Garage slab pour, Control joint and grounding question


Hello all,

About to finally pour the slab on my "going on 4 months" garage project. Looking for a bit of advice on two items.

I will be pouring a slab inside the existing 10" stem wall perimeter that was poured 4 months ago. Stem wall extends to footers that are 48" below grade. Dimensions are 18' x 30'. Garage is framed, roofed and sided. I've decided on wire mesh sheets as opposed to 3/8" rebar. Availability was more at play in this choice than cost or strength.

Question #1:

I plan on putting in control joints, 1 down the center of the 18' dimension, and two on the 30' dimension. Are these needed on a slab with a frost wall? I've also heard of using metal drywall corner edging underneath the slab to form joints instead of troweling or cutting. Is this a viable option, or just a shoddy short cut?

Question #2:

I was planning on running my electric grounding wire along the rebar until I decided on wire mesh. Can I bond the ground to the mesh as well? If not, I can still drive in a couple grounding rods, I've just heard that a slab ground is preferable to driven rods.

Thanks in advance.

italie is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off





Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.