DIY Chatroom -  DIY Home Improvement Forum
    DIY Forum     DIY Blogs     Photos     Woodworking     Advertise     Contact Us  

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   DIY Chatroom - DIY Home Improvement Forum > DIY Repair > General Discussion

Reply
 
Thread Tools Search this Thread Display Modes
Old 05-09-2006, 02:57 PM   #1
Newbie
 
Join Date: May 2006
Posts: 8
Angry

Who's responsible? Part II


My contractor had to run a 4 inch sewer line from the back of my house,(where the extension is built) through an existing wall which had to be torn down, to make the connection to my main sewer in the basement in the front of my house. Who's responsible for putting my wall back up? The contractor told me that he would be able to connect the sewer to a 3 inch drain pipe that runs through the same wall. The city said he coud'nt do it. Since he made the mistake I think he should put my wall back up.........What do you guys think I should do?

johnny558 is offline   Reply With Quote
Join DIYChatroom.com

Join the #1 DIY Forum Today - It's Totally Free!

DIYChatroom.com - Are you about to start a new home improvement task and need some help? Do you need advise on what products to buy? Or maybe you can give others some advice? No matter where you fit in you'll find that DIY Chatroom is a great community to join. Best of all it's totally free.

Join DIYChatroom.com - Click Here
JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. DIYChatroom.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any home improvement task!
Old 05-11-2006, 07:45 AM   #2
747
registered
 
747's Avatar
 
Join Date: Feb 2005
Location: Illinois (kankakee county)
Posts: 939
Default

Who's responsible? Part II


I honestly don't know. I wish more of the big boys would stop by this forum. For some reason only a hand full stop bye.

747 is offline   Reply With Quote
Old 05-11-2006, 02:08 PM   #3
Sciencerules
 
MAS2006's Avatar
 
Join Date: Apr 2006
Location: Missouri
Posts: 61
Default

Who's responsible? Part II


Do you have a written contract and what does it spell out? If not in there falls back to you (sorry). Permit should have stated requirements by city. Any change orders signed/presented by/to you?:confused:
MAS2006 is offline   Reply With Quote
Old 05-11-2006, 06:39 PM   #4
Member
 
Join Date: Mar 2006
Posts: 2,083
Default

Who's responsible? Part II


Who tore down the wall?

Is this a foundation wall?
redline is offline   Reply With Quote
Old 05-11-2006, 08:59 PM   #5
2nd half
 
Join Date: Dec 2005
Location: ct.
Posts: 48
Default

Who's responsible? Part II


I don't understand , if I had to run a 3 or 4" line through a wall, weather concrete or whatever I'd put a hole through the wall I needed to get the pipe through. Not take the wall down.
jmic is offline   Reply With Quote
Old 05-11-2006, 10:00 PM   #6
Newbie
 
Join Date: May 2006
Posts: 8
Default

Who's responsible? Part II


the pipe runs along the side if my basement wall which is the concrete foundation of my house. The pipe runs about 30 ft from the back of the basement to the front of it where the main sewer line is.
johnny558 is offline   Reply With Quote
Old 05-11-2006, 10:03 PM   #7
Newbie
 
Join Date: May 2006
Posts: 8
Default

Who's responsible? Part II


The contractor tore the wall down.
johnny558 is offline   Reply With Quote
Old 05-11-2006, 11:40 PM   #8
Tileguy
 
Bud Cline's Avatar
 
Join Date: Mar 2006
Posts: 9,104
Default

Who's responsible? Part II


WHY?

How much of the wall was removed?

How about some more info?
Bud Cline is offline   Reply With Quote
Old 05-17-2006, 07:13 PM   #9
Doing it myself
 
Alan's Avatar
 
Join Date: Apr 2006
Location: Crescent City, CA
Posts: 3,437
Send a message via AIM to Alan Send a message via MSN to Alan
Default

Who's responsible? Part II


It kind of depends on your contract, but in reality most people would rely on their contractor to keep in line with local codes when they're doing work. If he's violated one and the city told him to stop and figure out another way, then it should be on his dime IMO.

No experience in this situation though, sorry.

Alan is offline   Reply With Quote
Reply


-->
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Inducer Part Needed: Please Help! BDPNA HVAC 55 12-08-2010 09:48 AM
My house is a project...Part II "Deck Evolution" tigerbalm2424 Project Showcase 21 07-24-2008 11:37 AM
so your a part time carpenter? bgd73 Off Topic 6 07-31-2007 09:28 AM
Furnace Problems? Part 2 MCSE HVAC 9 11-30-2006 10:25 PM
PVC drain pipe leaking at joint, 2 part epoxy last? harleysilo Plumbing 3 09-26-2006 01:29 PM


Top of Page | View New Posts


All times are GMT -4. The time now is 01:05 PM.


© 2003 - 2010 The Building Network LLC