Hello,
I am A Remodeler and and do occasional odd jobs as a handyman. I would appreciate some input on 2 project people have asked me to do.

First Project:

Install Tile floor in entryway (3ft x 12ft).
Remove 3 doors and install 6-Panel Oak Doors w/moulding.
Cut a hole and install a closet in the entry hall (2ft x 2ft)
Move wall switch from wall (where closet is going) to other side of hall.
(all nails, morter etc. to be supplied by ME).


Second Project

Remodel a Bathroom (6ft x 7ft) GUT and rebuild.
Remove and Replace Subfoor.
Install a Whirlpool tub and 2 new electrical (GFCI) circuits
(note the basement is unfinished and its a 15ft straight back to the breaker panel).
Install new ceiling fan and light fixture
Install Tile all 4 walls, up to 7ft.
Remove door (checge to an entryway with moulding.
Move existing door around the corner and 2ft into the hallway. (i.e. bathroom gains a 3ft x 3ft space that was a linen closet.
move existing closet light and change to a recessed light with switch
All supplies provided by customer.


I have done all of the above for myself, but not in a Handyman capacity (oh yea I am in the Chicago land area).

Therfore I am at a loss as what to CHARGE for these projects. I have done work for these customers in the past. Just not as much as they want now. Time is not a factor as either of them are will to wait up to 6 months for the work. I want to be fair in my estimate without overcharging.

Any and all suggestions would be most appreciated.

Renovator is offline   Reply With Quote
Old 05-30-2006, 12:33 PM   #2
Master Craftsman
 
Big Dave's Avatar
 
Join Date: May 2006
Location: Southwest Mo.
Posts: 289
Rewards Points: 0
Default

Help On Pricing Work


Figure how long it will take you and then charge what you think you are worth at an hourly rate. Always add extra time for unforseen occurances.

Dave.

__________________
Do one thing at a time, do it well, then move on.
www.bigdaveswoodworks.com
Big Dave is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Am I being overcharged for general construction work? baloney12 Building & Construction 2 07-11-2007 06:09 PM
Modifying existing duct work Thurgee HVAC 3 04-05-2007 09:35 AM
outdoor outlets don't work. dbrew Electrical 2 12-03-2006 09:50 PM
is this bad tiling work? garrick Flooring 17 09-27-2006 12:30 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.