Old 07-24-2011, 05:17 PM   #1
Newbie
 
Join Date: Jul 2011
Posts: 3
Share |
Question

How much percentage should a contractor charge for an outside job?


How much percentage should a contractor charge for an outside job?

shane09 is offline   Reply With Quote
Old 07-24-2011, 05:18 PM   #2
Member
 
Join Date: Aug 2010
Posts: 1,526
Default

How much percentage should a contractor charge for an outside job?


10 to 20%.

VIPlumber is offline   Reply With Quote
Old 07-24-2011, 05:19 PM   #3
Learning by Doing
 
Leah Frances's Avatar
 
Join Date: Jan 2008
Location: Easton, Maryland
Posts: 3,156
Blog Entries: 7
Default

How much percentage should a contractor charge for an outside job?


The maximum amount they can convince someone to pay them
__________________
If I could only remember to THINK about what I was doing before I did it.
Leah Frances is offline   Reply With Quote
The Following 4 Users Say Thank You to Leah Frances For This Useful Post:
AndyGump (07-26-2011), pammasterson (11-07-2012), paul100 (07-26-2011), Willie T (07-24-2011)
Old 07-24-2011, 05:26 PM   #4
Newbie
 
Join Date: Jul 2011
Posts: 3
Default

How much percentage should a contractor charge for an outside job?


Hey thanks for the reply. But I'm talking about a job where he is not doing anything other then calling them to come. for example calling a guy to tint the windows. He's doing a lot of other work for me and I have no problem paying the percentage where it is actual work, but do i need to pay him 20% on a $5,000 job for making a phone call???

Last edited by shane09; 07-24-2011 at 05:29 PM.
shane09 is offline   Reply With Quote
Old 07-24-2011, 05:32 PM   #5
Too Short? Cut it Again!
 
Join Date: Sep 2009
Posts: 9,635
Default

How much percentage should a contractor charge for an outside job?


Quote:
Originally Posted by shane09 View Post
Hey thanks for the reply. But I'm talking about a job where he is not doing anything other then calling them to come. for example calling a guy to tint the windows. He's doing a lot of other work for me and I have no problem paying the percentage where it is actual work, but do i need to pay him 20% on a $5,000 job for making a phone call???
Would you have had the knowledge to make the call on your own? And know you were finding someone that knew what they were doing? Seems to me he earned a percentage.
user1007 is offline   Reply With Quote
Old 07-24-2011, 05:37 PM   #6
Member
 
Join Date: Aug 2010
Posts: 1,526
Default

How much percentage should a contractor charge for an outside job?


So then this guy is acting as a general contractor then? He'll be organizing the schedule of work of the sub trades, making sure they do job properly on your behalf, making sure it comes in on time and on (or under) budget, etc, etc, etc...

A good GC is worth the added cost.
VIPlumber is offline   Reply With Quote
Old 07-24-2011, 05:43 PM   #7
Tileguy
 
Bud Cline's Avatar
 
Join Date: Mar 2006
Posts: 9,652
Default

How much percentage should a contractor charge for an outside job?


And who you going to call if something fails or doesn't live up to expectations? That too is his responsibility.
Bud Cline is online now   Reply With Quote
Old 07-24-2011, 09:32 PM   #8
Member
 
jules4's Avatar
 
Join Date: Jul 2010
Location: Halifax NS, Canada
Posts: 262
Default

How much percentage should a contractor charge for an outside job?


Quote:
Originally Posted by shane09 View Post
I have no problem paying the percentage where it is actual work, but do i need to pay him 20% on a $5,000 job for making a phone call???
You're not paying 20% for "a phone call" - that may be the only actual physical labour involved in arranging and managing subs for your project (although it probably isn't), but physical labour is not the only thing people deserve to be compensated for.

People also deserve compensation for giving you access to their expertise, their experience, their buisness networks, and for bearing responsibility for things. I think there's a tendency to forget about this non-physical stuff when it comes to contractors and tradespeople.

