Quote:
Originally Posted by jogr
I suspect that above the step footings and behind the brick is a framed wall
|
Yes, that is what is suspect as well. While the basement is finished.. there is a small section unfinished (toward the front of the house) that shows framing above the poured concrete portion of the wall.
Quote:
Originally Posted by jogr
and you do not want to backfill dirt against a brick/frame wall.
|
That is what I figured. I was hoping it wouldn't be that way... but you confirmed my suspicion. Unfortunately, I am coming in after the house was completed, so it is too late to do anything about it. Would covering the brick w/ a moisture barrier (ie the black stuff) and a moisture wicking system (ie the dimpled plastic) make any difference? Or even possibly pouring a second wall right next to the brick an option. It is probably still a no-no, but I want to make sure.
Quote:
Originally Posted by jogr
Then say 4 feet away from the wall you can put your L shaped retaining wall - but I would recommend three 4 foot walls rather than one 12 foot wall for both safety and aesthetic reasons.
|
How much distance would the 4' walls be from each other (vertically & horizontally)? I'm not sure this will leave enough room for the additional/extended driveway pad... which is what I am trying to accomplish.
thanks,
Jeff