Contractor question - did I just do something stupid???


I had a contractor come out to my house to take some measurements to do some work. He gave me an itemized list of the material and steps to complete the job. The list was printed on a sheet that included his company name, address, phone number, etc. At the bottom of the list was a quote for the initial fee to purchase materials, and then a second fee for the labor.

I gave the guy a check for the initial fee this morning, and then I had to quickly take off. I just now realized I didn't sign anything, nor did I get anything signed by him, and now I feel incredibly stupid. Is there a chance I just gave that guy a check that he can cash and walk away?? Or is that itemized list he gave me the same as a signed contract?? Please tell me that in my rush to leave I didn't just do something incredibly stupid...

Advertisement

spaceman spif is offline   Reply With Quote
Old 04-20-2013, 10:23 AM   #2
Member
 
Join Date: Jul 2009
Location: SW Ohio
Posts: 407
Rewards Points: 258
Default

Contractor question - did I just do something stupid???


Wanted to add, this guy came highly recommended from a larger, local contractor. And I made the check out to his company name, not to him personally. Plus in the note section of the check, I specified the work it was for. Is that enough to cover me?

Man...I feel really stupid right now...

Advertisement

spaceman spif is offline   Reply With Quote
Old 04-20-2013, 10:25 AM   #3
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 27,758
Rewards Points: 632
Default

Contractor question - did I just do something stupid???


Time will tell, in court that may fall under "meeting of the minds" contract.
__________________
When posting in forums, letting us know your location will help others give better feedback/advice/solutions to your questions
joecaption is offline   Reply With Quote
Old 04-20-2013, 10:29 AM   #4
MarginallyQualified
 
Join Date: Dec 2011
Location: Winston-Salem NC
Posts: 3,803
Rewards Points: 2,280
Default

Contractor question - did I just do something stupid???


Quote:
Originally Posted by spaceman spif View Post
He gave me an itemized list of the material and steps to complete the job. The list was printed on a sheet that included his company name, address, phone number, etc.

I gave the guy a check...
Did that sheet etc include any state license information?

Quote:
Is that itemized list he gave me the same as a signed contract??
Pretty much. The bigger issue is what OTHER detail (like completion time, inspection contingency, change order protocol, etc) is or isn't stated.

Last edited by TarheelTerp; 04-20-2013 at 10:31 AM.
TarheelTerp is offline   Reply With Quote
Old 04-20-2013, 10:29 AM   #5
Member
 
Join Date: Jul 2009
Location: SW Ohio
Posts: 407
Rewards Points: 258
Default

Contractor question - did I just do something stupid???


Quote:
Originally Posted by TarheelTerp View Post
Did that sheet etc include any state license information?
Don't have it with me right now, so I'll have to check when I get home.
spaceman spif is offline   Reply With Quote
Old 04-20-2013, 10:35 AM   #6
Member
 
Join Date: Jan 2012
Location: Pacific North west
Posts: 1,311
Rewards Points: 626
Default

Contractor question - did I just do something stupid???


OK here are a few thing, first yes you might have just given him a check and that is the last time you see him. or he might buy the stuff and you see him again. Now for every one out there, Here are ways to protect yourself from shady contractors.1.Never write out a check for anything till is on your property, example of that is this most contractors have accounts with lumber yards they order the stuff it comes to your home you then pay the contractor for the stuff. Never pay for work till it is done. If they balk at this think for a moment when was the last time you got paid for work you did not yet do?
2 look them up this is what I do when I hire out subs. I check them out. I find out if they are current on their workmans comp insurance. If they have a bond all that. Most states have a web site were you can go to find all that out. Now here is the reason why I do that. In the state I live in you hire an person to do work for you and they are not insured bonded they have a accident your on the hook for their problems. Not bonded they leave the job half done and you have to hire some one else. you can go after their bond. if not your out of luck. They are not paying their worker comp. guess what? you became their employer you are now having to pay their workman's comp.
So you brought up a valid question. If you feel like you might never see him again I feel for you. I hope it all works out for you.
Nailbags is offline   Reply With Quote
Old 04-20-2013, 10:44 AM   #7
Member
 
Join Date: Jul 2009
Location: SW Ohio
Posts: 407
Rewards Points: 258
Default

Contractor question - did I just do something stupid???


