So I'm going through my basement finishing project.
A little background information: the house is about 20 months old, I've lived in it for 10 months. The joists are 2 x 10s, 16 o.c. and span 15 feet. I believe the lumber is pine but can't say for sure. I've done all the framing, plumbing and electrical rough in as well as insulation. Prior to my finishing the basement at least one small hole, like a half inch hole, was drilled in many of the joists for electrical wiring by an electrician I had hired to get me some light in the basement before I moved into the house. A few, like 3 or so, have 2 holes in them. The holes are generally about 1-2 inches above the bottom of the joists. I know the drilling should have been done at least 2 inches above the bottom of the joists but I can't change that now. SO, I've been reading on joist strengthening. My floors are fine, no sagging, no bouncy floors, etc. I just don't want to cover that ceiling only to see some bouncy floors in 5,10 years or so. My main concerns are (1) the span of the joists is long, probably just within engineering specs for the minimum floor load required by code (2) the holes drilled in the joists have been somewhat concerned. I was looking at using joist bridging with wood or blocking to tie the joists together so they can share their loads and reduce deflection. I just thought I'd get some opinions, am I worrying too much or not? Thanks. |
|
|
|
|
|
#2 |
|
It was a dark and stormy
Join Date: Jul 2008
Location: NW of D.C.
Posts: 5,954
|
Strengthening Joists Before Basement Finish
You could measure the deflection [sag] in fractions of an inch at midspan before and after putting a concentrated known load [two or three people] at midspan.
From this the E value of your existing joists can be estimated and the whole thing reverse engineered, within some error. Blocking prevents the joists from twisting and so you get the calc. value of stiffness. If a joist twists the formulas do not apply. |
|
|
|
|
|
#3 |
|
Member
Join Date: Jul 2008
Location: Canada (s/w ON.)
Posts: 2,294
|
Strengthening Joists Before Basement Finish
Millions and millions of homes have been built in N.America and have had holes drilled for electrical cables.
I doubt that there ever was one that had a floor collapse that was attributed to a hole being drilled in them. If you wish to have a worry, think about the oil spill in the Caribbean. Now, there's a problem! |
|
|
|
|
|
#4 |
|
Member
Join Date: Mar 2007
Location: Long Island, NY
Posts: 9,519
|
Strengthening Joists Before Basement Finish
There's really nothing you need to do.
Ron |
|
|
|
|
|
#5 |
|
Moderator
Join Date: Mar 2009
Posts: 8,851
|
Strengthening Joists Before Basement Finish
If lower than 2", I would be a little concerned. Perhaps our resident engineer would comment on your using a truss mend plate or strapping on that joist as brought out for top plates here: http://www.ladbs.org/faq/info%20bull...20notching.pdf
Blocking or bridging would help distribute any load: http://books.google.com/books?id=DWs...olumns&f=false Be safe, Gary
__________________
Clothes taking longer to dry?
Clean the dryer screen in HOT water if using fabric softener sheets. They leave a residue that impedes air-flow, costing you money. Clean the ducting in the last six months? 17,000 dryer fires annually! |
|
|
|
|
|
#6 | |
|
Member
Join Date: Jul 2008
Location: Canada (s/w ON.)
Posts: 2,294
|
Strengthening Joists Before Basement FinishQuote:
If closer, protection against nail penetration, in the form of a metal plate must be used. Its likely that a similar rule exists in most jurisdictions. |
|
|
|
|
|
|
#7 |
|
Moderator
Join Date: Mar 2009
Posts: 8,851
|
Strengthening Joists Before Basement Finish
Yes, that rule is in effect here, also. I was referring to the strapping as a possible fix for the joist with a hole in the bottom 2" (tension force)- which could lose it's 2x10 rating and be way over-spanned for it's new 2x8 rating. Especially if in the middle 1/3 of span. The fix was shown on a plate, not a joist.
Be safe, Gary
__________________
Clothes taking longer to dry?
