I bought an inexpensive Stanley optical level for laying out my house on the lot. It worked pretty well for getting grade drawings and placing the structure in rough position.

The bearing markers are not exactly consistent around the dial making it hard to precisely move to specific angles. In one test, I could move away from a point and then move back to the same half-degree angle as precisely as I could interpolate between the lines and found that, at 40 feet out, I was up to 3 or 4 inches from the previous reading.

That gets me close enough for getting the bulldozer in tomorrow to level a starting point but once he's gone, I need to lay out the footings exactly. 3 inches now will be an expensive error.

I know how to do 3-4-5 or 6-8-10 angle measurements or diagonals across a square or rectangle. And if our 22.5 degree turn in the front of the house turns out to be 22 or 23, it isn't the end of the world but the 90's have to be right. And with the 3-4-5 or diagonals, there is still some error for tape stretch or sag.

I uploaded our floor plan to http://www.debndale.com/images/house/firstfloorplan.jpg

So, if I want to have really square corners, I need help on how to do it. Please share your tips for precision layout - preferably on a budget but, if necessary, I can rent or buy a better quality level or transit. Suggestions on make/model would be great, if that is the key.

Thanks,

Dale

dalepres is offline   Reply With Quote
Old 03-30-2011, 08:25 AM   #2
Civil Engineer
 
Join Date: Mar 2009
Location: Boston
Posts: 4,276
Rewards Points: 2,130
Default

Laying out building footings


You can certainly buy a better quality transit, or you can rent one from a U-rent place. An adequate transit for layout work would be accurate to within a few seconds of arc. A little perspective on accuracy. A 1 degree error is 1.7 feet per hundred, obviously unacceptable. A one minute error (1/60 of a degree) is an error of .03 feet per hundred, which may be acceptable for building layout, but is pretty poor. A 10 second error (1/360 degree) is an error of .005 feet per hundred, well within tolerance.

You can get similar results if you use a non-stretch calibrated tape using the 3-4-5 right triangle principle. You have to keep the tape level, which is a real pain over distance, hence I prefer using a 10 second or better instrument.

Daniel Holzman is offline   Reply With Quote
The Following User Says Thank You to Daniel Holzman For This Useful Post:
dalepres (03-30-2011)
Old 03-30-2011, 09:22 AM   #3
Concrete & Masonry
 
Join Date: Nov 2008
Location: Wisconsin
Posts: 2,792
Rewards Points: 2,136
Default

Laying out building footings


On extremely cut-up foundations, we'll often have a surveyor "pin" the corners for us one the footings are poured.

Your layout isn't really that complicated and can be laid out easily & accurately with a plain ole' steel tape. A nylon coated steel 100' tape won't stretch like a fiberglass will in long lengths. The tape can be more accurate by using the 12" mark for your starting point, as the end of the tape is often bulky loose, and an add to more discrepincies.

As for the 90* corners, they're easy when you use the Pythagorean theorem, A squared + B squared = C squared. A construction calc with feet/inches is extremely helpful for this. I typically run these numbers in the office beforehand and just note them on the print to save time in the field.
jomama45 is offline   Reply With Quote
The Following 2 Users Say Thank You to jomama45 For This Useful Post:
dalepres (03-30-2011), Willie T (03-30-2011)
Old 03-30-2011, 10:35 AM   #4
Master General ReEngineer
 
Bondo's Avatar
 
Join Date: Dec 2007
Location: Chaumont River, Ny.
Posts: 3,727
Rewards Points: 2,088
Default

Laying out building footings


Quote:
Please share your tips for precision layout - preferably on a budget but, if necessary,
Ayuh,.... Batter boards, string lines, 'n careful meassurements,...
Bondo is offline   Reply With Quote
The Following User Says Thank You to Bondo For This Useful Post:
dalepres (03-30-2011)
Old 03-30-2011, 06:07 PM   #5
Member
 
