Finishing Our Basement


Thought I'd upload a few of my projects since joining the forum.

We finished the bulk of the work a few weeks ago.
I did the framing, insulating, the drop ceiling, the baseboards, the bathroom sink and toilet install, hung the doors, etc.
I had a drywaller come in for the drywall...he also painted. We did a trade of services as I run a small graphic design business that also does websites...he got a nice website and I got my basement painted.
I probably would have painted it myself, but we were pressed for time and needed it done quickly as we were expecting our second child in a matter of weeks.
We also brought in someone to wire the basement...the same gentleman who was the GC for our house, which was built a couple years prior.
We brought in a plumber to run the lines to the bathroom as well...since plumbing isn't my thing, plus we have PEX plumbing in the house...didn't want to mess with it.

Here's a photo gallery of the process:
https://picasaweb.google.com/1127192...eat=directlink

Advertisement

cprice12 is offline   Reply With Quote
Old 02-11-2012, 12:38 AM   #2
Member
 
Join Date: Dec 2011
Location: Wisconsin
Posts: 141
Rewards Points: 81
Default

Finishing Our Basement


That looks great.

Advertisement

Total Tool is offline   Reply With Quote
Old 02-11-2012, 11:25 PM   #3
Registered User
 
Join Date: Mar 2009
Posts: 9,983
Rewards Points: 2,032
Default

Finishing Our Basement


I see a lot of fire-blocking missing, among other things, no permit, right?

How to fireblock framing

Gary
__________________
If any ads are present in my answer above, I do not condone/support/use the product or services listed, they are there against my permission.
Gary in WA is offline   Reply With Quote
The Following User Says Thank You to Gary in WA For This Useful Post:
coderguy (02-21-2012)
Old 02-12-2012, 12:47 AM   #4
Blues Hockey Fan
 
cprice12's Avatar
 
Join Date: Jan 2011
Location: Southern Illinois
Posts: 85
Rewards Points: 75
Default

Finishing Our Basement


Quote:
Originally Posted by GBR in WA
I see a lot of fire-blocking missing, among other things, no permit, right?

How to fireblock framing

Gary
How do you figure?
All cavities are sealed...except for the geothermal pipes through the top plate in one cavity and maybe the cavity in the bathroom where the plumbing comes in...which both can be fixed since I put in a drop ceiling and I have access. There is no gap between the framed walls and rigid insulation board and drywall goes from bottom plate to top plate everywhere.
We even drywalled on the utility room side of the walls...and again, sealed from top to bottom.
cprice12 is offline   Reply With Quote
Old 02-12-2012, 03:30 PM   #5
Registered User
 
Join Date: Mar 2009
Posts: 9,983
Rewards Points: 2,032
Default

Finishing Our Basement


I'm doing this from memory as your link is closed temp. by Google right now.

The top of the foam requires fire-blocking between it (foamboard)/floor cavity above.
Require a p.t. bottom plate- maybe existing- hard to distinguish in picture. Suggest on a foam (poly) sill sealer for a thermal/air/capillary break: http://www.greenbuildingadvisor.com/...-building-code Otherwise the studs act as thermal heat sinks connected to the bottom plate, sitting on the cold slab on the earth. If missing poly under the slab, water will wick to the warm studs through the warm bottom plate (temperature/pressure difference).

The foam/frame wall requires fire-stopping studs every 10' lineally along the walls as per code: http://publicecodes.citation.com/ico...002_par031.htm

The foam tops and 10' rule are very important to keep an outlet fire localized in a 10' wide section of wall rather than run on the foams' surface horizontally in a flash or get into a joist cavity above and race across the floor bottom to access the floor above through a wire/plumbing hole possibly reaching the attic with the pressure difference of the "stack effect": http://www.wag-aic.org/1999/WAG_99_baker.pdf

I hope you air-sealed all holes in the floor sheathing above before drywalling. Check locally, the ceiling above the drop ceiling may need drywall per code- local AHJ.