Clean the dryer screen in HOT water if using fabric softener sheets. They leave a residue that impedes air-flow, costing you money. Clean the ducting in the last six months? 17,000 dryer fires annually! |
|
|
|
|
|
#8 | ||
|
Member
Join Date: Feb 2010
Location: Kansas City, MO
Posts: 42
|
Strengthening Joists Before Basement FinishQuote:
Quote:
|
||
|
|
|
|
|
#9 |
|
Civil Engineer
Join Date: Mar 2009
Location: Boston
Posts: 3,585
|
Strengthening Joists Before Basement Finish
In theory, they drilled the holes in the wrong place, and in fact they violated code. That said, I would leave it be if it only affects a few joists. Blocking will not stiffen individuals joists, as noted it simply reduces twisting and effectively eliminates the potential for lateral buckling, which never happens in residential applications anyway.
If the floors feel OK, have another martini and don't get too concerned. There should be blocking or X bracing between the joists, if you are saying there is none now, well then I would add it, but if you are saying you want to add more, I would not bother. I can't tell you how many houses I have looked at with electrical and plumbing holes in the wrong place, as previously noted, none of them have fallen down. |
|
|
|
|
|
#10 |
|
Member
Join Date: Feb 2010
Location: Kansas City, MO
Posts: 42
|
Strengthening Joists Before Basement Finish
I know nothing will fall down, I'm just concerned with bouncy spots on the floor in the future as it has been used and abused. There's no bracing or blocking there right now at all. As I recall it is only required when the depth of the joists exceed 12". None of the houses built here by this builder has bracing or blocking in the engineering plans (I have the full blueprint for my house).
|
|
|
|
|
|
#11 | |
|
Member
Join Date: Jul 2008
Location: Canada (s/w ON.)
Posts: 2,294
|
Strengthening Joists Before Basement FinishQuote:
Even if the electrician drilled in the wrong place, bracing would help to negate this damage by transferring the load over the weakened joist to the adjacent ones. |
|
|
|
|
|
|
#12 |
|
Member
Join Date: Feb 2010
Location: Kansas City, MO
Posts: 42
|
Strengthening Joists Before Basement Finish
Yeah nothing structurally is above code. In fact, that 15 foot span seems to be just right for 40psf live load and 10psf dead load. Not even 1% above code.
|
|
|
|
|
|
#13 | |
|
Member
Join Date: Dec 2009
Location: Canadian Rockies
Posts: 1,280
|
Strengthening Joists Before Basement Finish
Pretty sure that blocking/bracing would be required to meet code here on a 15 foot span.
At least 1 set, possibly 2 lines of blocking.
__________________
Quote:
|
|
|
|
|
|
|
#14 | |
|
It was a dark and stormy
Join Date: Jul 2008
Location: NW of D.C.
Posts: 5,954
|
Strengthening Joists Before Basement FinishQuote:
The next time you hold a party see if any joists twist at midspan, using a level vertically or a plumb line. Last edited by Yoyizit; 06-13-2010 at 12:36 PM. |
|
|
|
|
|
|
#15 |
|
Moderator
Join Date: Mar 2009
Posts: 8,851
|
Strengthening Joists Before Basement Finish
The bottom of page #718 and top of 719: http://books.google.com/books?id=DWs...olumns&f=false
Be safe, Gary
__________________
Clothes taking longer to dry?
Clean the dryer screen in HOT water if using fabric softener sheets. They leave a residue that impedes air-flow, costing you money. Clean the ducting in the last six months? 17,000 dryer fires annually! |
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Spray foam insulating joists in basement? | peethree | Building & Construction | 13 | 11-28-2010 09:54 AM |
| Thoughts and ideas basement finishing and HVAC | creamaster | HVAC | 1 | 03-10-2010 08:46 PM |
| Basement Finish HVAC questions | JETJR | HVAC | 3 | 06-15-2009 03:06 PM |
| Ceiling joists spans drywall in a basement? | Indianer | Drywall & Plaster | 14 | 06-09-2008 03:51 PM |
| Want to finish basement | mopared | Remodeling | 3 | 02-20-2005 05:49 AM |