Fence Post on Concrete


I have an ecology block retaining wall that I want to put a fence on. Right now, the top of the retaining wall is about a foot lower than the rest of the yard. (Dirt basically drops off to the drainage rock)

I would also like to cover the ugly top of the ecology blocks. I thought I could do all of this by attaching the 4x4 fence posts (6' spacing) somehow to the concrete, putting a 2x12 on the bottom 12" of the post (kind of a 1' retaining wall on top of the ecology blocks) fill that with dirt, so now the post is anchored to the ecology block with 1' of dirt on one side, and nothing on the other, then build the 6' fence from the new ground level which will be 1' above the post anchor.

Firstly does anyone see any issues with this? Will I be able to find a method to secure the post to the ecology block solid enough that it will be structurally sound?

Secondly, what is the best way to anchor the post? Right now I'm considering two options, either a base that accepts the 4x4 with four anchor bolts that hold it down. Like this:

http://www.fasteningsystem.com/produ...productid=3089

My main concern is whether the wedge or sleeve anchors will split the concrete as it isn't reinforced.

The other option would be to use something like this:

http://www.fasteningsystem.com/produ...productid=2353

and bore out a hole, put this in, and fill w/ epoxy.

With that method I'm not sure if the bracket would be strong enough to support the fence and retain the soil.

Any thoughts or ideas?

Thanks,

Richard

Advertisement


Last edited by rjschwar; 04-29-2010 at 04:10 PM.
rjschwar is offline   Reply With Quote
Old 04-29-2010, 04:02 PM   #2
Member
 
Join Date: Jul 2008
Location: NW of D.C.
Posts: 5,990
Rewards Points: 2,000
Default

Fence Post on Concrete


Quote:
Originally Posted by rjschwar View Post
My main concern is whether the wedge or sleeve anchors will split the concrete as it isn't reinforced.
"As a rule of thumb, the expansion anchor industry has established a minimum standard of ten (10) anchor diameters for spacing between anchors and five (5) anchor diameters from an unsupported edge. When vibration or sudden impact are part of the load conditions, the spacing should be increased."

Advertisement

Yoyizit is offline   Reply With Quote
Old 04-29-2010, 04:12 PM   #3
Member
 
Join Date: Nov 2009
Posts: 83
Rewards Points: 75
Default

Fence Post on Concrete


I had read that before, which is why I was a little concerned because the retro-fit anchor has holes that appear to be about 4" apart, and says to use 1/2" anchors.
rjschwar is offline   Reply With Quote
Old 04-29-2010, 04:23 PM   #4
Member
 
Join Date: Jul 2008
Location: NW of D.C.
Posts: 5,990
Rewards Points: 2,000
Default

Fence Post on Concrete


Quote:
Originally Posted by rjschwar View Post
I had read that before, which is why I was a little concerned because the retro-fit anchor has holes that appear to be about 4" apart, and says to use 1/2" anchors.
4"/10 = 0.4". That seems close enough to 1/2". It also depends on the compressive strength of your concrete.

Last edited by Yoyizit; 04-29-2010 at 04:25 PM.
Yoyizit is offline   Reply With Quote
Old 04-29-2010, 05:11 PM   #5
Mod
 
kwikfishron's Avatar
 
Join Date: Mar 2010
Location: Kansas (NCK)
Posts: 7,799
Rewards Points: 2,514
Default

Fence Post on Concrete


How big are these are these blocks you want to attach to? How much do they weigh? How are they connected to the block below other than gravity and the tongue they sit on?
__________________
A Picture Is Worth A Thousand Words
Especially In The DIY Chatroom
kwikfishron is online now   Reply With Quote
Old 04-29-2010, 05:33 PM   #6
Old School
 
Willie T's Avatar
 
Join Date: Jan 2009
Location: St. Petersburg, FL Minds of moderate caliber ordinarily condemn everything which is beyond them.
Posts: 3,634
Rewards Points: 2,000
Default

Fence Post on Concrete


I don't see attachment to the top of eco-blocks to be the way to go.

Why would you not remove sections of block and sink the fence posts as normally done? Either cut block pieces to fill in up to the sides of the posts, or fill in the holes with gravel.

As for finishing off the tops of the blocks, they sell smooth caps for these blocks.
__________________
"True eloquence consists in saying all that is necessary, and only that which is."
François Duc de La Rochefoucauld
Willie T
Willie T is offline   Reply With Quote
Old 04-29-2010, 05:52 PM   #7
Member
 
Join Date: Nov 2009
Posts: 83
Rewards Points: 75
Default

Fence Post on Concrete


The blocks are 2'x2'x6' solid concrete and each weighs about 3000 lbs. This is a gravity wall w/ no tie backs or anything. Each block has a hump on top that fits in a groove of the one above. I found a couple pics to show the wall from below and above, which are attached. The picture from the top doesn't show it but there is currently about a 1' drop from the dirt to the top of the block at the end of the yard.

