|
|
|
|||||||
![]() |
|
|
Thread Tools | Search this Thread | Display Modes |
|
|
#1 |
|
Member
Join Date: Aug 2009
Posts: 35
|
Sealing around concrete form openings
I'm about to pour some concrete for a small wall footing. I have run some piping (landscape irrigation PVC piping as well as electrical conduit - gray PVC) through openings in the form and these will be embedded inside the footing. I'm wondering how best to seal around the gaps between the hole for the piping in the forms and the pipe itself to prevent wet concrete from seeping out during the pour. Would some outdoor silicone be sufficient or should I be looking at something stronger.
|
|
|
|
|
|
#2 |
|
Master General ReEngineer
Join Date: Dec 2007
Location: Chaumont River, Ny.
Posts: 3,175
|
Sealing around concrete form openings
Ayuh,... Don't bother... It won't seep much anyways, the aggregate will plug it up...
|
|
|
|
|
|
#3 |
|
Moderator
Join Date: Mar 2009
Posts: 8,843
|
Sealing around concrete form openings
If its a big hole, some tin screwed to the inside form would work, or 1/4" ply. Usually, you set a section of pipe cut to the wall or footing form thickness with nails through the outside form to hold it in place. After removing the forms, install a smaller size pipe through the concreted one.
Be safe, Gary
__________________
Clothes taking longer to dry?
Clean the dryer screen in HOT water if using fabric softener sheets. They leave a residue that impedes air-flow, costing you money. Clean the ducting in the last six months? 17,000 dryer fires annually! |
|
|
|
|
|
#4 |
|
gravity always wins
Join Date: Feb 2008
Location: Central Pennsylvania
Posts: 2,417
|
Sealing around concrete form openings
If it's for a footer, nobody will see it. If you make it too tight, you just make the forms harder to get off. Unless the holes are way over cut, it won't make a difference. The concrete won't leak out very much.
|
|
|
|
|
|
#5 |
|
Member
Join Date: Aug 2009
Posts: 35
|
Sealing around concrete form openings
Okay thanks for the replies. It is not overcut by much - about 1/4". I'm not concerned about the look since nobody will see it. I was more concerned about too much concrete seeping out and affecting the level but I guess the aggregate will plug it up anyway.
|
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| How To Keep Your Concrete Mixer Driver Happy | Mort | How To Guides | 36 | 08-05-2012 11:43 AM |
| Filling in large openings in concrete foundation | shtoink | Building & Construction | 10 | 12-04-2008 05:03 PM |
| Concrete Form for Raised Patio | PerpetuallyRepairing | Building & Construction | 6 | 04-08-2008 07:33 PM |
| Concrete Form Gap Question | bjones | Building & Construction | 1 | 03-10-2008 07:32 PM |
| Sealing Concrete | J. V. | General Discussion | 4 | 10-04-2007 04:19 PM |