Join Date: Jun 2009
Location: Somerset, England
Posts: 680
Rewards Points: 500
Default

Laying out building footings


There's also the Groma used for 1,000's of years and never fails.
Name:  200px-Groma.jpg
Views: 914
Size:  27.3 KB
Some people will tell you that plumb lines don't work in windy conditions, but if you let the plumb bob hang in a bucket with some oil in, it will work perfectly.
stuart45 is offline   Reply With Quote
Old 03-30-2011, 09:10 PM   #6
Old School
 
Willie T's Avatar
 
Join Date: Jan 2009
Location: St. Petersburg, FL Minds of moderate caliber ordinarily condemn everything which is beyond them.
Posts: 3,634
Rewards Points: 2,000
Default

Laying out building footings


Don't forget after you have turned your angles (no matter the method you choose to use) double check all your squares and rectangles by pulling a steel tape diagonally from corner to corner. The opposite cross measurements must read exactly the same.
__________________
"True eloquence consists in saying all that is necessary, and only that which is."
François Duc de La Rochefoucauld
Willie T
Willie T is offline   Reply With Quote
Old 03-30-2011, 09:13 PM   #7
Member
 
Join Date: Mar 2011
Posts: 79
Rewards Points: 75
Default

Laying out building footings


I went to both rental places in town today to see what they had. Both had sub-300-dollar optical levels - that was it. And they want 50 a day to rent them. Amazon has a David White theodolite that goes to 5 seconds for 861 dollars. If I bought one, I could probably sell it for 500 or 600 on eBay after the house is built so, to me, renting junk for 50 a day is just not an option. But, I don't want to spend the money for the David White either.

I am leaning toward the 1000s of years old Pythagorean theory method. Batter boards are a real problem here; the soil is so rocky that we can't pound more than a few inches in most places. I even bought the Rousseau batter board system with metal form stakes to try to get around it. As I pound them in, the metal form stakes turn and twist around the rocks - and many of them still won't go far enough into the ground to be stable.

I just realized, though, that even though I can't them to go in straight enough to use with the Rousseau units, I could use the metal form stakes and get a wooden board level across them. I'll put in some stakes as best I can before the excavator comes so I can get as close as possible to recreating a corner pin as a starting point when we actually start the layout for the forms. I have a bunch of 6 inch nails that I can use to mark points that I should be able to get into the ground accurately.

It's probably no surprise for anyone who has taken on something like this; I took off this week to be here when the excavator came - originally scheduled for Wednesday. Now he isn't coming until, hopefully, Friday. Possibly Saturday.
dalepres is offline   Reply With Quote
Old 03-30-2011, 09:17 PM   #8
Old School
 
Willie T's Avatar
 
Join Date: Jan 2009
Location: St. Petersburg, FL Minds of moderate caliber ordinarily condemn everything which is beyond them.
Posts: 3,634
Rewards Points: 2,000
Default

Laying out building footings


Quote:
Originally Posted by stuart45 View Post
There's also the Groma used for 1,000's of years and never fails.
Attachment 31451
Some people will tell you that plumb lines don't work in windy conditions, but if you let the plumb bob hang in a bucket with some oil in, it will work perfectly.
Cool! Do you also use a chorobates?

All joking aside, I honestly do use a water level quite often.

__________________
"True eloquence consists in saying all that is necessary, and only that which is."
François Duc de La Rochefoucauld
Willie T
Willie T is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
getting a building permit after construction is done ChrisJJ General DIY Discussions 22 08-15-2012 09:18 AM
Container homes, what foundations does it need?? shabba1985 Building & Construction 27 03-08-2012 01:48 AM
Old Building problems jake62 Building & Construction 5 08-20-2010 09:32 AM
Building a front porch and have questions... SolidStateS15 Building & Construction 9 07-10-2010 05:16 PM
Building a new deck....and creative uses of granite scrap in outdoor living space Rhizzlebop Building & Construction 9 05-15-2009 12:17 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.