Good afternoon, all. I'm preparing to renovate our bathrooms, both of which are now wallpapered. Once I remove the wallpaper, what wall preparation should be done before actually applying the paint?
Also I was considering using Behr's Faux Bellagio application. A friend has done that particular wall treatment and it looks pretty impressive.
|
|
|
|
|
|
#2 |
|
Tired, Cold, and Damp
Join Date: Aug 2005
Location: Cape Cod
Posts: 3,089
|
Bathroom Renovation
Hello there
The next steps would depend on the condition of what's left of/on the wall, and/or what came off the wall If all went well, removal of any remaining adhesive would be the next step (your local paint shop will have the proper cleaner) Ideally, a good sanding and wiping of sanding dust and a good premium primer should set you up nicely for the rest of your project If you run into some snags in the removal process, then the steps would depend on what exactly your project needs For example: If during removal you tear up some drywall spots, the exposed drywall paper should be primed, smoothed over or filled in with joint compound, sanded smooth, then primed again before any paint is applied But things like that depend on what you are left with after removed |
|
|
|
|
|
#3 |
|
Tile and Paint contractor
Join Date: Jan 2007
Location: Charlotte, NC
Posts: 84
|
Bathroom Renovation
make sure you get ALL the paper off.
do not leave any paper on there any paper that is painted over will bubble, then you are just kicking your own butt get all that crud off there then spackle the areas that need attention sand it spackle again if necessary you want a baby smooth surface with no bumps or divets then prime i'd use two coats primer then your paint I'd recommend a sherwin williams glaze over behr youd be amazed how well spent an extra 20 bucks or so is on a quality product i wouldn't paint a lemonade stand sign with behr paint
__________________
Matt | tile contractor Charlotte, NC |
|
|
|
|
|
#4 |
|
Member
Join Date: May 2006
Posts: 73
|
Bathroom Renovation
apply joint compound and sand.
|
|
|
|
|
|
#5 |
|
Member
Join Date: Jan 2007
Location: South Texas
Posts: 246
|
Bathroom Renovation I followed suggestions in this thread, sanded, cleaned, primed and painted.I used Zinsser 1-2-3 primer and Lowe's American Tradition satin semi-gloss for the base coat and Valspar ssg mixed 1:1 with a glaze for the faux. Yesterday, I had some other work done and the workers taped on some of the painted finish. I expected I would have to do some touch up, HOWEVER, I did not expect the paint treatment to peel off i sheets down to the Zinsser! What did I do wrong and what can I do now to fix it?
|
|
|
|
|
|
#6 |
|
Member
Join Date: Jan 2007
Location: South Texas
Posts: 246
|
Bathroom Renovation
I forgot to add that I was able to get all the old wallpaper off and then sanded the surface to remove the glue before I ever primed.
There was no damage done to the sheetrock.
|
|
|
|
|
|
#7 |
|
Newbie
Join Date: Feb 2007
Posts: 6
|
Bathroom Renovation
The glaze is water based right?...just making sure.
|
|
|
|
|
|
#8 |
|
Tired, Cold, and Damp
Join Date: Aug 2005
Location: Cape Cod
Posts: 3,089
|
Bathroom Renovation
Just to be clear
The finish you did has been there a month Some workers used tape on it this week When the tape was pulled up, huge sections of what you had done came up with the tape ? Although the AmTrad isn't that much better than the Behr, and that could be the problem, I'd like to know how long it had to cure, and exactly what type of tape the workers used, and how long it was on there |
|
|
|
|
|
#9 |
|
Member
Join Date: Jan 2007
Location: South Texas
Posts: 246
|
Bathroom Renovation
The label said it was for use with latex-based paint. So I assumed it was ok.
ps where in Texas are you? |
|
|
|
|
|
#10 |
|
Member
Join Date: Jan 2007
Location: South Texas
Posts: 246
|
Bathroom Renovation
Slick your post didn't come thru til after I answered Rick.
Yes it has been about a month. When the workers pulled the tape off, the finish came up in a few places. I didn't think it was a big deal until I realized that both the base coat and glaze coat came up, leaving the Zinsser bare. Rick and Slick [ hey I made a rhyme LOL] it's no big deal to redo the paint job, it's a tiny bath with a probably less than 100 sq feet to be redon. I just want to do it right, I thought I had done all my prep work right the 1st time. |
|
|
|
|
|
#11 |
|
Member
Join Date: Jan 2007
Location: South Texas
Posts: 246
|
Bathroom Renovation
Also, the tape looked like masking tape and was on only overnight.
When they were removing it, it did not look like they had applied it with tons of pressure. They were refinishing my bath and countertop and were protecting everything from overspray. ps we are over the moon at how the bathtub and counter came out. |
|
|
|
|
|
#12 |
|
Tired, Cold, and Damp
Join Date: Aug 2005
Location: Cape Cod
Posts: 3,089
|
Bathroom Renovation
Well, it had plenty of time to cure, that's not it
They could have used a better, more paint friendly tape They really should've used blue or green painter's tape But there's no way to tell if that was the problem from here It may have been the AmTrad just didn't stick (the Zinsser did) Maybe the masking tape rather than painter's tape, didn't help But after a month of cure, it shouldn't have pulled up anyway If you are going to do it over, I'd suggest going to a Ben Moore dealer, or Sherwin Williams store, whichever seems friendliest(or is closest), and tell/show them what you want to do, and use the products they recommend They can match any colors you need, that won't be a problem Just bring in any chips, cans, samples, or whatnot Be sure to scrape up any and all loose stuff before beginning (again) If an overnight masking tape job pulled it up before, I suspect a little scraping will lift a bunch of it PS Over the moon is good right? |
|
|
|
|
|
#13 |
|
Newbie
Join Date: Feb 2007
Posts: 6
|
Bathroom Renovation
shapeshifter, I'm near Dallas.
|
|
|
|
|
|
#14 |
|
Member
Join Date: Jan 2007
Location: South Texas
Posts: 246
|
Bathroom Renovation
To Slick, yes over the moon is good. The budget just wouldn't handle a $10k re-do. We found a company in San Antonio that refinishes just about anything you can think of. The tub was an 80s model fiberglass tub and surround all in one. They used an oyster-white color and you need sunglasses because it is to bright and clean. The counter was 80s cultured marble with sink [not one of the hokey shell-shaped ones thankfully] and they gave it a brown granite finish. Truthfully, most anything except a faux finish would have been an improvement.
When I scrape the other stuff, how aggressive should I get? Should I hand sand or liquid sand? Should I scrape and re-prime? Sorry to ask so many questions. |
|
|
|
|
|
#15 |
|
Tired, Cold, and Damp
Join Date: Aug 2005
Location: Cape Cod
Posts: 3,089
|
Bathroom Renovation
I would get aggressive
You don't want any "kinda" loose stuff left on the wall There should be no question whats left is sticking I think after you start, you'll know how it will go If the stuff starts flaking off left and right, you'll know it was bound to fail If it's on there good and won't budge, then it was the workmen's tape that ruined it, and you'll only have to worry about the edges Hand sand-no liquid Depending on what you end up with, you'll probably have to prime to seal in what's left It depends on your faux too Ask where you get your faux materials to be sure |
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Wiring in New Addition? | sandyman720 | Electrical | 6 | 11-27-2011 04:34 PM |
| my bathroom renovation | rb_in_va | Remodeling | 11 | 06-16-2008 06:19 AM |
| Second level / attic bathroom size | moneymgmt | General Discussion | 2 | 05-02-2007 08:32 AM |
| Bathroom Renovation | TonyD | Remodeling | 6 | 01-11-2007 12:28 AM |