I know they have caps for ecology blocks, but I can't find anyone around me sells them. The places that sell ecology blocks don't sell the caps. I'm not sure what you mean by removing sections of block.

Another option I had thought of would be to anchor the fence posts to the edge of the blocks through the sides of the posts, like a railing of a deck. I could have it hang the post down 2 feet or so and sink four anchors or so in that way, but it seems like bolting to the top would be stronger. Not sure.
Attached Images
   

Last edited by rjschwar; 04-29-2010 at 05:55 PM.
rjschwar is offline   Reply With Quote
Old 04-29-2010, 06:32 PM   #8
Old School
 
Willie T's Avatar
 
Join Date: Jan 2009
Location: St. Petersburg, FL Minds of moderate caliber ordinarily condemn everything which is beyond them.
Posts: 3,634
Rewards Points: 2,000
Default

Fence Post on Concrete


Remove a top block.

Cut a 7" or 8" corner out

Put the stone back in place

Drop a fence post in

Block off the open side with plywood

Pour concrete around the post

Remove the plywood after concrete is set

Backfill again

The post will sit on the second row of blocks, allowing any water that goes down alongside the post to seep out.
Of course, this is one of those things best planned out and thought of before setting the blocks.
Digging out dirt and bolting to the backsides might be easiest.

If you had in mind to try this, you could use a core drill and drill down into the blocks to drop in posts. No moving blocks that way. Any large plumber should have a core drill.
Attached Thumbnails
Fence Post on Concrete-eco-block-1.jpg   Fence Post on Concrete-eco-block-2.jpg   Fence Post on Concrete-eco-block-3.jpg  
__________________
"True eloquence consists in saying all that is necessary, and only that which is."
François Duc de La Rochefoucauld
Willie T

Last edited by Willie T; 04-29-2010 at 07:13 PM.
Willie T is offline   Reply With Quote
Old 04-29-2010, 06:57 PM   #9
Mod
 
kwikfishron's Avatar
 
Join Date: Mar 2010
Location: Kansas (NCK)
Posts: 7,799
Rewards Points: 2,514
Default

Fence Post on Concrete


Since you have some substantial blocks of concrete, digging out and bolting to the yard side is the strongest way to go. Bolting to the outside is not as strong but would work if done properly and give you 2 extra feet of yard. As far as your links, maybe #1 and that’s a big maybe and definitely not #2.
__________________
A Picture Is Worth A Thousand Words
Especially In The DIY Chatroom
kwikfishron is online now   Reply With Quote
Old 04-29-2010, 07:13 PM   #10
Member
 
Join Date: Nov 2009
Posts: 83
Rewards Points: 75
Default

Fence Post on Concrete


I didn't think about that. I don't have the ability to move the blocks at this point, but I might be able to cut away the corner of each top block. I'm not sure I want to do that though as I don't have the tools to do it.

That seems similar to doing a deck railing kind of design. If I didn't cut away the corner, and just anchored the posts to the side of the ecology block with say 4 anchors. If I'm remembering my physics correctly I basically have a lever w/ the fulcrum at the bottom.

So say 9' 4x4 (2' below the ecology blocks, 1' for dirt/"retaining wall", and 6' for fence. The pull out strength of the 1/2" wedge anchors is said to be 2400 lbs. I will use half of that to be on the really safe side, so 1200 lbs per anchor. If I put 4 anchors, at 5", 10", 15", and 20" from the top of the ecology block I see that as 1200 lbs at each point 19", 14", 9", and 4" from the fulcrum. Thus 1200(19+14+9+4) = x*108. (108 is assuming a force at the top of the 9' post) That means x = 511 lbs of force at the very top of the post could be supported by the 4 bolts. This seems like plenty of strength, but I don't know.

I could always use 3 5/8 inch anchors instead, or use a 10 foot post and have 3' below the top of the ecology block.

Does this add up for anyone else, physics was a few years ago. I kind of like this idea as it gives me even a bit more yard, and I don't have to invest a couple hundred bucks in the brackets that bolt down to the top. The more I think about it, the more I think that this would indeed be stronger than bolting to the top where all the force from the bolts is only a few inches from the fulcrum.

Any thoughts or something I missed?

Bolting to the outside is greatly preferred because 1) 2' extra of yard, which I would really like to have, and I think would be nice when we sell our house in a few years. and 2) all the drain rock behind the wall I imagine would be a huge pain to dig out to the depth I need to bolt the posts. Plus if I ever need to replace the posts, it would be a lot easier from the exposed side. Do my equations add up do you think? I think the core drilled hole would be my second best option perhaps, if you don't think the bolting to outside of blocks would hold up.

