Super annoyed - contractor mis-cut all the prepared railing pieces.


Pretty ticked.

I normally don't hire out my work because I don't trust people's work. So for the 2nd time I think in my home-ownership, I hired out some work -- install the backsplash, and install the handrail on the jacked up part of my stairway.

I had the contractor drop off the newel posts/railing/base last week so that I could sand and stain it ahead of time, as you know it's very difficult to sand/stain it with the balusters already in place. I put a lot of time (too much time really) into preparing them so that they don't look like garbage: Sand with 150, 180, 220, stain, 220, stain, 320, stain, 320, stain.

Wife called me; he incorrectly assumed the existing post on the left of my staircase was at 36", and cut the posts at 36". Then realized the existing was 37". Posts cut too short. I don't know if the rail/base is OK, it should be. Parallels and stuff. He went out to buy new material now.

Trying to keep emotions in check -- All that time I wasted the last few nights getting that stuff ready, and now it's going to have to be done in-place, and probably come out looking like crap.

I'd love for him to send out a guy to sand/stain them in place when he's done, but sanding/staining wasn't part of the job. Just the install of the material he provided. I requested the material ahead of time so I could stain it all ahead of time.

Sucks to be him too. Labor is $450 for the job. He's already eating a good bit having to buy everything over again.

We'll see what's going on when I get home.

/rant

Dave88LX is offline   Reply With Quote
Old 06-25-2013, 03:15 PM   #2
Old School
 
Willie T's Avatar
 
Join Date: Jan 2009
Location: St. Petersburg, FL Minds of moderate caliber ordinarily condemn everything which is beyond them.
Posts: 3,634
Rewards Points: 2,000
Default

Super annoyed - contractor mis-cut all the prepared railing pieces.


First time was practice. You get to do it even better next time.

__________________
"True eloquence consists in saying all that is necessary, and only that which is."
François Duc de La Rochefoucauld
Willie T
Willie T is offline   Reply With Quote
The Following User Says Thank You to Willie T For This Useful Post:
RWolff (06-25-2013)
Old 06-25-2013, 03:20 PM   #3
DIY Enthusiast
 
sublime2's Avatar
 
Join Date: Mar 2012
Location: New Jersey
Posts: 1,101
Rewards Points: 500
Default

Super annoyed - contractor mis-cut all the prepared railing pieces.


Quote:
Originally Posted by Dave88LX View Post

Sucks to be him too. Labor is $450 for the job. He's already eating a good bit having to buy everything over again.

We'll see what's going on when I get home.

/rant
You can certainly expect he will cut some corners the 2nd time around to recoup some of his costs!
Good luck.
sublime2 is offline   Reply With Quote
The Following 3 Users Say Thank You to sublime2 For This Useful Post:
747 (07-01-2013), Gymschu (06-25-2013), RWolff (06-25-2013)
Old 06-25-2013, 04:41 PM   #4
Framing Contractor
 
Join Date: Feb 2009
Location: NE Ohio
Posts: 1,095
Rewards Points: 502
Default

Super annoyed - contractor mis-cut all the prepared railing pieces.


Must be a very small rail to only cost $450 for labor.
sixeightten is offline   Reply With Quote
Old 06-25-2013, 05:02 PM   #5
Lord of Slums
 
Join Date: Feb 2013
Location: Detroit Mi
Posts: 759
Rewards Points: 538
Default

Super annoyed - contractor mis-cut all the prepared railing pieces.


any chance of a picture? If he damaged(cut short) something of yours he needs to make it right.
mj12 is offline   Reply With Quote
Old 06-25-2013, 05:11 PM   #6
Ole Wood Worker
 
BigJim's Avatar
 
Join Date: Sep 2008
Location: Lookout Valley, Chattanooga, Tennessee
Posts: 7,534
Rewards Points: 2,258
Blog Entries: 1
Default

Super annoyed - contractor mis-cut all the prepared railing pieces.


Quote:
Originally Posted by sixeightten View Post
Must be a very small rail to only cost $450 for labor.
Same thing I was thinking.
__________________
New members: Please consider adding your location to your profile.

