![]() |
Construction dictionary
I stole this from an old friend.
Construction dictionary CONTRACTOR: A gambler who never gets to shuffle, cut or deal. BID OPENING: A poker game in which the losing hand wins. Bid: A wild guess carried out to two dedimal points. LOW BIDDER: A contractor who is wondering what he left out. ENGINEERS ESTIMATE: The cost of construction in Heaven. PROJECT MANAGER: The conductor of an orchestra in which every musician is in a different union. CRITICAL PATH METHOD: A management tefhnique for loosing your shirt under perfect control. OSHA: A protective coating made by half-baking a mixture of fine print, red tape, split hairs and baloney-usually applied at random with a shotgun. DELAYED PAYMENT: A tourniquet applied at the pockets COMPLETION DATE: A point at which liquidated damages begin. LIQUIDATED DAMAGES: A penalty for failing to achieve the impossible. AUDITOR: People who comein after the war is lost and bayonet the wounded |
...and all true.:)
|
| All times are GMT -4. The time now is 08:54 PM. |
© 2003 - 2010 The Building Network LLC