Go Back   DIY Chatroom Home Improvement Forum > The Break Room > Off Topic

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Closed Thread
 
Thread Tools Search this Thread Display Modes
Old 06-17-2010, 01:07 AM   #1
Newbie
 
Join Date: Jun 2010
Posts: 2
Rewards Points: 10
Default

Buildout of a specialty room?


We are building a room inside of the warehouse we own a 1200 foot. Please give comments on estimated supplies by the builder let me know what you guys think.

Thanks

length 432 inch
width 312 inches

13.5 ft. ceiing
2x4 120 5.85 $702.00
2x6 17 8.77 $149.09
OSB Sheathing 60 11.97 $718.20
Ply Wood (32 sq. ft. sheets) 15 13.75 $206.25
Farmhand Full Round Head Framing Nailer Nail Gun Kit 1 121.26 $121.26
Skil 10" 15 Amp Table Saw 3305-01 1 99.99 $99.99
Campbell Hausfeld 2-Gal Twinstack Air Compressor FP2095 1 67.99 $67.99
Electrical Wiring (100ft. Roll) 2 45 $90.00
2000 ct. framing nails 3 35 $105.00
Foam Insulation (16 oz. can) 5 3.96 $19.80
Interior Door 3 62.00 $186.00
$2,465.58

sunnycali3 is offline  
Old 06-17-2010, 04:47 AM   #2
Tool Geek
 
PaliBob's Avatar
 
Join Date: Jun 2008
Location: Pacific Palisades CA
Posts: 2,534
Rewards Points: 2,048
Default

Buildout of a specialty room?


Sunny, Welcome to the Forum

This is a DIY Forum. While there are a lot of experienced folks on this Forum, asking us to second guess on an unknown design in an unknown location for an unknown purpose is just not practical.

.

__________________
Disclaimer
& Stay Safe
.....Bob Lavery
PaliBob is offline  
Old 06-17-2010, 04:54 AM   #3
Tool Geek
 
PaliBob's Avatar
 
Join Date: Jun 2008
Location: Pacific Palisades CA
Posts: 2,534
Rewards Points: 2,048
Default

Buildout of a specialty room?


Quote:
Originally Posted by sunnycali3 View Post
Please give comments on estimated supplies by the builder let me know what you guys think.?
You do not have a builder
A builder has his own tools.
.
__________________
Disclaimer
& Stay Safe
.....Bob Lavery
PaliBob is offline  
Old 06-17-2010, 07:13 AM   #4
DIY staff

 
Join Date: Sep 2009
Location: Kane county,Illinois
Posts: 22,152
Rewards Points: 2,946
Default

Buildout of a specialty room?


Check your local codes,too. Most often 5/8 fire stop is required. Some areas require conduit for electrical in commercial work.--Mike--
oh'mike is online now  
Old 06-17-2010, 09:11 AM   #5
Member
 
Join Date: Jan 2009
Location: South of Boston, MA
Posts: 17,248
Rewards Points: 2,000
Default

Buildout of a specialty room?


This site is for DIY, not cost estimates

You have started 2 threads on this same issue, please do not start a 3rd
Scuba_Dave is offline  
Closed Thread


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Insulating a cold/well room? Lynch Building & Construction 23 07-25-2014 03:49 PM
advice/Help on non-permitted bonus room? Orange_County General DIY Discussions 43 06-11-2010 06:06 PM
What Makes A Room A Bedroom? HowToGuy Remodeling 11 02-26-2010 03:44 PM
First Question: How to cool this room? Warhammer: 3025 HVAC 4 03-25-2009 11:02 AM
Room to Room Vent cjpilot HVAC 5 12-02-2007 09:53 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.