Finished Basement : Phase 1 : Framing


So i will be contacting the local building department monday to find out exactally what i need for permits. Good times...

My next question is with regards to framing.

1.) My basement is VERY dry, no moisture issue, have a dehumidifier that just about never runs, no leaks in the foundation. It is poured concrete with fiberglass insulation with the plastic on the outside to serve as a vapor barrier. Do i absolutly NEED to use PT for the bottom board?? I have heard both ways. I have heard that if the basement is dry, its not really an issue, but i'm wondering what an inspector will knock me for?

2.) with regards to the height of the framing. i have heard to leave a bit of a gap. because the floor slopes in some areas, its not exactally straight and level everywhere in order to help move water to a drain (heaven forbid a flood did occur). One source i have read says to leave like 1/8" to be able to stand the walls up, some are saying 1/4". Doing some basic measurments, over an 8ft section of wall, the height can change upwards of 1.5". Again, just need to know what an inspector will be concerned about.

3.) I had a section of wall right by the stairs where the previous owners had torn the insulation, looks like they came down the stairs with something big and put a huge hole in it. Then took clear plastic and taped over it. it looked hideous. Last week, i ripped it down, took 1x3 furring strips, used tapcons and secured the furing strips on, then used 3/4" poly stryrene insulation, and drywalled over it. Will this be a problem with pulling the permit to do the remaining work?? When do they actually come in and inspect??

Thanks for the info.

Dave

Advertisement

DWilde is offline   Reply With Quote
Old 12-28-2008, 11:21 AM   #2
Theres more then one way.
 
iMisspell's Avatar
 
Join Date: Jun 2007
Location: N.Y.
Posts: 244
Rewards Points: 150
Default

Finished Basement : Phase 1 : Framing


1) yes use PT.. not only do you have to, you have to for a reason.
Concrete has water in it, wood will soak up water, wood on concrete will = rot.

2) I would nail the top and bottom plates in place then cut the studs one by one if its that far out. Not that its gonna hold that much weight, but you want the top plate securly nailed to the bottom of the floor joists above. If you have a 1/8 thats not bad you could shim, but if your saying 1.5 then that seams like alot to me... im sure someone around here will have a trick or two which might help building the wall flat on the ground then kicking it up. You could also use ttwo bottom plates. Nail one down, frame the wall like you would normaly with twop and bottom plates then kick up the wall and left it on top of the bottom plate which you already have nailed down, that way will make it easyer to flip up also..

3) when you say, tapcons screws it seams like you are talking about fasening the furring strips to concrete ? Im pretty sure you need PT any time wood touchs concrete, any time (could be wrong).

Any chance your gonna post pictures of your progress once you start

_

Advertisement

__________________
.
~ What was once an opinion, became a fact, to be later proven wrong ~

My current learning experience - 22x22 addition - Work shop, music-room, master bedroom above..
iMisspell is offline   Reply With Quote
Old 12-28-2008, 12:09 PM   #3
Member
 
Join Date: Jul 2008
Location: Canada (s/w ON.)
Posts: 2,294
Rewards Points: 1,000
Default

Finished Basement : Phase 1 : Framing


Quote:
Originally Posted by iMisspell View Post
1) yes use PT.. not only do you have to, you have to for a reason.
Concrete has water in it, wood will soak up water, wood on concrete will = rot.

2) I would nail the top and bottom plates in place then cut the studs one by one if its that far out. Not that its gonna hold that much weight, but you want the top plate securly nailed to the bottom of the floor joists above. If you have a 1/8 thats not bad you could shim, but if your saying 1.5 then that seams like alot to me... im sure someone around here will have a trick or two which might help building the wall flat on the ground then kicking it up. You could also use ttwo bottom plates. Nail one down, frame the wall like you would normaly with twop and bottom plates then kick up the wall and left it on top of the bottom plate which you already have nailed down, that way will make it easyer to flip up also..

3) when you say, tapcons screws it seams like you are talking about fasening the furring strips to concrete ? Im pretty sure you need PT any time wood touchs concrete, any time (could be wrong).

Any chance your gonna post pictures of your progress once you start

_
I like your idea of a double plate on the bottom! I'm planning a similar project and running a PT plate, Tapconed to the floor will work well for me! Thanks for the suggestion!
Wildie is offline   Reply With Quote
Old 12-28-2008, 12:26 PM   #4
Newbie
 
Join Date: Dec 2008
Posts: 5
Rewards Points: 10
Default

Finished Basement : Phase 1 : Framing


Quote:
Originally Posted by iMisspell View Post
1) yes use PT.. not only do you have to, you have to for a reason.
Concrete has water in it, wood will soak up water, wood on concrete will = rot.


Any chance your gonna post pictures of your progress once you start

_
I may happen to have a section or two down already that has non-P/T wood at the base. Its being held in place by power nails driven by a powder loaded remington gun. Is there any trick to getting these out so i can change out the bottom??

on the Pics, Ofcourse!
DWilde is offline   Reply With Quote
Old 12-28-2008, 12:58 PM   #5
Registered User
 
Termite's Avatar
 
Join Date: Apr 2008
Posts: 6,520
Rewards Points: 2,000
Default

Finished Basement : Phase 1 : Framing


Use PT lumber. Not an option.

The gap at the bottom is optional in most cities, but some cities with expansive soils require it. If the floor slab is moving I'd suggest that you consider it. If it is not moving then cut your studs to fit the plates as suggested. Or shim the walls.

They'll do an inspection of any underslab plumbing you install, a rough-in of the framing, plumbing, HVAC, and electrical, perhaps an insulation inspection (normally all at once), perhaps a sheetrock inspection (doubtful and stupid), and a final inspection.
Termite is offline   Reply With Quote
Old 12-29-2008, 02:52 PM   #6
Member
 
Join Date: Nov 2007
Location: Appleton, Wisconsin
Posts: 942
Rewards Points: 518
Default

Finished Basement : Phase 1 : Framing


You can try a pry bar to get the bottom plate up. It will depend on how well the nails attached to the concrete, some concrete accepts these nails better than others. If a pry bar doesn't work you can use a sawzall to cut the plates where the nails are and remove the plates and then use a grinder to grind the nails flush with the concrete.

Advertisement

ponch37300 is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Framing a basement ledge nlexi912 Building & Construction 8 11-14-2011 05:24 PM
Vapor barrier requirement for finished basement JTK Building & Construction 13 02-05-2011 05:30 PM
Framing in a walk-out basement ryanc Building & Construction 2 01-19-2008 11:54 AM
New poster, looking for advise on heating cooling in basement that is being finished blthomas HVAC 11 12-07-2007 11:07 AM




Top of Page | View New Posts