Gary
__________________
If any ads are present in my answer above, I do not condone/support/use the product or services listed, they are there against my permission.
Gary in WA is offline   Reply With Quote
Old 02-12-2012, 06:03 PM   #6
Blues Hockey Fan
 
cprice12's Avatar
 
Join Date: Jan 2011
Location: Southern Illinois
Posts: 85
Rewards Points: 75
Default

Finishing Our Basement


Quote:
Originally Posted by GBR in WA
I'm doing this from memory as your link is closed temp. by Google right now.

The top of the foam requires fire-blocking between it (foamboard)/floor cavity above.
Require a p.t. bottom plate- maybe existing- hard to distinguish in picture. Suggest on a foam (poly) sill sealer for a thermal/air/capillary break: http://www.greenbuildingadvisor.com/...-building-code Otherwise the studs act as thermal heat sinks connected to the bottom plate, sitting on the cold slab on the earth. If missing poly under the slab, water will wick to the warm studs through the warm bottom plate (temperature/pressure difference).

The foam/frame wall requires fire-stopping studs every 10' lineally along the walls as per code: http://publicecodes.citation.com/ico...002_par031.htm

The foam tops and 10' rule are very important to keep an outlet fire localized in a 10' wide section of wall rather than run on the foams' surface horizontally in a flash or get into a joist cavity above and race across the floor bottom to access the floor above through a wire/plumbing hole possibly reaching the attic with the pressure difference of the "stack effect": http://www.wag-aic.org/1999/WAG_99_baker.pdf

I hope you air-sealed all holes in the floor sheathing above before drywalling. Check locally, the ceiling above the drop ceiling may need drywall per code- local AHJ.

Gary
I used pt base plates along the foundation walls and sill sealer foam under interior wall base plates.

I didn't drywall the ceiling, it's a suspensed ceiling...but there aren't holes in the subfloor above the finished area anyway. Any pipes and wires going through the subfloor occur in the unfinished utility area...except for a couple ducts, which I just realized.

You're suggesting I drywall above the drop ceiling? That's ridiculous. Who does that???

I did not fire stop on the top edge of the foam behind the exterior walls...which seems to be the only thing I didn't do. I have access to it through the drop ceiling...barely. Would a 2x2 on top suffice? Or fire foam?
And I assume fire foam is fine around the duct edges that go through the subfloor?

Thanks for the tips.

Last edited by cprice12; 02-12-2012 at 06:07 PM.
cprice12 is offline   Reply With Quote
Old 02-21-2012, 03:39 PM   #7
Blues Hockey Fan
 
cprice12's Avatar
 
Join Date: Jan 2011
Location: Southern Illinois
Posts: 85
Rewards Points: 75
Default

Finishing Our Basement


Before we were finished with the ceiling, my dad was helping cut tiles. He probably cut the toughest shape one in the whole project. I goofy shaped one coming out of the octagon, against a boxed in duct, it seemingly had 8 sides. I set it aside until I was able to cut a hole in it for the recessed light, which wasn't going to be for a few days.

Later that night, my 2 year old daughter was down there and grabbed a pencil and proceeded to draw all over the face of it. She brought it to me and said, "Look daddy...it's so very beautiful!!"

After that initial moment of GAAAAHH!! I looked at how proud she was of it, then I took the panel, cut the hole in it for the light and put it up.
Best looking ceiling panel in the basement.

Advertisement

cprice12 is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Finishing a cement basement floor with carpet and tile - no subfloor? vseven Flooring 2 09-21-2010 10:41 AM
Finishing basement - insulation problem? Gooter Building & Construction 6 08-24-2009 09:23 AM
A few Q's on Finishing My Basement - Is there a FAQ on this? ossrocks Remodeling 6 01-07-2009 01:21 PM
Finishing basement - low ceilings alyuka Remodeling 1 01-05-2009 09:13 PM
finishing a basement jimmyfloyd Building & Construction 2 10-21-2008 01:30 PM




Top of Page | View New Posts