keeping all of your previous bathroom furniture ect?
We replaced the toilet since it was about 20 years old, kept the tub since it is cast iron and cleaned up well. We will refinish it in the summer when we can vent the house. Will be replacing the sink but keeping the wall vanity. Trying to keep costs down as much as possible.
khappe is offline   Reply With Quote
Old 02-02-2012, 08:19 AM   #6
Coconut Pete's paella!
 
CoconutPete's Avatar
 
Join Date: Jan 2010
Location: Charlotte, NC / Denmark
Posts: 1,318
Rewards Points: 0
Default

Main Bathroom Gut


Looking good.
CoconutPete is offline   Reply With Quote
Old 02-02-2012, 10:24 PM   #7
Member
 
Join Date: Mar 2010
Location: New York
Posts: 1,743
Rewards Points: 0
Default

Main Bathroom Gut


Why are there different tiles on the wall adjacent to your plumbing wall?
Jim F is online now   Reply With Quote
Old 02-15-2012, 09:56 AM   #8
Member
 
Join Date: Feb 2012
Location: Dallas, TX
Posts: 118
Rewards Points: 0
Default

Main Bathroom Gut


Very nice, looking good. Were they able to pull the stack from the bathroom, or did they need to cut access above and below?
Double is offline   Reply With Quote
Old 02-20-2012, 01:40 PM   #9
Newbie
 
Join Date: Feb 2012
Location: Pittsburgh, PA
Posts: 10
Rewards Points: 0
Default

Main Bathroom Gut


Quote:
Originally Posted by Jim F View Post
Why are there different tiles on the wall adjacent to your plumbing wall?
Decided to do accent wall with tile, something different. Fiance liked the idea.

Quote:
Originally Posted by Double View Post
Very nice, looking good. Were they able to pull the stack from the bathroom, or did they need to cut access above and below?
We already had the room gutted, plus I already had the room above it opened when I was looking to fit it myself, basement is unfinished. Basiclly I did all the work openning the walls before they came.
khappe is offline   Reply With Quote
Old 02-20-2012, 01:57 PM   #10
Newbie
 
Join Date: Feb 2012
Location: Pittsburgh, PA
Posts: 10
Rewards Points: 0
Default

Main Bathroom Gut


Finally have a floor after a three week break.

First we decided to splurge and do the in floor heating. The blue wire corrected before I titled.





Cutting the half circles was a pain, I messed up one side but it was covered by the toilet.


Thermostat for the floor, tested and it works! Floor is nice and toasty instead of ice cold.



To do punch list: Paint, Vanity, Sink, cabinet and shelving above toilet, towel racks.
khappe is offline   Reply With Quote
Old 02-20-2012, 04:38 PM   #11
Enormous Member
 
skipjack's Avatar
 
Join Date: Aug 2008
Posts: 122
Rewards Points: 0
Default

Main Bathroom Gut


I have the same situation... only one bathroom in the house and I'd like to gut the whole thing and replace the tub/toilet/vanity. I'm curious... how did you coordinate removing/replacing fixtures with minimal downtime?
skipjack is offline   Reply With Quote
Old 02-20-2012, 07:46 PM   #12
Newbie
 
Join Date: Feb 2012
Location: Pittsburgh, PA
Posts: 10
Rewards Points: 0
Default

Main Bathroom Gut


Quote:
Originally Posted by skipjack View Post
I have the same situation... only one bathroom in the house and I'd like to gut the whole thing and replace the tub/toilet/vanity. I'm curious... how did you coordinate removing/replacing fixtures with minimal downtime?
The toliet was only out of service for about 10 hours when they replaced the main stack. When I put the tile down I did it sections, made sure I had all the parts and plan, plan plan. The shower was out of service for about two weeks, luckily my mother only lives a half mile away. It was an inconvenience but we worked around it. Still don't have a sink but hey that's why we have a kitchen sink. Plan for the worse but you probably could do most of it in a long, stinky weekend. - that is if you don't have to replace the stack and call a plumber.
khappe is offline   Reply With Quote
Old 02-21-2012, 02:09 PM   #13
Newbie
 
Join Date: Aug 2011
Posts: 11
Rewards Points: 0
Default

Main Bathroom Gut


Looking good.
I may opt to do the Heated Floor myself once I replace the Joists below the 1st Floor Bath, or the 2nd Floor Bath.
I am still open to doing a few ideas as I am still gutting the House.
One was to double up the floor joists on the Bathroom areas and maybe lay marble or something heavy.

Keep up the work, especially if you finish the basement and add a 1/2 bath.
Engineer3D is offline   Reply With Quote
Old 02-23-2012, 03:05 PM   #14
Member
 
Join Date: Feb 2012
Location: Dallas, TX
Posts: 118
Rewards Points: 0
Default

Main Bathroom Gut


I'm going to gut a remodel an upstairs bathroom in the near future, similarly sized to yours but no plaster and lathe to deal with.

Do you no about how much your entire heated underlayment setup ran? I would love to add something similar...
__________________
Doing things almost the right way...
Double is offline   Reply With Quote
Old 02-24-2012, 09:04 AM   #15
Newbie
 
Join Date: Feb 2012
Location: Pittsburgh, PA
Posts: 10
Rewards Points: 0
Default

Main Bathroom Gut


I got the system from HD. I know there are more expensive, probably even better systems out there. It seemed to get good reviews on their site.

Mat: I only needed the 6ft but they make various sizes at different price points.
http://www.homedepot.com/webapp/wcs/...5#BVRRWidgetID

Control:
http://www.homedepot.com/h_d1/N-5yc1...&storeId=10051

IMO it has been working well. However since I installed it we haven't had really cold weather to really give it a real test. Could be a little warmer but I haven't had a chance to customize the programs yet.

khappe is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Wondering if it makes economic sence to replace a bathroom exhaust fan ChrisJJ HVAC 0 06-14-2011 10:36 AM
worth it in terms of energy savings to replace bathroom exhaust fans? ChrisJJ Electrical 0 06-14-2011 10:17 AM
Bathroom DWV Layout Problems grymes56 Plumbing 8 05-15-2011 09:00 AM
Leaking cast iron drain pipes + roots in 4" main line aminus21 Plumbing 5 09-25-2010 10:21 AM
Main bathroom remodel MagicalHome Remodeling 4 06-02-2010 06:44 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.