Top Plate Of A Frame Under/Along A Metal Basement Beam - Building & Construction - DIY Chatroom Home Improvement Forum


Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > Building & Construction

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Display Modes
Old 04-02-2011, 03:28 PM   #1
Newbie
 
Join Date: Apr 2011
Location: Shorewood, WI
Posts: 2
Rewards Points: 10
Default

Top Plate of a Frame Under/Along a Metal Basement Beam


Hello everyone. First post from me. A big thanks to all the great information I've gleaned from all of you so far.

I've insulated my basement (rigid foam glued to walls) and am about to start framing. I'm adding two interior walls, one of which runs along a metal support beam for about 6 feet. I need to run along that line because there are obstacles on either side that make attaching the top plate difficult (see picture). I know there are options to construct around obstacles but I'm hoping there is a good way to attach the top plate along that metal beam and simply stick frame it from there.

The wall will be dry-walled up to the beam, but the beam itself will remain exposed and painted.

Any ideas?
Attached Thumbnails
Top Plate of a Frame Under/Along a Metal Basement Beam-beam.jpg  

Advertisement


Last edited by milwaukeemike; 04-02-2011 at 04:00 PM. Reason: more acurrate title
milwaukeemike is offline   Reply With Quote
Old 04-02-2011, 04:05 PM   #2
Retired from the grind
 
gregzoll's Avatar
 
Join Date: Dec 2006
Location: Midwest - Central Illinois
Posts: 14,394
Rewards Points: 2,450
Default

Top Plate of a Frame Under/Along a Metal Basement Beam


Carpenter's nail would work. Personally, I would place framing supports down from the joists, then attach the framing for the wall to that.

Advertisement

gregzoll is online now   Reply With Quote
Old 04-02-2011, 04:15 PM   #3
Old School
 
Willie T's Avatar
 
Join Date: Jan 2009
Location: St. Petersburg, FL Minds of moderate caliber ordinarily condemn everything which is beyond them.
Posts: 3,634
Rewards Points: 2,000
Default

Top Plate of a Frame Under/Along a Metal Basement Beam


Most of the time in those installations the top plate is simply "shot" into the metal beam with a high power cartridge nailer. A little intimidating if you've never dealt with those guns, so I don't recommend it for DIY.

There are so many great adhesives on the market today that it makes better sense to make your wall height pretty tight fitting, and just use a good adhesive to glue the wall into place.
__________________
"True eloquence consists in saying all that is necessary, and only that which is."
François Duc de La Rochefoucauld
Willie T
Willie T is offline   Reply With Quote
Old 04-02-2011, 08:43 PM   #4
Member
 
Join Date: Jul 2008
Location: Canada (s/w ON.)
Posts: 2,294
Rewards Points: 1,000
Default

Top Plate of a Frame Under/Along a Metal Basement Beam


My suggestion would be to drill holes in the web of the beam on 24" centers and bolt the top plate to the bottom with carriage bolts.
Wildie is offline   Reply With Quote
Old 04-02-2011, 10:33 PM   #5
Member
 
concretemasonry's Avatar
 
Join Date: Oct 2006
Location: Minneapolis/St. Paul, Minnesota - Latitude 45.057 Longitude -93.074
Posts: 3,823
Rewards Points: 2,134
Default

Top Plate of a Frame Under/Along a Metal Basement Beam


Wilde -

Do you mean the beam flange or the beam web?

Dick
concretemasonry is offline   Reply With Quote
Old 04-02-2011, 11:53 PM   #6
Member
 
Join Date: Jul 2008
Location: Canada (s/w ON.)
Posts: 2,294
Rewards Points: 1,000
Default

Top Plate of a Frame Under/Along a Metal Basement Beam


Quote:
Originally Posted by concretemasonry View Post
Wilde -

Do you mean the beam flange or the beam web?

Dick
The flange! Its my take that he wants to fasten the top plate of the wall to the underside of the beam.
Wildie is offline   Reply With Quote
Old 04-03-2011, 10:04 AM   #7
Newbie
 
Join Date: Apr 2011
Location: Shorewood, WI
Posts: 2
Rewards Points: 10
Default

Top Plate of a Frame Under/Along a Metal Basement Beam


Thanks for the help, everyone. I had dinner last night with my friend, a construction architect, and ran this by him to get his opinion. He felt that given the short length of the wall, using a strong adhesive along the top and building it with a tight-fit would be sufficient. His suggestion for a longer wall in this situation was exactly what 'Wildie' suggested -- drill a couple holes in the beam's bottom and bolt the top plate to it.

Thanks again!

Advertisement

milwaukeemike is offline   Reply With Quote
Reply

Tags
frame , top plate


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Question about steel I BEAM in basement djohns10 Building & Construction 7 06-23-2012 04:55 PM
Basement beam concern Rife Building & Construction 1 07-11-2010 01:16 PM
Cracked Basement Beam lpcon Building & Construction 12 04-12-2007 08:47 AM
Removing cement walls in basement / replacing with I beam bbockstanz Building & Construction 9 11-19-2006 07:31 AM
Temporary support for replacement of basement beam Mikedks Remodeling 8 09-14-2006 07:36 PM




Top of Page | View New Posts