Last edited by rjschwar; 04-29-2010 at 07:23 PM. Reason: Last paragraph added for kwikfishron's last post.
rjschwar is offline   Reply With Quote
Old 04-29-2010, 07:29 PM   #11
Member
 
concretemasonry's Avatar
 
Join Date: Oct 2006
Location: Minneapolis/St. Paul, Minnesota - Latitude 45.057 Longitude -93.074
Posts: 3,823
Rewards Points: 2,134
Default

Fence Post on Concrete


Keep in mind that the Ecology Blocks (Mafia Block) are a gravity wall with not connection between the units except the sloop joint/recess. Because of this, you can expect some small movement that you do not get with a rigid concrete wall. Evewn though the movement is small, it can be cumulative and the streeses can cause problems with connections thatv are expected to be firm or rigid.

Dick
concretemasonry is offline   Reply With Quote
Old 04-29-2010, 07:29 PM   #12
Old School
 
Willie T's Avatar
 
Join Date: Jan 2009
Location: St. Petersburg, FL Minds of moderate caliber ordinarily condemn everything which is beyond them.
Posts: 3,634
Rewards Points: 2,000
Default

Fence Post on Concrete


I'd probably bolt to the inside since core drilling might run $100 per hole. (Don't know)

One thing to keep in mind is that there COULD be considerably more force exerted on those posts than you might think when the wind comes whistling from the backfilled side of the wall in a storm. It could possible tip the upper row of blocks when the fence acts as a sail. Pretty doubtful, though..... although I once saw a small motel (one story, about 6 or 8 rooms) blown over to about 20 or 30 degrees in a hurricane, foundation still attached.

If the wind blew the other way, it might not be as much of a problem.
__________________
"True eloquence consists in saying all that is necessary, and only that which is."
François Duc de La Rochefoucauld
Willie T

Last edited by Willie T; 04-29-2010 at 07:41 PM.
Willie T is offline   Reply With Quote
Old 04-29-2010, 07:47 PM   #13
Member
 
Join Date: Nov 2009
Posts: 83
Rewards Points: 75
Default

Fence Post on Concrete


I'm not too worried about the wall tipping over. It is in the back yard, so the house would provide some wind block in big storms. My neighbor has a fence on top of like 8"x17" stackable retaining wall blocks, that appear to have a hole drilled through them so that one of the simpson strong-tie things (from the second link above which appear to be the weakest option) can sit in them, and then refilled w/ concrete or something. That hasn't had any issues.

In terms of the blocks moving, that is possible that they will move a bit, but it seems to me that the fence boards would also provide a bit of flex to accommodate any movement. Each post will only be bolted to a single block. It seems like if anything is going to move, the fence sections between posts would act somewhat to absorb it.

That would be pretty amazing to see w/ the motel. I live in Seattle, and we don't get any wind near hurricane force.

Last edited by rjschwar; 04-29-2010 at 07:49 PM.
rjschwar is offline   Reply With Quote
Old 04-29-2010, 08:05 PM   #14
Member
 
Join Date: Nov 2009
Location: central virginia mountains
Posts: 1,857
Rewards Points: 1,000
Default

Fence Post on Concrete


drill holes in the block, cement in a lag bolt with hydraulic cement with the lag part sticking up 4-6" or more, drill center hole in post and thread on to lag
__________________
The older I get the better I was
tpolk is offline   Reply With Quote
Old 04-30-2010, 02:02 PM   #15
Member
 
Join Date: Nov 2009
Posts: 83
Rewards Points: 75
Default

Fence Post on Concrete


I think what I will do is put 2 3/4" x 10" wedge anchors per post. This seems to be the cheapest, easiest method, and will give me the most yard.

If I put anchors at 6" below the top, and 17" below the top, that would be 7" and 18" from the bottom, fulcrum point. The tension in the lowest psi concrete listed, 2000 psi at the minimum embedded depth of 3 3/8 is 8740lbs. I think this is ultimate tension so if I take 1/4 of that, I get 2185. So say 2000lbs. gives me 2000(18+7) = x * 108 (inches of 9' pole, 6' fence 1' dirt 2' below ecology block) and that gives me 462 lbs at the top of the fence, or if I assume the force from wind is middle of the fence, 72" above fulcrum, that gives 694 lbs.

I can sink them in about 4-5", giving me 5-6 inches hanging out, and once the 4x4 is on, 1-2" for the bolt. This will give even more strength.

By my calculation, if we somehow were to get even 75 mph wind, the force would be 75^2*.00256 = 14.4 lbs/ft^2, or 518.4 per 36ft^2 panel of fence, thus those two anchors should be plenty.

Advertisement

rjschwar is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Wood Fence with metal post BDestroyer8418 Building & Construction 8 09-24-2011 10:49 PM
Wood Fence Post through Driveway shofnerd Landscaping & Lawn Care 10 02-21-2011 12:20 AM
Making Fence Post Holes In Concrete jte1130 Building & Construction 2 09-21-2009 08:07 PM
concrete and fence posts rick32 General DIY Discussions 10 05-31-2009 04:56 AM
Concrete curing in post holes moneymgmt Building & Construction 5 11-19-2008 11:01 AM




Top of Page | View New Posts