they poured the back foundation wall to the wrong height. Now.....


Im waiting to hear how they are going to fix it.

New construction foundation with a walkout (daylight) basement.

For whatever reason they made top of rear foundation wall height even with the footings, so essentially its 4" too low.

Is there a proper way to fix this? Just pouring another 4" of crete on top of whats existing seems weak to me.

any suggestions as to what I should want to hear from the foundation guy tomorrow?

CumminsTruck is offline   Reply With Quote
Old 06-25-2009, 06:41 PM   #2
Concrete & Masonry
 
Join Date: Nov 2008
Location: Wisconsin
Posts: 2,788
Rewards Points: 2,128
Default

they poured the back foundation wall to the wrong height. Now.....


Maybe they plan on laying half course solid concrete block on the wall yet? How far are the anchor bolts sticking up out of the poured wall? Whatever the solution, I highly doubt they plan on forming & pouring a 4 inch curb on the wall. More than likely, if they poured to the top of there 48 inch high forms, the footing was dug a course too low by the excavator. Whatever they do, just don't let the carpenter lay down 3 green sill plates to make up for this!

jomama45 is offline   Reply With Quote
Old 06-25-2009, 08:49 PM   #3
Member
 
Join Date: Jan 2009
Location: South of Boston, MA
Posts: 17,248
Rewards Points: 2,000
Default

they poured the back foundation wall to the wrong height. Now.....


Even with what footings? Sides, front?
Any pictures?
Scuba_Dave is offline   Reply With Quote
Old 06-26-2009, 10:29 AM   #4
Newbie
 
Join Date: Jun 2009
Location: CT
Posts: 2
Rewards Points: 10
Default

they poured the back foundation wall to the wrong height. Now.....


even with the basement footings for the front wall and the ones in the middle of the floor that the collums will sit on.


Anchor bolts are sticking up only enough for sillplate.

Im meeting him up there at 2 to discuss, illl grab some pictures.
CumminsTruck is offline   Reply With Quote
Old 06-26-2009, 06:29 PM   #5
Member
 
Join Date: Mar 2009
Posts: 780
Rewards Points: 500
Default

they poured the back foundation wall to the wrong height. Now.....


Didn't you say it's a walk out?
hayewe farm is offline   Reply With Quote
Old 06-27-2009, 04:46 PM   #6
SNC
Member
 
Join Date: Dec 2008
Location: MD
Posts: 150
Rewards Points: 75
Default

they poured the back foundation wall to the wrong height. Now.....


Quote:
Originally Posted by CumminsTruck View Post
even with the basement footings for the front wall and the ones in the middle of the floor that the collums will sit on.


Anchor bolts are sticking up only enough for sillplate.

Im meeting him up there at 2 to discuss, illl grab some pictures.
You can use the existing anchor bolts AND drill more holes for longer bolts and epoxy those new ones in and use 3 more plates.
I would not like the idea of just 4 more inches of concrete on top. Could be kind of fragile. Thats called a cold joint
SNC is offline   Reply With Quote
Old 06-28-2009, 07:39 AM   #7
Member
 
Join Date: Jun 2009
Location: atl & hilton head
Posts: 3,401
Rewards Points: 2,384
Default

they poured the back foundation wall to the wrong height. Now.....


the existing anchor bolts'll act as reinforcement,,, drilling & anchoring more bolts is an accepted method PROVIDED the holes're blown out of dust/swarf/etc w/clean DRY air,,, prior to placing the new conc ' riser ', the existing surface should be ' bushed ' to remove any conc ' sheen ' & coated w/bonding epoxy,,, this complies w/icri & aci specs/methods,,, i'd do it at my house, too !


there's a difference 'tween plans & as-built's
stadry is offline   Reply With Quote
Old 06-28-2009, 09:04 AM   #8
Concrete & Masonry
 
Join Date: Nov 2008
Location: Wisconsin
Posts: 2,788
Rewards Points: 2,128
Default

they poured the back foundation wall to the wrong height. Now.....


