Ledger overlapping foundation.


I'm attaching a 2x10 ledger for my deck. If I line up the ledger with the bottom of the sheathing the finished deck would be on the same plane as the interior floors. Is it possible that I can drop this down by 2" or so so that there is a small step out the door. This would mean that it would overlap the foundation. I like the idea of a separate level for the deck and it would make flashing a lot easier too.
TIA

Advertisement

__________________
I tear things down and build them up.
Clutchcargo is offline   Reply With Quote
Old 08-09-2010, 09:46 AM   #2
I have gas!
 
Clutchcargo's Avatar
 
Join Date: Mar 2007
Location: Massachusetts
Posts: 1,783
Rewards Points: 1,018
Default

Ledger overlapping foundation.


Maybe my articulation doesn't make sense. It's balloon type framing and I plan to add blocking between studs.
Thanks for any input.
Attached Thumbnails
Ledger overlapping foundation.-ledger-illustration.jpg  

Advertisement

__________________
I tear things down and build them up.
Clutchcargo is offline   Reply With Quote
Old 08-09-2010, 10:08 AM   #3
Member
 
concretemasonry's Avatar
 
Join Date: Oct 2006
Location: Minneapolis/St. Paul, Minnesota - Latitude 45.057 Longitude -93.074
Posts: 3,823
Rewards Points: 2,134
Default

Ledger overlapping foundation.


Why not just do it the best way and build a free-standing deck with a support beam 2' away and cantilever back to be as close to the house as you want AND at the elevation you desire. - The ultimate in flexability of use and design.

A couple of extra posts, but no worries, flashing, moisture and rot. The connection and water are always the classic problem areas that are very hard to do correctly and very, very expensive to tear out and repair, especially when it gets to affecting the interior of the house.

Dick

Last edited by concretemasonry; 08-09-2010 at 12:24 PM.
concretemasonry is online now   Reply With Quote
Old 08-09-2010, 10:17 AM   #4
Member
 
gmhammes's Avatar
 
Join Date: Jan 2010
Location: Central Illinois
Posts: 476
Rewards Points: 250
Default

Ledger overlapping foundation.


How high will the deck be off the ground?
gmhammes is offline   Reply With Quote
Old 08-09-2010, 11:14 AM   #5
I have gas!
 
Clutchcargo's Avatar
 
Join Date: Mar 2007
Location: Massachusetts
Posts: 1,783
Rewards Points: 1,018
Default

Ledger overlapping foundation.


Concrete, you've mentioned this to me before and it's starting to sink in. How close to the existing foundation can I install a footing? I've got a couple of corners to go around, which is why I was thinking it would be easiest to attach to the house.
The deck will be 3' off the ground.

Edit: Another question: with a free standing deck, is there any connection to tie the deck to the house?
__________________
I tear things down and build them up.

Last edited by Clutchcargo; 08-09-2010 at 11:46 AM.
Clutchcargo is offline   Reply With Quote
Old 08-09-2010, 11:51 AM   #6
Coconut Pete's paella!
 
CoconutPete's Avatar
 
Join Date: Jan 2010
Location: Charlotte, NC / Denmark
Posts: 1,318
Rewards Points: 500
Default

Ledger overlapping foundation.


Mine are going to be 2' from the foundation for my free-standing deck.

I'm also a fan of a step down onto the deck. Mine will be 6" (Scuba dave threw that number out there and it sounded perfect).
CoconutPete is offline   Reply With Quote
Old 08-09-2010, 12:29 PM   #7
Member
 
concretemasonry's Avatar
 
Join Date: Oct 2006
Location: Minneapolis/St. Paul, Minnesota - Latitude 45.057 Longitude -93.074
Posts: 3,823
Rewards Points: 2,134
Default

Ledger overlapping foundation.


With most joists, there is a code and practical limit of about 2', but a deeper joist may be cantilevered more, but an engineer may be required to get approval for something that is not according to prescriptive codes.

Usually, 2' is enough to avoid the buried footing and drain tile (if used).

Usually no connect to the house is necessary for 3' high deck, but some people add a couple (1 or 2) of places (to minimize the dreaded flashing and moisture) to get some horizontal bracing for large, tall deck with 20 people bouncing around on it.

Dick

Last edited by concretemasonry; 08-09-2010 at 12:31 PM.
concretemasonry is online now   Reply With Quote
Old 08-09-2010, 12:35 PM   #8
I have gas!
 
Clutchcargo's Avatar
 
Join Date: Mar 2007
Location: Massachusetts
Posts: 1,783
Rewards Points: 1,018
Default

Ledger overlapping foundation.


Sounds good, I'm sold.
It's fieldstone foundation below grade with blocks above. That will put me at most 3' off the wall to maintain 2' from the footing.
I think I'll rent a machine to do the digging, this is incredibly hard earth. I'll have to dig up the old pilings and add new so I'm in for about 16 holes (8 new/8 old) for my 14x18' deck.
__________________
I tear things down and build them up.
Clutchcargo is offline   Reply With Quote
Old 08-09-2010, 12:56 PM   #9
Coconut Pete's paella!
 
CoconutPete's Avatar
 
Join Date: Jan 2010
Location: Charlotte, NC / Denmark
Posts: 1,318
Rewards Points: 500
Default

Ledger overlapping foundation.


Yeah I'm in the same boat as you right now.... I only have 6 holes though. Trying to decide whether to rent a "big-boy digger" or go it by hand or just try to hire someone who has a mixer & an auger to just do all the concrete work....
CoconutPete is offline   Reply With Quote
Old 08-09-2010, 12:58 PM   #10
Member
 
concretemasonry's Avatar
 
Join Date: Oct 2006
Location: Minneapolis/St. Paul, Minnesota - Latitude 45.057 Longitude -93.074
Posts: 3,823
Rewards Points: 2,134
Default

Ledger overlapping foundation.


For only 16 holes, rent a good auger (2 person) and you will be able to return it quickly (and cheaper) and be able to enjoy beverage with your volunteer. Don't try to fight it with just one person, especially since you will be going down down a ways in tough soil.

Dick
concretemasonry is online now   Reply With Quote
Old 08-09-2010, 01:00 PM   #11
Registered User
 
Join Date: Mar 2009
Posts: 9,967
Rewards Points: 2,000
Default

Ledger overlapping foundation.


The main concern is getting the proper spread between bolts on the ledger. Page #13, here: http://www.lancova.com/deckinfo.pdf
Notice 6-1/2" minimum from the top of ledger to the lower bolt. In your case it would drill too close to the top edge of the concrete block. Adjust to fit lower and upper bolt placement for full support.
Many B.D.'s want any deck footing within 5 feet of the house's to be as deep.
Cantilever length's are also stated in that Prescriptive Deck Code as sited. Check with local B.D. for safety.


Be safe, Gary

Advertisement

__________________
If any ads are present in my answer above, I do not condone/support/use the product or services listed, they are there against my permission.

Last edited by Gary in WA; 08-09-2010 at 01:02 PM.
Gary in WA is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
garage loft; ledger to ledger joists? nsixbdg Building & Construction 10 12-26-2011 07:29 PM
Round House Foundation Feasibility Mswick Building & Construction 23 02-27-2010 09:34 AM
Connecting Ledger Board to Vertical Stud Alzipski Building & Construction 3 11-04-2009 03:53 PM
Foundation Repair Help rasilun Remodeling 1 10-15-2009 11:26 PM




Top of Page | View New Posts