This guy is installing an egress window for me. I got his number by calling the local concrete sawing company, and they gave me his name and number. They highly recommended him and said they work with him for egress windows (he plans out how it will be done, and they come out to do the actual cutting). This concrete sawing company has been around for a long time and is in good standing with BBB.

The guy told me that the up front money is needed because the window well is custom made depending on what size I select (what we were measuring this morning) and he has to order it. So I can understand him not wanting to order a window well and I turn around later and say "Forget it" and he eats the cost. Plus when I called a couple other egress window contractors they all told me the same thing - I would have to pay up front for the well.

We'll see how this goes. I honestly don't think I got scammed, but in my rush to get the project going and then head in to work I didn't think to get signatures. Truly a "Doh!" moment.
spaceman spif is offline   Reply With Quote
Old 04-20-2013, 10:48 AM   #8
Member
 
jproffer's Avatar
 
Join Date: Mar 2005
Location: Chester, IL
Posts: 1,321
Rewards Points: 548
Default

Contractor question - did I just do something stupid???


Quote:
Originally Posted by Nailbags View Post
1.Never write out a check for anything till is on your property, example of that is this most contractors have accounts with lumber yards they order the stuff it comes to your home you then pay the contractor for the stuff. Never pay for work till it is done.


1. So I'm going to spend MY money on YOUR materials. I realize they are in my possession at the moment, but I don't really have any use for them.

2. Same thing...I'm going to send my guys to your house to start working (and racking up hours that I have to pay them for), before I have a dime fom you?? I'm thinking not.

So here's how to handle contractors......don't hire them...do it yourself. Unless of course you can't do it yourself, then I guess you'll have to do what is standard...pay a deposit before anything is bought/done.
jproffer is offline   Reply With Quote
Old 04-20-2013, 10:49 AM   #9
Member
 
Join Date: Jul 2009
Location: SW Ohio
Posts: 407
Rewards Points: 258
Default

Contractor question - did I just do something stupid???


So here's a question for you contractors out there - is it standard practice to ask the customer to pay up front for custom made parts that you need to order?
spaceman spif is offline   Reply With Quote
Old 04-20-2013, 11:02 AM   #10
Member
 
jproffer's Avatar
 
Join Date: Mar 2005
Location: Chester, IL
Posts: 1,321
Rewards Points: 548
Default

Contractor question - did I just do something stupid???


Absolutely.

I get a deposit for all materials, but ESPECIALLY custom parts/materials.

EDIT TO ADD: Custom materials normally can't be returned, so if you (the customer) don't pay for it, it sits in my shop/warehouse/garage/basement for years until I have a need for that exact part....or maybe forever, until it degrades into an unsellable product and I throw it in the dumpster.
jproffer is offline   Reply With Quote
The Following 3 Users Say Thank You to jproffer For This Useful Post:
firehawkmph (04-20-2013), kwikfishron (04-20-2013), oh'mike (04-21-2013)
Old 04-20-2013, 11:03 AM   #11
Household Handyman
 
Join Date: Feb 2009
Location: Albany, Ga.
Posts: 2,299
Rewards Points: 1,050
Default

Contractor question - did I just do something stupid???


I'm not a General Contractor, nor do I sub myself out. I have a "HandyMan" type business, duly licensed/insured/reputable in my area. I never, ever ask a customer for money up front. I do have a bid spec sheet I use which describes to the customer the pricing for materials ( after I go do the material pricing, the amount of labor I will charge, any pertinent details such as clean-up, etc. Once I set the pricing for a job--that's it. IF it is a custom made item, I do ask them to pay for this up front but give them the proper paperwork from the supplier showing exactly what is ordered and the pricing. I do not go back to the customer later and ask them for more money because I found something I missed initially-that would be my fault for missing it. Maybe some don't like my method but it has worked for me to get repeat customers and referrals. A few years ago I had to finish a project started by someone else who claimed to be licensed/insured but was not. They did the foundation for a nice deck, bought a lot of materials from the local supplier then disppeared. The homeowner made the mistake of opening an account at a big box store and had the contractors name on the account with unlimited charging for materials. Big mistake after the contractor bought some $70,000 worth of materials with very little of this being related to building a deck. His business card was a fake, his address was not his, they never found him. The homeowner had to pay the entire bill.
Thurman is offline   Reply With Quote
Old 04-20-2013, 11:05 AM   #12
JOATMON
 
ddawg16's Avatar
 
Join Date: Aug 2011
Location: S. California
Posts: 7,651
Rewards Points: 2,616
Default

Contractor question - did I just do something stupid???


