How to finish my bathroom?


I have a 10' ceiling bathroom that I am finishing. My question is regarding the granite tiles I want to put on the walls of the shower, and the two pony walls. This image shows the area: Bathroom image

As you can see the green board was installed by my contractor, as I was not really thinking ahead. I know I should have had the area floated but I didn't.

It may be over kill but my plan is use 30 lb roofing paper on top of the green board, a layer of mortar, then 1/2" Hardibacker (due to the shower valve installed position), another layer of mortar and then my granite tiles.

The bottom hot mop area is about 10" high and the green board protrudes about 1/2" out into the shower center past the hot mop. I am thinking I just float the grout on top of the hot mop and then my tiles? Or do I extend my green board down to the ground, or some distance above it?

Am I way off base here or am I close?

__________________
My constant project is my home which was built in 1947. We have remodeled almost all of it and added 1000 square foot in 2007. Lars Construction got me up to drywall and I did the rest.
kemerick is offline   Reply With Quote
Old 10-03-2007, 12:32 PM   #2
Member
 
Join Date: Mar 2007
Location: Long Island, NY
Posts: 9,519
Default

How to finish my bathroom?


I don't understand the use of sheetrock in the shower area at all. There are many other products better suited to be used. The two niches are prime candidates for water infusion. What use is the 1/2" hardibacker over compromised sheetrock.
The wall treatment(sheetrock) should have gone over the shower curb to cover the seam, not butt up against it. Even if the hardibacker goes on top. You should never miss an opportunity to keep water away from getting behind the wall.
Ron

Ron6519 is offline   Reply With Quote
Old 10-03-2007, 06:07 PM   #3
Kyle Emerick
 
kemerick's Avatar
 
Join Date: Sep 2007
Location: Vista, CA
Posts: 106
Default

How to finish my bathroom?


The sheetrock goes over the hot mop by a few inches. It does stick out past the hot mop is what I meant. If I were to Hardibacker over the sheetrock and take it down to the floor, there would be a void behind the Hardibacker at the bottom. My intent was to just mortar it.

So what are you suggestions at this point Ron?
__________________
My constant project is my home which was built in 1947. We have remodeled almost all of it and added 1000 square foot in 2007. Lars Construction got me up to drywall and I did the rest.
kemerick is offline   Reply With Quote
Old 10-09-2007, 06:52 AM   #4
Kyle Emerick
 
kemerick's Avatar
 
Join Date: Sep 2007
Location: Vista, CA
Posts: 106
Default

How to finish my bathroom?


Does anyone have any suggestions for me at this point? Tear off the green board and start over?

I talked to two tile companies in my area and they both said roofing paper with Hardibacker over the green board will suffice.
__________________
My constant project is my home which was built in 1947. We have remodeled almost all of it and added 1000 square foot in 2007. Lars Construction got me up to drywall and I did the rest.
kemerick is offline   Reply With Quote
Old 10-09-2007, 10:48 AM   #5
Member
 
Join Date: Apr 2007
Posts: 55
Default

How to finish my bathroom?


Personally, I'd tear the entire thing out and start over. Those wing walls are way to unstable the way they are built. We'd build those out of 2x6s and run the ends down into the floor and bolt them to the joists. Work on getting those beveled ends of those wing walls perfect in the pictures they look like a wild beaver got at them. Tear out that green board and install a proper tile underlayment that will be flush with the finished drywall allowing your tile to end properly and not be proud. Look into some Nobel premade niches to install in those 2 holes. Nows the time to do the work required for longevity of your shower.
__________________

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
Mike Finley is offline   Reply With Quote
Old 10-09-2007, 09:18 PM   #6
Kyle Emerick
 
kemerick's Avatar
 
Join Date: Sep 2007
Location: Vista, CA
Posts: 106
Default

How to finish my bathroom?


Sounds like good advice Mike. I need to see about the shower valve fitting however as the way it is now, the green board needs 1/2 Hardibacker on top of it to make the valve flush. So if I rip off the green board and lay down 1/2" Hardibacker, I will need to move the shower valve back a half inch.

I don't think I am gonna do much to the Pony wall other than using some heavy duty L brackets where it attaches to the walls as they are pretty sturdy the way the are now.

I'll also look into some premade niches...
__________________
My constant project is my home which was built in 1947. We have remodeled almost all of it and added 1000 square foot in 2007. Lars Construction got me up to drywall and I did the rest.
kemerick is offline   Reply With Quote
Old 10-10-2007, 07:45 PM   #7
Member
 
Join Date: Oct 2007
Posts: 96
Default

How to finish my bathroom?


Kyle, I gotta agree with Mike.
You'll sleep better knowing the backer board is designed to withstand moisture indefinitely. Hardibacker is ideal in this situation. I've seen the samples that have been soaking in a sealed container without any sign of deterioration.
It cuts easy too. You really ought to rebuild the wing walls. At this point,
you may wish to design in a recessed niche in the wall to accomodate shampoo and soap bottles etc. What's your plan to contain the shower head water? I imagine a half moon curtain rod? Or are you thinking about glass block or framed tempered on top of the wing walls?
RemodelMan is offline   Reply With Quote
Old 10-10-2007, 07:54 PM   #8
Kyle Emerick
 
kemerick's Avatar
 
Join Date: Sep 2007
Location: Vista, CA
Posts: 106
Default

How to finish my bathroom?


For the shower head water I plan on doing glass with a glass door. Once the granite tiles are done I will take measurements and get the glass cut.
__________________
My constant project is my home which was built in 1947. We have remodeled almost all of it and added 1000 square foot in 2007. Lars Construction got me up to drywall and I did the rest.
kemerick is offline   Reply With Quote
Old 10-10-2007, 08:04 PM   #9
Member
 
Join Date: Oct 2007
Posts: 96
Default

How to finish my bathroom?


Check with a commercial glass company that deals with contractors, architects, designers etc.
They'll have several interesting hardware and glass options for you, to accomodate planned frames and doors. They usually welcome walk-in traffic who have exacting measurements(+ photos?!)on hand. Your pictures are very beneficial and will certainly help increase the value of your home when/if you decide to sell.

RemodelMan is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
ceiling paint in bathroom gorilla325 Painting 15 09-10-2012 06:07 PM
Wiring in New Addition? sandyman720 Electrical 6 11-27-2011 03:34 PM
Pay GC to construct home and finish it myself? L O N G . . . Badfish740 Off Topic 9 07-27-2007 08:44 AM
Second level / attic bathroom size moneymgmt General DIY Discussions 2 05-02-2007 07:32 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.