No offense, that just seems like a complicated way to solve the problem, especially on a NEW construction! I'm sure the contractor has an easier shortcut they were planning on taking.
jomama45 is offline   Reply With Quote
Old 06-28-2009, 09:17 AM   #9
Member
 
Join Date: Jun 2009
Location: atl & hilton head
Posts: 3,401
Rewards Points: 2,384
Default

they poured the back foundation wall to the wrong height. Now.....


none taken, jo - that's just an approv'd method & the only 1 i'd use on MY house,,, laying a 4" course of cmu's also another but i wouldn't use it,,, IF the contractor can present an approved alternative AND if the arch/eng agrees, that's fine, too.
stadry is offline   Reply With Quote
Old 06-28-2009, 11:59 AM   #10
SNC
Member
 
Join Date: Dec 2008
Location: MD
Posts: 150
Rewards Points: 75
Default

they poured the back foundation wall to the wrong height. Now.....


Quote:
Originally Posted by jomama45 View Post
No offense, that just seems like a complicated way to solve the problem, especially on a NEW construction! I'm sure the contractor has an easier shortcut they were planning on taking.
Its really quite a simple prossese
SNC is offline   Reply With Quote
Old 06-28-2009, 12:21 PM   #11
Concrete & Masonry
 
Join Date: Nov 2008
Location: Wisconsin
Posts: 2,788
Rewards Points: 2,128
Default

they poured the back foundation wall to the wrong height. Now.....


I would have no reservations about the epoxy or concrete curb added, only saying that's ALOT of work compared to doing it right the first time. Probably 1/2 a day of labor & a few hundred in extra materials. To put things in prospective, the bigger foundation contractors around here will set forms & pour an average house wall in an 8 hour day. I would just be concerned as the HO that they are planning a lot easier shortcut, like 3 extra sill plates.
jomama45 is offline   Reply With Quote
Old 06-28-2009, 12:38 PM   #12
Member
 
Join Date: Jun 2009
Location: atl & hilton head
Posts: 3,401
Rewards Points: 2,384
Default

they poured the back foundation wall to the wrong height. Now.....


we don't have any disagreement on that
stadry is offline   Reply With Quote
Old 06-28-2009, 10:30 PM   #13
Member
 
Join Date: Jan 2009
Posts: 68
Rewards Points: 75
Default

they poured the back foundation wall to the wrong height. Now.....


Yup, they screwed up. But how would tripling up the sill plate with treated lumber be against codes? Bearing walls are always poured up against with your basement slab so why would a walkout wall be any different? You wouldn't want to fill right up against the plates on the outside if thats an issue.

We always used to pour the top of our frost walls level with our rear footings until we saw someone leaving theirs 4" higher and thought that that was a great idea. Maybe this is what they always do.....probably not though.
the carpenter is offline   Reply With Quote
Old 06-28-2009, 11:25 PM   #14
Concrete & Masonry
 
Join Date: Nov 2008
Location: Wisconsin
Posts: 2,788
Rewards Points: 2,128
Default

they poured the back foundation wall to the wrong height. Now.....


Quote:
Originally Posted by the carpenter View Post
Yup, they screwed up. But how would tripling up the sill plate with treated lumber be against codes? Bearing walls are always poured up against with your basement slab so why would a walkout wall be any different? You wouldn't want to fill right up against the plates on the outside if thats an issue.

A good mason would be putting 1/2 course block down for you first, so you didn't have treated wood where it would eventually fail. Anyways, what if there happens to be a patio door in the walkout (like merely every walkout has), do you hold the patio down 4" or 5" too?

We always used to pour the top of our frost walls level with our rear footings until we saw someone leaving theirs 4" higher and thought that that was a great idea. Maybe this is what they always do.....probably not though.
It's definatly better to keep the wood up the 4" minimum.
jomama45 is offline   Reply With Quote
Old 06-30-2009, 12:24 AM   #15
Member
 
Join Date: Jan 2009
Posts: 68
Rewards Points: 75
Default

they poured the back foundation wall to the wrong height. Now.....


Agreed, it's better.
Regarding the patio door, we always just used to stop the framing at the doors and pour the slab right out under the doors, then install the doors on top of the slab.

Can't wait to see what the contractor said CumminsTruck

the carpenter is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
subpanel mounting on concrete basement foundation wall bulk88 Electrical 12 03-10-2009 02:38 PM
Breaking up a long/continuous wall tigereye Interior Decorating 4 03-08-2009 04:43 PM
Atlantic-need your opinion on markd's comments about my vapor barrier? yummy mummy Building & Construction 11 03-07-2007 10:47 AM
Load Bearing Wall? Traybae Remodeling 3 11-05-2006 02:39 PM
Load Bearing Wall? Traybae Building & Construction 1 11-05-2006 02:01 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.