rough estimate of foundation on slope


I will be building a home on a slope and am trying to find out a rough estimate of the cost of the foundation. I plan to put timber frame house on the lot but have not designed the house yet and I'll need to supply the foundation up to the first floor. I'm trying to get a handle on the cost of supplying the part up to the first floor. I know I'll also need excavation and probably a pumper due to limited access.

The lot is sloping at about 30% and has shallow soil, from solid rock at the top to about 2 feet soil at the maximum. What I'm looking for is the cost of something like this - rectangle 60 feet x 35 feet. The slope is fairly constant and I assume the highest elevation the foundation would be 2 feet above the bare rock. On the other side of the 60 foot the lot slopes down about 17 feet so the floor top would be 19 feet above this ground level.

Obviously I'm not going to do this with all concrete, but would need to step the foundation down the hill and build up to the first floor with wood. There would be a partial basement and I'd like a slab.

This is obviously not DIY.

Is this possible? Am I crazy to try this? The area would be near Asheville and would be in a more rural area in the mountains (closest concrete is 7 miles from the lot) What about Superior wall system in this situation? Other advice?

Thanks, Billv

Advertisement

billv is offline   Reply With Quote
Old 07-19-2010, 04:09 PM   #2
Member
 
Join Date: May 2010
Location: Canada, BC
Posts: 110
Rewards Points: 75
Default

rough estimate of foundation on slope


Is the 60' dimension going down the slope or is the 35' dimension going down the slope?

Also what type of 'rock' is it? Do you know if it can be easily excavated?

Finally how sure are you about the 30% slope? For most wheeled heavy equipment that is the maximum operable grade, meaning very likely that a dozer would have to create a lesser sloped grade around the property, which adds significant cost.

That being said, homes on steep slopes are done all the time. They are much less costly if a basement is incorporated but that requires your rock to be 'easily' rippable with heavy machinery.

Advertisement

Troglodyte is offline   Reply With Quote
Old 07-19-2010, 04:19 PM   #3
Newbie
 
Join Date: Jul 2010
Posts: 3
Rewards Points: 10
Default

rough estimate of foundation on slope


Quote:
Originally Posted by Troglodyte View Post
Is the 60' dimension going down the slope or is the 35' dimension going down the slope?

Also what type of 'rock' is it? Do you know if it can be easily excavated?

Finally how sure are you about the 30% slope? For most wheeled heavy equipment that is the maximum operable grade, meaning very likely that a dozer would have to create a lesser sloped grade around the property, which adds significant cost.

That being said, homes on steep slopes are done all the time. They are much less costly if a basement is incorporated but that requires your rock to be 'easily' rippable with heavy machinery.
The 60' is down slope. I did talk to an excavator at the site and he didn't seem concerned about the slope for excavation.

I'm not sure about the type of rock. May be graywacke or a metamorphic shale. There is weathered gneiss further down the hill but no here. Where the rock is exposed it's quite hard. In the pits that were dug for the septic permit, it breaks up some into thin 1/2 layers. I don't anticipate a full basement the full 60 feet but a 1/2 or 2/3 basement is desired and an obvious thing to do.

There are homes in the same subdivision that have been built on steeper lots than this. I know one can build on anything, including a sheer cliff. The question is how much is going to cost.

The reason I'm asking is that I'm trying to figure out how much money I need to set aside and if I have enough. I'd like to retire in November but if I'm short I might have to work longer and frankly I'm tired of the daily grind. Thanks
billv is offline   Reply With Quote
Old 07-19-2010, 04:43 PM   #4
Member
 
Join Date: May 2010
Location: Canada, BC
Posts: 110
Rewards Points: 75
Default

rough estimate of foundation on slope


Your rock does sound like it is rippable, so it shouldn't be terrible. If you had an excavator on site why was he not able to provide an estimate of the cost?

At any rate, I would say your not crazy. Fairly easily done, I'd suggest step slabbed sections so the first ~30' is a single floor on slab, then the last 30' is two stories on a lower slab.
Troglodyte is offline   Reply With Quote
Old 07-20-2010, 10:12 AM   #5
Newbie
 
Join Date: Jul 2010
Posts: 3
Rewards Points: 10
Default

rough estimate of foundation on slope


Quote:
Originally Posted by Troglodyte View Post
Your rock does sound like it is rippable, so it shouldn't be terrible. If you had an excavator on site why was he not able to provide an estimate of the cost?

At any rate, I would say your not crazy. Fairly easily done, I'd suggest step slabbed sections so the first ~30' is a single floor on slab, then the last 30' is two stories on a lower slab.
Actually he did - 60-70K for the rough driveway, excavation and foundation. I'm not sure if he was including the septic system installation and what kind of foundation he was thinking of or if it was just the foundation wall. As you said I'd like need a stepped foundation with framing up to the first floor as a 20 foot high concrete wall is not going to be cheap. I'm not sure if he was including that framing or not. I'm asking him now.

Another GC estimated a that the foundation up to the first floor would be no more than 100K but I'm also not sure what he was including in that either. I don't think he was including the excavation or rough driveway.

So can see I'm getting some rather wide numbers and not completely sure what I'm getting. Comparing apples to oranges.

These GC's really dont' like to give out numbers. I understand that it could be off but I'm looking for order of magnitude, not down to the penny.

Thanks,
billv is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Estimate Foundation Cost minighi Off Topic 2 04-26-2010 01:20 PM
Round House Foundation Feasibility Mswick Building & Construction 23 02-27-2010 09:34 AM
Rough cost estimate requested reznor74 Electrical 1 10-28-2009 07:37 PM
Foundation Repair Help rasilun Remodeling 1 10-15-2009 11:26 PM
Slope for Bathroom Rough in m4larson Plumbing 3 01-27-2008 10:38 AM