Jim
BigJim is offline   Reply With Quote
The Following User Says Thank You to BigJim For This Useful Post:
oh'mike (06-26-2013)
Old 06-25-2013, 08:32 PM   #7
Member
 
r0ckstarr's Avatar
 
Join Date: Jan 2013
Location: SE Texas
Posts: 1,167
Rewards Points: 658
Default

Super annoyed - contractor mis-cut all the prepared railing pieces.


You did all of the prep work. Why not complete the job yourself? Not giving you crap, just curious to know why you hired it out.
r0ckstarr is offline   Reply With Quote
Old 06-25-2013, 08:42 PM   #8
General Contractor
 
CENTERLINE MV's Avatar
 
Join Date: Jun 2013
Location: Martha's Vineyard, MA
Posts: 51
Rewards Points: 75
Default

Super annoyed - contractor mis-cut all the prepared railing pieces.


Quote:
Originally Posted by sixeightten View Post
Must be a very small rail to only cost $450 for labor.
This could be a "you get what you pay for" scenario. To be blunt, this is why I warn all of my potential clients that I'm not the cheapest price, and if they want to go with the guy that's cheapest, it'll cost them more in the long run.
CENTERLINE MV is offline   Reply With Quote
The Following User Says Thank You to CENTERLINE MV For This Useful Post:
CarpenterSFO (06-29-2013)
Old 06-25-2013, 09:57 PM   #9
Member
 
Join Date: Jun 2008
Posts: 286
Rewards Points: 252
Default

Super annoyed - contractor mis-cut all the prepared railing pieces.


could the existing post have been trimmed to 36"?
jcrack_corn is offline   Reply With Quote
Old 06-26-2013, 09:59 AM   #10
Member
 
Dave88LX's Avatar
 
Join Date: Nov 2011
Location: Red Lion, PA (York)
Posts: 581
Rewards Points: 500
Default

Super annoyed - contractor mis-cut all the prepared railing pieces.


Yeah it is not a very long section of railing. Just a few feet, between the up- and down- stairs of a split foyer house.

See this thread:
Have a railing project to do; split foyer home.

The existing post could not be cut down without rebuilding the existing railing.

I thought about doing it myself, but it's such a screwed up scenario with a STUPID staircase/wall design, that I had no idea how to do it. It'd have been different if I had the knee wall like every other place out there, and did not have the triangle opening to deal with at the top of the staircase. Just a whacked out house.




Dave88LX is offline   Reply With Quote
Old 06-26-2013, 10:01 AM   #11
Member
 
Dave88LX's Avatar
 
Join Date: Nov 2011
Location: Red Lion, PA (York)
Posts: 581
Rewards Points: 500
Default

Super annoyed - contractor mis-cut all the prepared railing pieces.


So, the guy feels horrible about it. He said (and I'm paraphrasing):

"I wish I could give you some good reasons, or blame it on something, but I simply screwed up and made a stupid mistake. If it was one of my guys who made this mistake, I'd be all over them about it, it sucks that I did it."

My wife said he kept apologizing about it, and could overhear him talking to the other guy (helper) outside about this being the worst part: having to tell someone you screwed up their house.

He said he's going to go out, buy new materials, stain them himself, and come back Thursday to finish.

I was mad he screwed up all the wood, but, I'm glad he said he simply screwed up, and is going to fix it and make things right, to include sanding and staining everything. This could have gone many other ways.

Admitting that you screwed up, taking responsibility, and are willing to fix things goes a long ways with me. Everyone screws up. It's how you handle it afterwards that matters.
Dave88LX is offline   Reply With Quote
The Following 4 Users Say Thank You to Dave88LX For This Useful Post:
CENTERLINE MV (06-29-2013), djlandkpl (06-26-2013), funfool (06-28-2013), MTN REMODEL LLC (06-28-2013)
Old 06-26-2013, 01:12 PM   #12
Member
 
jproffer's Avatar
 
Join Date: Mar 2005
Location: Chester, IL
Posts: 1,300
Rewards Points: 506
Default

Super annoyed - contractor mis-cut all the prepared railing pieces.


Sounds like someone you need to remember next time you need to hire work done.

I'm the same way...if he tried the ol' "That dumba$$ employee cut that too short"...whether it really was an employee or not, I probably would mark him off the list for next time. I'm not much on belittling employees in front of customers, even if it's the truth.

