footing for brick curb


my dad has a brick curb between his lawn and sidewalk that needs replaced. The curb is only two courses tall. The first row runs parallel to the sidewalk, the 2nd is perpindicular to the first. The problem is the footing underneath is junked. How deep does the new footing need to be poured? A mason said 12", but that seems like a bunch for two rows of brick.

Thoughts?

BTW....central Kansas

Master Brian is offline   Reply With Quote
Old 09-14-2010, 08:18 AM   #2
Member
 
Join Date: Apr 2009
Location: KS
Posts: 457
Rewards Points: 284
Default

footing for brick curb


Just tore out some of the existing footing, guessing it goes back to when the house was built in 1915, and it's only about 3" thick. Obviously, it didn't hold forever, but that is a long time. Is it really going to make much difference if we dig down 10-12" vs. just replacing what was there??

The mason, who is a neighbor/friend of mine, says he'll lay on whatever, but that going at least a shovels depth on the footing is best, but the deeper the better. While I don't argue that, I do question if it's really necessary on what we are having done. Only thing this is doing is somewhat holding the earth behind it back and being decorative.

I've included a picture to help give an idea of what we are re-doing and it will be mortared joints.

Thanks!
Attached Images
 

Master Brian is offline   Reply With Quote
Old 09-14-2010, 06:33 PM   #3
Member
 
Join Date: Dec 2008
Location: Pa
Posts: 50
Rewards Points: 25
Default

footing for brick curb


The rule of thumb in my area for a footer is 3' below grade
A frost footer is 18'
That said if the brick are dry laid a 12" base of stone is fine

Do a 6" base of 2b Clean ( 3/4 ) stone with a cover. This creates a Drain area so lifting is minimized
Then a 6" base of 2a modified stone ( 2bs with Limestone quarry dust mixed in) Tamp the last 6 Inches. This acts as a floating footer.

Even though the brick lasted for many years laid in Mortar I recommended a Dry laid brick OR an Engineered stone "E. P. Henry"

http://www.ephenry.com/Corporate/FactSheet.asp
21boat is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Damaged Shower Curb ohiogirl1965 Plumbing 0 06-29-2010 03:56 PM
Driveway - pour concrete over granite curb? homeowner54 Building & Construction 4 06-09-2010 11:10 PM
Footing drains in crawlspace on top of footing jbitt Building & Construction 8 01-12-2010 02:50 PM
Sinking footing tubes Farmer Z Building & Construction 19 11-17-2009 09:50 AM
Wrong Footing Dimensions HELP jhernan35 Building & Construction 2 04-15-2007 03:22 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.