finishing basement walls and floor


I want to put 1" XPS on floor than 5/8" or 3/4" T&G OSB. Walls will be 2" XPS all seams taped with tyvek tape including floor/wall and gaps filled with spray foam. 2"x4" studs framed against XPS no space and filled with unfaced fiberglass insulation and finished with 1/2" drywall.

1.Must the OSB be Pressure treated or AdvanTech or can I use regular T&G OSB?

2.Should the floor be installed first than the walls?

3.Does the bottom plate need to be P.T. when installed on XPS?

4.Do I need a thermal/capillary break between the bottom plate when installed on XPS. If so Suggestions.

5.Can I install the wall first on top of a ripped length of XPS say 6" wide then tape seams when I do the floor?

6. The side wall will need supports about every 3' from the sill plate to the joist for the top plate. Will those supports need to be pressure treated as they will sit on the foundation wall? gasket needed under plate?

7. After filling the rim joist with 2" XPS and sealing seams can I fill the rest of the cavity with unfaced insulation?

Thanks for your thoughts,
Micky

micky is offline   Reply With Quote
Old 02-22-2011, 10:47 PM   #2
Member
 
Join Date: Nov 2009
Location: west of chicago
Posts: 370
Default

finishing basement walls and floor


welcome

http://www.buildingscience.com/searc...eText=basement

this will get you started if the link doesn't work highlight/copy/paste

lots of info available using the search on this site

Just going to order roxul tonight through Lowes ( they finally carry it special

order ) for covering the xps rim joist but glass is acceptable.

High Gear is offline   Reply With Quote
Old 02-22-2011, 10:47 PM   #3
Member
 
Join Date: Aug 2010
Location: metro
Posts: 1,041
Default

finishing basement walls and floor


not really related but where do you go buy xps boards/sheets?
federer is offline   Reply With Quote
Old 02-22-2011, 11:15 PM   #4
Member
 
Join Date: Nov 2009
Location: west of chicago
Posts: 370
Default

finishing basement walls and floor


Home Depot , Menards , Lowes ect.
High Gear is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Finishing a cement basement floor with carpet and tile - no subfloor? vseven Flooring 2 09-21-2010 09:41 AM
Best way to insulate basement walls / floor? benze Building & Construction 1 09-07-2010 07:17 PM
How to solve problem of moist basement walls moist Building & Construction 4 08-30-2010 05:18 PM
Split level walls and floor joists - how are they constructed? jrbutterfly Building & Construction 2 06-09-2009 12:11 PM
Painting Basement Floor and Foundation Walls meth Painting 5 09-26-2008 07:54 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.