Preparing for an inspection


I am finishing my basement and called to get the framing inspected. They told me I needed to do the rough plumbing and rough electrical before they would look at it. My question is for the rough plumbing do they want me to go ahead and plumb into the existing water lines and cap everything off? Or should I just run the pipes to where they will eventually connect and tap into the existing lines after the inspection?

I would like to plumb into the lines right now so I can cap everything off and see if I have any leaks.

Also, after this inspection, what is the usual sequence for inspections after this?

Thanks.

Advertisement

epeterson777 is offline   Reply With Quote
Old 01-18-2009, 02:59 PM   #2
BUILDER / REMODELING CONT
 
buletbob's Avatar
 
Join Date: May 2008
Location: LONG ISLAND N.Y
Posts: 1,543
Rewards Points: 1,000
Default

Preparing for an inspection


In my area we have different inspections for different stages. Complete rough framing, complete plumbing roughing which includes all pipes tie into existing lines, and capped off and pressurized. complete electrical rough with all light cans wired. then a fire caulk and insulation inspection, and last a finish inspection for all. I wish we had your way here, it will move the job along much quicker. Good luck BOB.

Advertisement

buletbob is offline   Reply With Quote
Old 01-18-2009, 06:37 PM   #3
Registered User
 
Termite's Avatar
 
Join Date: Apr 2008
Posts: 6,520
Rewards Points: 2,000
Default

Preparing for an inspection


Go ahead and hook up all the supply and waste lines. You can put temporary caps on them and/or stuff a towel in the water closet drain. Don't install fixtures just yet. They'll want to see your connections if they'll be concealed, otherwise they might let you wait.

It is very common for an "all trades" rough-in inspection to be the way it is done. Many cities use "combination" inspectors like me instead of just having guys that specialize in one trade. Honestly, it saves you quite a bit of time in that you don't have to meet the inspectors over and over and over each time you finish something.

Other inspections that you may have between the rough and the final are:
-insulation
-wallboard
-gas lines
-final

Most cities don't do wallboard inspections on houses, but you definately need to ask your inspector to know for sure what they'll want to see.
Termite is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Preparing for eletrical rough inspection? gone_fishing Electrical 10 01-07-2009 12:38 PM
Ontario Inspection finishing basement dave1699 Electrical 4 12-01-2008 09:09 AM
State Vehicle Inspection - ARGGH Leah Frances Off Topic 14 04-05-2008 01:59 PM
preparing for inspection brackh Electrical 18 03-18-2008 09:45 PM
Failed framing inspection Hope I can sleep tonight!! NJlumberjack Building & Construction 14 01-16-2008 08:50 PM




Top of Page | View New Posts