Insulating & Ventilating Vaulted Ceiling


The family room in our home has vaulted ceilings and gets very hot on a warm day – to the point the A/C can’t keep the room cool. The current construction of the roof & insulation ceiling is:

The roof is dark composition shingle, over ½” CDX ply wood. The framing is 2x10 rafters 24” OC. And the room is finished in sheetrock. Each rafter bay is stuffed with fiberglass insulation. 3 small ventilation holes are drilled at the end of each rafter bay. The rafter bay cavity is 9" high. Ventilation is minimal.

While we have R30 insulation – the room still gets unbearably hot. Our guess is the lack of ventilation allows heat to build up and ultimately overwhelms the insulation.

We are looking at removing the roofing and CDX sheating to re-insulate with POLY ISO boards and increasing ventilation. We have 3 different options and trying to find the best approach for minimizing thermal gain in our home. We live in central East SF Bay Area. Summers are dry and can get very warm - 100+ degree days not uncommon.

In each option we increase ventilation in each rafter bay.

Option 1 - Use 2 sheets of 3” PolyISO, providing R36. Create a 3” venting space between the insulation and the top of the cavity (9" Cavity - 6" Insulation).

Option 2 - In this option we increase the insulation by 1.5” getting to 7.5" total insulation – increasing the RValue to about R45 - Create a 1.5” venting space between the insulation and the top of the cavity

Option 3 - In this option use two 3" PolyISO sheets - but we Increase ventilation flow around insulation boards by putting 1” furring strips between each 3” sheet of PolyISO. Our goal is to increase airflow between PolyISO sheets to reduce the overall temperature in rafter cavity. Net result is 1" of airflow between boards, 2" between insulation and top of the cavity.

Would appreciate input on best approach to reduce thermal gain.

Thanks in advance for your help – Frank

fgaldes is offline   Reply With Quote
Join DIYChatroom.com

Join the #1 DIY Forum Today - It's Totally Free!

DIYChatroom.com - Are you about to start a new home improvement task and need some help? Do you need advise on what products to buy? Or maybe you can give others some advice? No matter where you fit in you'll find that DIY Chatroom is a great community to join. Best of all it's totally free.

Join DIYChatroom.com - Click Here
JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. DIYChatroom.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any home improvement task!
Old 08-12-2010, 10:14 AM   #2
STAFF
 
BigJim's Avatar
 
Join Date: Sep 2008
Location: East Tennessee
Posts: 4,657
Default

Insulating & Ventilating Vaulted Ceiling


You didn't say but I assume you have a good ridge vent. There should have been the styrofoam chases against the underside of the decking to get a good air flow also.

This may not interest you but when I built my house with a vault, I had the same problem, I looked into installing a "skin roof". A skin roof is a roof built above your existing roof with an air passage between. The skin roof is built with the chimney effect in mind.

Hot air rises drawing in cool air at the bottom and discharging at the top. This would keep the existing roof much cooler in another way, the sun would not hit the existing roof. I don't know if this would work or not as I have never seen one personally, maybe someone on the forum has. Just a thought.

__________________
New members: Please consider adding your location to your profile, it helps other members to give more accurate answers to your questions.


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


Jim
BigJim is online now   Reply With Quote
Old 08-12-2010, 03:51 PM   #3
Moderator
 
Join Date: Mar 2009
Posts: 8,786
Default

Insulating & Ventilating Vaulted Ceiling


I believe R-30 is 9-1/2", R-25 is 8", are you positive on your R-values for the inch thickness?

22-1/2" rafter blocks with only 3- 1-3/4" holes (older) have a sq.in.NFVA of 7.22, less than 1/2 of the required 18 NFVA.
Read these: http://danperkinsroof.com/1108_JCL_Perkins_A.pdf
http://www.buildingscience.com/docum...aspen-profile/ Click on all the links.

http://www.buildingscience.com/docum...on?full_view=1

Be safe, Gary
__________________
Clothes taking longer to dry?
Clean the dryer screen in HOT water if using fabric softener sheets.
They leave a residue that impedes air-flow, costing you money.
Clean the ducting in the last six months? 17,000 dryer fires annually!
Gary in WA is offline   Reply With Quote
Reply


-->
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
HELP! lighting question for vaulted ceiling pauls General Discussion 5 07-03-2010 05:53 PM
Insulating a Perfectly Good Ceiling Creekbender Building & Construction 2 03-02-2010 07:55 AM
Insulating Vaulted Ceiling cibula11 Building & Construction 11 01-31-2010 09:48 AM
Insulating basement ceiling - your recommendations? jtmann HVAC 8 11-24-2009 05:44 PM
insulating vaulted ceiling johnnyboy Building & Construction 7 08-26-2009 11:55 PM


Top of Page | View New Posts


All times are GMT -4. The time now is 02:47 AM.


© 2003 - 2010 The Building Network LLC