DIY Chatroom Home Improvement Forum

DIY Chatroom Home Improvement Forum (http://www.diychatroom.com/)
-   General DIY Discussions (http://www.diychatroom.com/f2/)
-   -   Modification of cost (http://www.diychatroom.com/f2/modification-cost-43071/)

jadenc 04-23-2009 12:07 AM

Modification of cost
 
If I want to change of contract scheme from BOQ (Unit Cost) contract to Lump sum contract, how do I estimate of quantity allowance?

Ron6519 04-23-2009 02:17 PM

Quote:

Originally Posted by jadenc (Post 264322)
If I want to change of contract scheme from BOQ (Unit Cost) contract to Lump sum contract, how do I estimate of quantity allowance?

Try the,"Contractor Talk" at the top of the page.
Ron

jadenc 04-24-2009 01:37 AM

Quote:

Originally Posted by Ron6519 (Post 264591)
Try the,"Contractor Talk" at the top of the page.
Ron

Thanks, Ron.


All times are GMT -5. The time now is 03:02 AM.


Copyright 2003-2014 Escalate Media LP. All Rights Reserved