But your guy sounds like a stand up guy...even going to restain them so really you're out nothing but time (which sucks, I know....but still)
jproffer is offline   Reply With Quote
The Following User Says Thank You to jproffer For This Useful Post:
RWolff (06-29-2013)
Old 06-26-2013, 03:30 PM   #13
DIY staff
 
Join Date: Sep 2009
Location: Kane county,Illinois
Posts: 21,856
Rewards Points: 2,360
Default

Super annoyed - contractor mis-cut all the prepared railing pieces.


Screw ups happen---what separates the men from the boys is how it is handled---

This guy sounds like a man---
__________________
New members: Adding your location to your profile helps in many ways.--M--
oh'mike is offline   Reply With Quote
The Following User Says Thank You to oh'mike For This Useful Post:
CENTERLINE MV (06-29-2013)
Old 06-27-2013, 08:58 PM   #14
Member
 
Dave88LX's Avatar
 
Join Date: Nov 2011
Location: Red Lion, PA (York)
Posts: 581
Rewards Points: 500
Default

Super annoyed - contractor mis-cut all the prepared railing pieces.


Project was "finished" up today. I hate to sound like a downer. I really like the guy. I like his attitude, and admire him admitting to his mistake. Of course, the stain job is nowhere close to what I had done...LOL. He asked my wife if I'd put extra coats of stain on.

More of the same "If you want something done to your standards, you need to do it yourself." High quality work simply takes time. More than one day, which is basically what I paid for (one day), and I got. $450 for a day's worth of work got a railing up in a day. Nothing more, nothing less. Did I get what I paid for? Absolutely. Do I love it? I really like his idea and I like the design, I think it was a great design because of how screwed up my house is. I don't love the execution or attention to detail. I'm a details guy. I need to realize that I'm not going to get detail to my level of expectation for $450. It's just not worth anyone else's time.

Overall I'm happy, but it's going to take me a few hours to finish up everything to get it to my standards.

So, looking at these pictures, let me know what you think. Am I being overly-anal, or am I correct in my assessment? I strive to do the highest quality work myself that I can do in my house. I'd like to know what's right/wrong, and what can be done to make anything you see better. Filler and caulk will be a start. :D


1. At first glance, cool. I finally have a railing that is plenty good enough "for a rental", and that was the objective here.



2. From the top. Not staining the flat parts of the newel post until after installation was agreed so that it would all be uniform after attaching.



3. And here we go. I understand and agree with the posts being ripped; but was it cut with a jigsaw?



4. There was no stud in the wall to attach this post to, so it was glued to the wall (and nailed to...?). The glue is only as good as the last coat of paint...I think a better way to do this would have been to use a recessed toggle bolt and then cover it with an oak plug?



5. He installed the piece on the right. I had big plans for this big exposed hardwood corner. I had even gone out and bought a biscuit jointer and notched the piece on the left so that it would sit perfect. Ah well.




6. GRK screws or a pre-drilled hole with a finish nail or something...I don't know what was used to put these in (nosing)




7. The fillet holds the balusters in place. I think a pin nail in the area where the fillet would cover them would have been the right way to go. That's what I did on the railing I built. On a related note, some wood glue and pin nails would have done a much nicer job of holding the fillets in place also.
Dave88LX is offline   Reply With Quote
Old 06-27-2013, 08:58 PM   #15
Member
 
Dave88LX's Avatar
 
Join Date: Nov 2011
Location: Red Lion, PA (York)
Posts: 581
Rewards Points: 500
Default

Super annoyed - contractor mis-cut all the prepared railing pieces.


8. This here is nobody's fault. When I did the tile, I assumed the post would be centered on the stringer. He had to offset the post in order to build it the way he built it. I'll have to Chunk out that piece of tile, bust out the saw, and put a new piece in.




9. The hell? I don't get it. Y U SO CLOSE!




10. The reason I stained all four sides of the 1x3 oak base piece. It may be the "bottom" of the railing, but from downstairs, it is the top.




11. I think he may need a new saw blade, or make slower cuts.

Dave88LX is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
How to fix broken step railing? robertr4836 Carpentry 2 04-18-2008 11:19 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.