Hey all, i am putting an addition on the top of another wide open room, problem i face is that, i only want to do the shell this spring and take my time (money issues) completling the rest... I will have OW Floor joist spanning 23 feet, 14" depth 16" OC.. do not want to remove drywall below.. All of my HVAC and electrical will be ran through the joist, as we will also have cathedral ceilings... My question is, when i frame this bad boy up, do i need to deck the floor before i put my walls up? I really can't, i don't have the space to do all of the HVAC and electrical work with the current roof still on, and i won't have the time (weather) to do it with the roof off and new walls and roof not up... Every time i have framed something, joist, decking, walls.. never done it without decking the floor first... is this OK structurally (I'm 90% sure it is) but is it OK by code (generally) in most places (South Jersey)... Also, with open web joist, do i need to have cladding on the ends or can i sheath right over them?


Thank you in advance!

Steve

Sdot is offline   Reply With Quote
Old 03-17-2014, 02:58 PM   #2
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 26,389
Rewards Points: 108
Default

Framing an addition


You need to being doing a whole lot more research on that plan.
Not much of it is going to work out.
Yes there needs to be LVL rim joist made just for banding the engineered floor joist. Go on the wed side of the company making the joist for install info.
Decking needs to be glued and nailed in place with 8D ring shank nails before any walls go up.
Save up the money and do it right. That whole thing need to be at least dried in including shingles and siding,

__________________
When posting in forums, letting us know your location will help others give better feedback/advice/solutions to your questions
joecaption is offline   Reply With Quote
The Following 2 Users Say Thank You to joecaption For This Useful Post:
Sdot (03-17-2014), woodworkbykirk (03-18-2014)
Old 03-17-2014, 03:11 PM   #3
Newbie
 
Join Date: Mar 2014
Posts: 7
Rewards Points: 0
Default

Framing an addition


thanks Joe, yea i already had the joist engineered. I am lucky enough to have a truss company within walking distance.. They gave me the plans for the trusses and joist.. i didn't see anything on there about the rim joist.. i figured i would stop over there and ask for install info before i give them okay to build. Even with any amount of money i would still need to run all of my electrical and HVAC after i install joist, but before i put decking down... this could take days.. with the whole house being exposed to the elements.. This is why i posed that question.. it would be a lot easier to get the shell up, windows, tyvek, sided and shingled.. then go in, run my electrical and HVAC, then put my subfloor down.. (this was my plan)
Sdot is offline   Reply With Quote
Old 03-17-2014, 03:24 PM   #4
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 26,389
Rewards Points: 108
Default

Framing an addition


Electrical and HVAC is always done after the buildings dried in.
You are getting permits for all this right?
Subflooring is always done before walls go up, no exceptions.
Under lament can go in after if needed.
There is no way to get around having to remove the insulation and drywall in the ceiling below.
Those engineered joist need to be sitting on top of the old top plates not the old ceiling joist.
A job like this needs to be done by a full crew of people that know what there doing to closed it in ASAP.
__________________
When posting in forums, letting us know your location will help others give better feedback/advice/solutions to your questions
joecaption is offline   Reply With Quote
Old 03-17-2014, 03:32 PM   #5
Newbie
 
Join Date: Mar 2014
Posts: 7
Rewards Points: 0
Default

Framing an addition


Thanks again joe, you are right.. i have 3 skilled and 2 laborers coming in to knock the framing out.. NO, i would not be sitting on top of the ceiling joist.. they are 24" OC we mapped it out, i would need to remove a couple, that would interfere with 16" oc.. it doesn't matter regardless, i would just seal her up and remove what i need to remove from below to access what i need to access.. It really isn't that big of a deal to do that, was just trying to see if that could be avoided... obviously your answer is it can't be done.. is there a structural reason behind this? i can't see adding 3/4 under the framing adding much support or tying much of it together.. just wondering why its done that way..

Thanks again for your quick replies, its much appreciated!
Sdot is offline   Reply With Quote
Old 03-17-2014, 03:38 PM   #6
Newbie
 
Join Date: Mar 2014
Posts: 7
Rewards Points: 0
Default

Framing an addition


ahhh that rim joist adds support to the floor... if you don't run it through the wall you have no support for the end of the subfloor in between joist... i got it... very dumb that i didn't think of that...
Sdot is offline   Reply With Quote
Old 03-17-2014, 03:40 PM   #7
Newbie
 
Join Date: Mar 2014
Posts: 7
Rewards Points: 0
Default

Framing an addition


yes I'm getting permits.. Btw... I'm not staring for another couple months.. I'm really still planning it all out, and getting my drawings together to get the permits... then decide on when to start... I'm sure i will have a lumber yard for a front yard for a couple weeks, until i see a full week without rain... lol
Sdot is offline   Reply With Quote
Old 03-17-2014, 04:01 PM   #8
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 26,389
Rewards Points: 108
Default

Framing an addition


Do not rush doing this, have plenty of tarps on hand to keep the lumber dry and some big enough to cover the whole addition if needed, weather man lie .
Use Advantech for the subflooring.
Bet you find out leaving those old ceiling joist is a mistake.
There just going to be in the way, and may though off your subfloor spacing.
__________________
When posting in forums, letting us know your location will help others give better feedback/advice/solutions to your questions
joecaption is offline   Reply With Quote
Old 03-17-2014, 06:00 PM   #9
Newbie
 
Join Date: Mar 2014
Posts: 7
Rewards Points: 0
Default

Framing an addition


WELLL... lol... in my original plan, they were going to be cut back of top plate during demo of old roof, then when i got the shell up (with no floor) was going to use a multi tool to cut screws and pull them out (after i screwed the old drywall underneath to new joist)... they will be in the way... you're right, best way is the right way, pull the ceiling out and go from there.. i didn't want to displace the family during this.. only for a week to break through and install the steps... but looks like a month or so at the in laws it is!

Do you know what it would cost (estimate) to get a crew to just do the framing in a day? just wondering.. all labor, i would supply all the materials..

Thanks again!
Sdot is offline   Reply With Quote
Old 03-17-2014, 06:02 PM   #10
Newbie
 
Join Date: Mar 2014
Posts: 7
Rewards Points: 0
Default

Framing an addition


i also wanted to save the insulation (loose) by keeping the drywall up, as a little sound barrier... again.. I'm causing more work for myself then i would if i just tore it all out... do i even need to insulate that area? or do you think 14" is enough space to dampen sounds... its a master bedroom... (kids on the other side of the house, lol) kitchen, dining room underneath..

Sdot is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
pocket hole jointery and cabinet screws for framing newbymodeler Carpentry 29 03-07-2013 03:17 PM
!!HELP!! Rain leaking between existing home and new addition NJGirl357 Roofing/Siding 4 09-10-2008 05:06 PM
to add an addition or not..... elmorem@gmail.com Building & Construction 2 02-17-2008 10:43 PM
Kitchen addition rwwood Building & Construction 2 10-29-2007 08:51 AM
Flat roof addition - Joists connected to structure via legerboard?? Rhino17 Building & Construction 2 09-01-2007 06:56 AM




Top of Page | View New Posts