If he went through the effort to give you an itemized list like that...I would say he is ok....not worth going to jail and/or getting a bad reputation over one little check. The fact that he came to you by referral means he has been around for awhile and realizes that there is more to be made being honest than taking advantage of you.

There is one guy I use that I trust completely. One time we left the keys in the door...when I got home a few hours later, he handed me the keys.....I know for a fact he would not enter our house without being asked to. I totally trust him....in fact, we will invite him and his wife when we have the house warming party.
__________________
Even if you are on the right track, you will still get run over if you just sit there.

My 2-Story Addition Build in Progress Link ... My Garage Build Link and My Jeep Build Link
ddawg16 is online now   Reply With Quote
The Following User Says Thank You to ddawg16 For This Useful Post:
oh'mike (04-21-2013)
Old 04-20-2013, 11:08 AM   #13
Member
 
jproffer's Avatar
 
Join Date: Mar 2005
Location: Chester, IL
Posts: 1,321
Rewards Points: 548
Default

Contractor question - did I just do something stupid???


Quote:
I do not go back to the customer later and ask them for more money because I found something I missed initially-that would be my fault for missing it.
I can somewhat agree with that....and somewhat not.

It depends on what it is. If I'm opening up a wall, and it turns out the framing is rotten and needs replaced....I'm not going to just eat that cost.

If it's something obvious, then sure...I should have seen it (as the professional) and it's my cross to bear, so to speak.
jproffer is offline   Reply With Quote
The Following 2 Users Say Thank You to jproffer For This Useful Post:
mae-ling (04-20-2013), ToolSeeker (04-20-2013)
Old 04-20-2013, 11:29 AM   #14
custom user
 
Join Date: Sep 2012
Location: Pacific NW
Posts: 239
Rewards Points: 150
Default

Contractor question - did I just do something stupid???


In Washington State that's what the bond is for. If he's licensed he must be bonded and insured. All you'd have to do is go to Labor & Industries. If he isn't licensed then you'd also want to go to L&I but you should always get at least a receipt.
JasperST is offline   Reply With Quote
Old 04-20-2013, 12:36 PM   #15
Too Short? Cut it Again!
 
Join Date: Sep 2009
Posts: 9,634
Rewards Points: 2,000
Default

Contractor question - did I just do something stupid???


Some reason you cannot pick up the phone and call the contractor suggesting you get together again to sign the contract? Or accomplish executing it next time he is on the jobsite.

You have a valid verbal contract with consideration already exchanged. Here, anything over $1K is supposed to be in writing but it sounds like you both just forgot to execute an agreement neither of you had issue with in the first place.

I would not loose sleep over this.

As for paying for materials upfront. I think this is fairly standard. I did not want to play banker for my clients and they paid for materials upfront. Progress payments were stated in contracts and expected in a timely manner too. In return, they were entitled to progess stated and detailed receipts.

Some states got so tired of contractor and client disputes clogging civil courts they now have mandatory pre-lien laws for renovation and such work. Not of much worth in homestead states until the property tries to sell if people are nasty of course. But, the idea of having property liened seems to have reduced people not wanting to pay for things after the fact.

Advertisement

user1007 is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Stanley Powershot design is kind of stupid....dangerous actually. J187 Tools 27 06-25-2012 11:18 PM
Stupid question about air in mortar. sukhenkoi Kitchen & Bath Remodeling 1 06-08-2011 12:06 AM
Are people really this stupid?? Scuba_Dave Off Topic 7 05-21-2009 01:07 PM
Stupid Working in Attic Question ande3171 General DIY Discussions 12 04-17-2009 01:07 AM
Embarrassingly stupid question about latex paint joeyboy Painting 7 08-20-2007 10:25 PM




Top of Page | View New Posts