Vinyl Siding Question


I hired a fellow to replace some vinyl siding that showed premature weathering (discoloration). on a two story house The company replaced the siding (10 square) and allowed $100/sq labor for replacement. The contractor agreed the $100/sq. would be acceptable. I disposed of the old siding.

After removing the old siding, I noticed that the J channel was OK but 6 inside and 6 outside corners looked bad and needed also to be replaced. Being that all the siding was off, no additional effort was required other than removing and replacing the dozen corners.I purchased the corners myself.

What the contractor added to the bill was excessive I thought but I want to be fair. What would be a reasonable amount of labor/hrs to add to the bill to replace these dozen corners


Last edited by trader66; 06-13-2006 at 08:47 PM.
trader66 is offline   Reply With Quote
Old 06-13-2006, 08:50 PM   #2
Newbie
 
Join Date: May 2006
Posts: 5
Rewards Points: 10
Default

Vinyl Siding Question


did you purchased all pieces cut to proper length ? and did they level them self? IMO that is additional effort.

fettycan is offline   Reply With Quote
Old 06-13-2006, 08:59 PM   #3
Newbie
 
Join Date: Jun 2006
Posts: 9
Rewards Points: 10
Default

Vinyl Siding Question


Good point. I would make an educated guess that 4, maybe 5 of the corners needed to be cut to length.
trader66 is offline   Reply With Quote
Old 06-13-2006, 10:39 PM   #4
General Contractor
 
joasis's Avatar
 
Join Date: May 2006
Posts: 876
Rewards Points: 500
Default

Vinyl Siding Question


I don't know how this guy bases his rates, but we charge by the square and this includes all trim. I suppose if he had some trouble fitting the corners, maybe time by the hour would be fair.
joasis is offline   Reply With Quote
Old 06-14-2006, 06:15 AM   #5
Newbie
 
Join Date: Jun 2006
Posts: 9
Rewards Points: 10
Default

Vinyl Siding Question


No trouble with the corners, pretty straightforward as I watched him do them. I am trying to determine what would be a reasonable number of man hrs for 6 lenghth of inside and 6 length of outside corner peices.
trader66 is offline   Reply With Quote
Old 06-14-2006, 06:50 AM   #6
General Contractor
 
joasis's Avatar
 
Join Date: May 2006
Posts: 876
Rewards Points: 500
Default

Vinyl Siding Question


You could call a few installers for a general price per square, including trim, and then ask your installer if these guys are right, or is he? It really sounds like he was pumping the job for more bucks. You never said total time on the job?
joasis is offline   Reply With Quote
Old 06-14-2006, 07:11 AM   #7
Newbie
 
Join Date: Jun 2006
Posts: 9
Rewards Points: 10
Default

Vinyl Siding Question


"It really sounds like he was pumping the job for more bucks"

That's kindof the impression I was getting. If it were you ,how many man hrs would you have charged for this scenario?
trader66 is offline   Reply With Quote
Old 06-14-2006, 07:15 AM   #8
Member
 
Join Date: Mar 2006
Posts: 2,083
Rewards Points: 1,000
Default

Vinyl Siding Question


Quote:
Originally Posted by trader66
No trouble with the corners, pretty straightforward as I watched him do them. I am trying to determine what would be a reasonable number of man hrs for 6 lenghth of inside and 6 length of outside corner peices.
You say that you watched him do the corners - How long did it take him to do the corners?
redline is offline   Reply With Quote
Old 06-14-2006, 07:37 AM   #9
Newbie
 
Join Date: Jun 2006
Posts: 9
Rewards Points: 10
Default

Vinyl Siding Question


To be honest I wasn't paying that close of attention to the time involved per corner. I probably should have.
trader66 is offline   Reply With Quote
Old 06-14-2006, 10:02 AM   #10
Member
 
Join Date: Mar 2006
Posts: 2,083
Rewards Points: 1,000
Default

Vinyl Siding Question


Were all the corners going up two stories or just one story?
redline is offline   Reply With Quote
Old 06-14-2006, 10:13 AM   #11
Newbie
 
Join Date: Jun 2006
Posts: 9
Rewards Points: 10
Default

Vinyl Siding Question


(5) went on the second story.
trader66 is offline   Reply With Quote
Old 06-14-2006, 01:38 PM   #12
Newbie
 
Join Date: Jun 2006
Posts: 9
Rewards Points: 10
Default

Vinyl Siding Question


Well, I just cut him a check for 10/man hrs worth of labor for installing the 7 outsides and 5 inside corners. That stikes me as more than fair........ comments
trader66 is offline   Reply With Quote
Old 06-14-2006, 05:59 PM   #13
General Contractor
 
joasis's Avatar
 
Join Date: May 2006
Posts: 876
Rewards Points: 500
Default

Vinyl Siding Question


So you basically are saying it took him 2 days, 1 day for siding, 1 day from the corners? Of course, I can't see your job, but a comparable job here would have been 1 day for 10 sq + trim...$1000 would have been more then fair, IMO.
joasis is offline   Reply With Quote
Old 06-14-2006, 07:35 PM   #14
Newbie
 
Join Date: Jun 2006
Posts: 9
Rewards Points: 10
Default

Vinyl Siding Question


Actually it took him 2.5 days, he wasn't trying to bust any speed records though.
trader66 is offline   Reply With Quote
Old 06-14-2006, 07:36 PM   #15
Newbie
 
Join Date: Jun 2006
Posts: 9
Rewards Points: 10
Default

Vinyl Siding Question


Was a two story w/fireplace chase so it was a bit more complicated that a straight 1 story side.

trader66 is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
"Maintenance Free" Siding Materials (Vinyl, Steel, Fiber Cement) diggitydog Building & Construction 12 01-23-2009 04:24 PM
Vinyl siding question? kcrossley2 Building & Construction 5 12-18-2006 05:20 AM
Vinyl Siding & windows question blazermaniac General DIY Discussions 6 04-08-2006 12:47 PM
Siding: Aluminum vs. Vinyl Grumpy Remodeling 1 03-19-2005 12:55 PM
Siding: Aluminum vs. Vinyl Grumpy Remodeling 0 04-18-2004 03:35 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.