 |
11-08-2011, 03:05 PM
|
#1
|
|
Newbie
Join Date: Nov 2011
Posts: 1
|
header placement at top plate of exterior wall
I am adding a double door to the first floor 2x4 exterior wall of a two story house. The rough opening is 76 inches wide by 82.5 inches high. The wall is 9 feet tall. I attached the header to the top plate and framed down. The header is a double 2X10 with three jack studs at each end reaching up to the header. 2x4 framing down to the door (approx 8 inches).
Is this an acceptable placement of the header and use of jack studs to meet code?
Last edited by xhudak; 11-08-2011 at 05:34 PM.
Reason: more information to better present post
|
|
|
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. DIYChatroom.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any home improvement task!
11-08-2011, 05:43 PM
|
#2
|
|
Framing Contractor
Join Date: Apr 2006
Location: Caldwell, NJ
Posts: 1,755
|
header placement at top plate of exterior wall
Quote:
Originally Posted by xhudak
I am adding a double door to the first floor 2x4 exterior wall of a two story house. The rough opening is 76 inches wide by 82.5 inches high. The wall is 9 feet tall. I attached the header to the top plate and framed down. The header is a double 2X10 with three jack studs at each end reaching up to the header. 2x4 framing down to the door (approx 8 inches).
Is this an acceptable placement of the header and use of jack studs to meet code?
|
Call your building inspector and ask him/her. They have to inspect it anyway. Who told you what size header to use?
__________________
Joe Carola
|
|
|
11-08-2011, 07:57 PM
|
#3
|
|
Member
Join Date: Aug 2011
Posts: 74
|
header placement at top plate of exterior wall
As far as res. building code it's fine. Alot of guys "cripple down". I prefer to put my header at door high and "cripple up" but it makes no difference. As far as header size- some areas allow sandwich headers like you described and some do not. Some require engineering, others do not. As was stated above- ask the building dept.
|
|
|
11-08-2011, 10:19 PM
|
#4
|
|
Member
Join Date: Feb 2010
Location: MI's Western UP
Posts: 599
|
header placement at top plate of exterior wall
I think there are plenty of places were you can get by without an inspection for just changing out a door. but since the OP asked about code, ask the local building dept.
cripple up woulds seam a bit more stable than cripple down, but with triple jacks and an 8" cripple, that shouldn't be an issue.
Last edited by forresth; 11-09-2011 at 11:31 PM.
|
|
|
11-09-2011, 10:32 PM
|
#5
|
|
Moderator
Join Date: Mar 2009
Posts: 8,780
|
header placement at top plate of exterior wall
I'll make it unanimous, ask locally. Here, our seismic zone requires flat steel strapping tying the upper and lower horizontal framing of the window-two studs back on both sides for wall continuity.
Gary
__________________
Clothes taking longer to dry?
Clean the dryer screen in HOT water if using fabric softener sheets.
They leave a residue that impedes air-flow, costing you money.
Clean the ducting in the last six months? 17,000 dryer fires annually!
|
|
|
11-10-2011, 08:21 PM
|
#6
|
|
journeyman carpenter
Join Date: Sep 2011
Location: nova scotia canada
Posts: 2,162
|
header placement at top plate of exterior wall
when i install large patio doors i use double jacks to ensue the header is properly supported, the header gets cut a little bit longer than actually required, this is so i can shift the exact location of the door if required based on the stair location of a yet to be built deck or as per client request. code doesnt allow us to cripple the header down.. any loads the header will be carrying must be directly on the header other than double top plates, also its more work to shift a rough opening if the header is crippled down, regarding header size and plys. with larger rough openings a triple ply header is sometimes required if there are point loads from above which will be landin on it. ive had to use 2 ply lvl in some situations
not arguing.. just stating methods i was taught
Last edited by woodworkbykirk; 11-10-2011 at 08:23 PM.
|
|
|
11-10-2011, 09:58 PM
|
#7
|
|
Member
Join Date: Aug 2011
Posts: 74
|
header placement at top plate of exterior wall
Quote:
|
Originally Posted by woodworkbykirk
when i install large patio doors i use double jacks to ensue the header is properly supported, the header gets cut a little bit longer than actually required, this is so i can shift the exact location of the door if required based on the stair location of a yet to be built deck or as per client request. code doesnt allow us to cripple the header down.. any loads the header will be carrying must be directly on the header other than double top plates, also its more work to shift a rough opening if the header is crippled down, regarding header size and plys. with larger rough openings a triple ply header is sometimes required if there are point loads from above which will be landin on it. ive had to use 2 ply lvl in some situations
not arguing.. just stating methods i was taught
|
That's how I like to do it as well, all though in las Vegas (Clark county) they do not allow laminated headers. That's the only place I've ran into that though.
|
|
|
11-10-2011, 10:31 PM
|
#8
|
|
journeyman carpenter
Join Date: Sep 2011
Location: nova scotia canada
Posts: 2,162
|
header placement at top plate of exterior wall
thats right, you guys have to use a single peice of wood correct.. 4x10's and what not.
ive never done it, how is the lumber when it comes to being true.. as per no warping, severe cupping and what not
|
|
|
11-10-2011, 10:52 PM
|
#9
|
|
Member
Join Date: Aug 2011
Posts: 74
|
header placement at top plate of exterior wall
Some of them were dimensional lumber 4x10 and what not but most were 3 1/2 lvl or paralam. It was crazy down there. I was framing 8-10 houses at a time so my cut & buck crew would cut all the headers for the whole release at one time and then roll on to the next tract. Headers were always ending up in the wrong spot or sometimes the wrong house. It's hard to keep track of everything when there's 200 guys framing everything at once.
|
|
|
11-11-2011, 05:38 PM
|
#10
|
|
journeyman carpenter
Join Date: Sep 2011
Location: nova scotia canada
Posts: 2,162
|
header placement at top plate of exterior wall
i couldnt imagine doing that sorta thing. im use to framing custom homes and large addtions where its one crew doing the entire job form to finish... the only hands touching lumber that dont install are the labors who take it off the truck or carry it over to the cut man.
its always the same guy laying out everything structural.. backframing though which ever two guys are building that wall will lay it out.. also our crew had 7 guys all of which were specialists in different things .. we had 2 master framers, 2 master siders one of which also does foundations. a cabinet builder. myself who oversaw the trim
|
|
|
11-11-2011, 06:13 PM
|
#11
|
|
Member
Join Date: Aug 2011
Posts: 74
|
header placement at top plate of exterior wall
Ya that's the first and only time I've done "stage" framing. It's a different crew for everything. Snap and layout, platers, detalers, framers, sheaters, joist and truss, elevations (window wraps, arches ect.) pick up. And then I had about 30 hourly guys to go and fix everything the piece workers would miss. It was a whole different world.
|
|
|
11-11-2011, 10:12 PM
|
#12
|
|
journeyman carpenter
Join Date: Sep 2011
Location: nova scotia canada
Posts: 2,162
|
header placement at top plate of exterior wall
ive heard of this being done in western canada and parts of ontario..
with us when a room is presumed to be complete for finish, one guy will do a walk through check everything from missing backers, strapping nailed off. check for point loads.. laminated beams and posts properly nailed off etc.
|
|
|
-->
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|