Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > Painting

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Search this Thread Display Modes
Old 03-11-2007, 01:20 AM   #1
Newbie
 
Join Date: Mar 2007
Posts: 1
Rewards Points: 10
Default

Painted Tub With Epoxy, Didn't work.. Need your advice


Hi, I have a tub that's made of metal, Iron I think. The original paint was scraped off and it developed a black rust spot. So I went and got a pack of klenks bathtub and tiles epoxy paint repair kit. I followed the instructions supplied in the package and painted over the rust spot and entire tub with rustoloneum metal primer paint and then use the epoxy. I used it when the temps were under 50'f degree, so I put in a space heater. Everything went ok until the 3rd coat, a piece of the brush fell onto the epoxy paint, so I used my fingers to pick it up and it torned a piece of the paint off. I just painted it over that spot. This was the 3rd coat and 6 hours had already passed. The package said once the two epoxy mixes are mixed you must use it within 10 hours. I left the space heater running on high for 2 more hours. When I came back, there were full of blisters. I pull the blisters off and painted it again. I used the same roller and brush included in the package. I put the brush in water and roller in the paint can in between uses. Now, there is a deep curve where I picked up the brush piece with just 1 coat of epoxy, and the rest of the tub has a deeper coats of epoxy. There's also some solid rock shapes next to the hole. It's near the back of the tub.

What should I do now? Should I buy another epoxy tub paint kit or leave it as is and wait and see?

waiting for your advices....

diyfan902 is offline   Reply With Quote
Old 03-11-2007, 04:55 PM   #2
Member
 
Join Date: Jan 2007
Location: Des Moines, IA
Posts: 1,137
Rewards Points: 572
Default

Painted Tub With Epoxy, Didn't work.. Need your advice


I have used the same thing on my tub. But the directions need to be followed exactly. You are to first clean the tub with muratic acid, let it dry for 24 hrs. Then you scrub with steel wool. Apply first coat and wait 24 hrs. Then again you use steel wool. Add 2nd coat and wait 3 days to allow it to cure. Start to finish the process takes about 5 days. I had to shower in the basement for this time. The box say only to use 2 coats.

You might have not let the primer dry long enough or waited long enough between coats. I would let it sit for a couple of days and then start over. Make sure you start with a smooth surface.

cibula11 is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Am I being overcharged for general construction work? baloney12 Building & Construction 2 07-11-2007 07:09 PM
Painted deck - advice needed! Sallie Painting 5 03-23-2007 12:03 AM
is this bad tiling work? garrick Flooring 17 09-27-2006 01:30 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.