Here's a few of the things you're paying your GC for over-and-above the phone call (some of these may not apply to your particular project):
  • You're paying for your GC's established working relationship with the sub, which will ensure that your job is done well, by someone competent.
  • You're paying for your GC's experience in organizing job sites and scheduling subs so that you don't waste time and money by having subs getting in each other's way, holding each other up, or having to tear out someone else's work to complete their own.
  • You're paying for the piece of mind of having someone you can hold accountable for problems if/when subs start playing the game of "pass the buck" with any problems that arise (fyi, framing problems are the plumber's fault, plumbing problems are the framer's fault, and plumbers and framers are to blame for electrical problems).
__________________
Email: the to-do list anyone in the world can add items too.
jules4 is offline   Reply With Quote
The Following 2 Users Say Thank You to jules4 For This Useful Post:
AndyGump (07-26-2011), pammasterson (11-07-2012)
Old 07-24-2011, 09:50 PM   #9
Old School
 
Willie T's Avatar
 
Join Date: Jan 2009
Location: St. Petersburg, FL Minds of moderate caliber ordinarily condemn everything which is beyond them.
Posts: 3,634
Default

How much percentage should a contractor charge for an outside job?


It's kind of like this



Once a large ship's engine failed. The ship's owners tried one expert after another, but none of them could figure how to fix the engine. Then they brought in an old man who had been fixing ships since he was a youngster. He carried a large bag of tools with him, and when he arrived, he immediately went to work. He inspected the engine very carefully, top to bottom.


Two of the ship's owners were there, watching this man, hoping he would know what to do. After looking things over, the old man reached into his bag and pulled out a small hammer. He gently tapped something. Instantly, the engine lurched into life. He carefully put his hammer away. The engine was fixed! A week later, the owners received a bill from the old man for one thousand rupees.

"What?!" the owners exclaimed. "He hardly did anything!"

So they wrote the old man a note saying, "Please send us an itemized bill."

The man sent a bill that read:


Tapping with a hammer ........................ Rs 10.00

Knowing where to tap .......................... Rs 990.00
__________________
"True eloquence consists in saying all that is necessary, and only that which is."
François Duc de La Rochefoucauld
Willie T
Willie T is offline   Reply With Quote
The Following User Says Thank You to Willie T For This Useful Post:
paul100 (07-26-2011)
Old 07-24-2011, 09:55 PM   #10
Learning by Doing
 
Leah Frances's Avatar
 
Join Date: Jan 2008
Location: Easton, Maryland
Posts: 3,156
Blog Entries: 7
Default

How much percentage should a contractor charge for an outside job?


Willie T - there is a law case in the us where an attorney took a 100,000 $ fee for one phone call.

Similarly to your Indian Mechanic. He wasn't getting paid for his work, but for his connections.
__________________
If I could only remember to THINK about what I was doing before I did it.
Leah Frances is offline   Reply With Quote
Old 07-24-2011, 11:36 PM   #11
Too Old
 
Join Date: Mar 2011
Location: South of North
Posts: 345
Default

How much percentage should a contractor charge for an outside job?


If you don't want to pay the 20% then just take care of it on your own and save the money. With that being said here is one for you Last year I was the GC for a remodel on a building and did the 1st phase no problem. On the second phase the owner wanted to save money so he got his own bids on some of it and told me I was to high I ended up walking away from the job and later found out nothing he got bids on was per plan. That was a year ago and he still has not gotten the job signed off by the city. In my opinion do not insult the GC, if his cut is 20% then do it he has more then just 1 phone call to make.
havalife is offline   Reply With Quote
Old 07-24-2011, 11:51 PM   #12
Member
 
Join Date: Dec 2010
Location: BC Canada
Posts: 500
Default

How much percentage should a contractor charge for an outside job?


Of course he deserves to be paid a percentage, those "phone calls" are project management. He knows who to call, when to call (schedule) he is familiar with the estimating/quoting process, he is familiar with the business and pricing... He will be able to ensure that the subs show up and complete the job properly. Liability will be covered, etc.

Some people in this world do nothing but "make phone calls" and schedule things. What you assume takes five minutes may take 2 hours of phoning different people to get quotes, playing phone tag, etc. There is a lot more behind the scenes work that you would think.

this is a common business practice and he would not be running his business properly if he did not do this.

I've seen nightmares of people trying to avoid this cost on a bigger job, and try to manage it themselves. Often they are left with a project 50-75 percent done, with issues, and they have no money left.
chrisBC is offline   Reply With Quote
Old 07-26-2011, 09:18 AM   #13
Newbie
 
Join Date: Jul 2011
Posts: 3
Default

How much percentage should a contractor charge for an outside job?


All right people I see your points, thank you for making it clear.

shane09 is offline   Reply With Quote
The Following 3 Users Say Thank You to shane09 For This Useful Post:
AndyGump (07-26-2011), Leah Frances (07-26-2011), VIPlumber (07-26-2011)
Reply

Tags
contractor


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
proper percentage of anti-freeze timothyhot Automotive Repairs 6 09-11-2009 06:09 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.