I've been seeing general contractor fees at 20%, but most of the sites seem to imply this is a commercial fee. Is the fee typically lower for a residential (basement) remodel? The remodel was a rough finish--frame, drywall (incl. ceiling), paint and subfloor only for a 23 x 23 room. Some electric and no plumbing. Do remodel contractors typically charge the top 20% (I should note this guy uses a regular crew, so there wasn't any hunting down subs. In addition, I agree to let him do it as a down time side project while his guys worked next door).
Thanks in advance...
Thanks in advance...