Deck Code Violation -or Not?


I guess I should start by saying why am I not surprised...

I have begun working on a design to expand our homes existing deck. So I started reading our forum. I found the attached document from the AWC. Reading this I now am worried whether the existing deck is in violation and if I try and add on will I be forced to do it over?

On page 8 it shows a diagram of "Prohibited Post to Beam Condition," well I have that two 2 x 10's attached to a 6x6 and to make matters worse I only have one bolt. So does diagram indicate all types like this are prohibited or just with two screws. wishful thinking

If there is no permit on file could a code inspector force me to dig up footers to verify they are done right? This deck was probably done between 2002 and 2005.

Assuming this is a fail scenario can I try and rescue by lowering deck equivalent of one step, or is since the attachment to the house is at this level I'm up a river without a paddle?

Advertisement

__________________
--Chris the DIY Guy

Master Bath, still going...

Last edited by ChrisDIY; 06-17-2011 at 02:40 PM.
ChrisDIY is offline   Reply With Quote
Old 06-13-2011, 08:08 PM   #2
Still going...
 
ChrisDIY's Avatar
 
Join Date: Feb 2010
Location: Indianapolis Area
Posts: 985
Rewards Points: 500
Blog Entries: 19
Default

Deck Code Violation -or Not?


Can't get file to attach will link shortly

Advertisement

__________________
--Chris the DIY Guy

Master Bath, still going...
ChrisDIY is offline   Reply With Quote
Old 06-13-2011, 08:22 PM   #3
Framing Contractor
 
Join Date: Apr 2006
Location: Caldwell, NJ
Posts: 1,758
Rewards Points: 1,000
Default

Deck Code Violation -or Not?


Quote:
Originally Posted by ChrisDIY View Post
I guess I should start by saying why am I not surprised...

I have begun working on a design to expand our homes existing deck. So I started reading our forum. I found the attached document from the AWC. Reading this I now am worried whether the existing deck is in violation and if I try and add on will I be forced to do it over?

On page 8 it shows a diagram of "Prohibited Post to Beam Condition," well I have that two 2 x 10's attached to a 6x6 and to make matters worse I only have one bolt. So does diagram indicate all types like this are prohibited or just with two screws. wishful thinking

If there is no permit on file could a code inspector force me to dig up footers to verify they are done right? This deck was probably done between 2002 and 2005.

Assuming this is a fail scenario can I try and rescue by lowering deck equivalent of one step, or is since the attachment to the house is at this level I'm up a river without a paddle?
You need to talk to your inspector anyway for the new deck, so why not just call and ask your questions there?
__________________
Joe Carola
Joe Carola is offline   Reply With Quote
Old 06-13-2011, 08:32 PM   #4
Member
 
Join Date: Mar 2007
Location: Long Island, NY
Posts: 9,519
Rewards Points: 2,000
Default

Deck Code Violation -or Not?


Didn't this(unpermitted work) come up when you bought the house? Your lawyer should have been all over this.
__________________
Ron
"They that can give up essential liberty to obtain a little temporary safety deserve neither liberty nor safety."
B. Franklin 1759
Ron6519 is offline   Reply With Quote
Old 06-13-2011, 09:22 PM   #5
Still going...
 
ChrisDIY's Avatar
 
Join Date: Feb 2010
Location: Indianapolis Area
Posts: 985
Rewards Points: 500
Blog Entries: 19
Default

Deck Code Violation -or Not?


Had a home inspector look at home. Was not in the list of problems. House was a foreclosure so knew I'd have to accept some remodeling.

Maybe my view of code inspectors isn't right. Being from Chicago, I just fear being fined until the situation is remedied.

Here is the reference:

http://www.awc.org/Publications/DCA/DCA6/DCA6-09.pdf

Quote:
Originally Posted by Ron6519 View Post
Didn't this(unpermitted work) come up when you bought the house? Your lawyer should have been all over this.
Bank had to fix a lot of stuff identified by the home inspector this wasn't one fo them. Not to mention things I have found behind walls.
__________________
--Chris the DIY Guy

Master Bath, still going...

Last edited by ChrisDIY; 06-13-2011 at 09:25 PM.
ChrisDIY is offline   Reply With Quote
Old 06-13-2011, 10:57 PM   #6
Member
 
Join Date: Dec 2009
Location: Long Island, NY
Posts: 183
Rewards Points: 150
Default

Deck Code Violation -or Not?


You need to draw preliminary "as built" plans for the existing deck. Determine the diameter of the piers and use a post hole digger or a shovel to dig down on one side of at least two piers to determine their depth below grade. Draw up preliminary plans for the deck addition and head down to the Building Dept. and speak with the plans examiner or building inspector. Photos are always helpful. I say preliminary plans unless you know that the Building Dept. will accept plans drawn by a homeowner or if the plans are required to be sealed and signed by a "design professional", e.g. registered architect or professional engineer. The Building Dept. can determine if the existing deck is in compliance and, if not, what you need to do to correct the deficencies. Be sure to take a copy of your survey with you. They will also address zoning issues if your community has any, e.g. set back from lot lines and percentage of lot coverage. The sooner you correct a problem the easier it is to correct. good luck.
TheCamper is offline   Reply With Quote
Old 06-14-2011, 09:57 AM   #7
Still going...
 
ChrisDIY's Avatar
 
Join Date: Feb 2010
Location: Indianapolis Area
Posts: 985
Rewards Points: 500
Blog Entries: 19
Default

Deck Code Violation -or Not?


Quote:
Originally Posted by TheCamper View Post
You need to draw preliminary "as built" plans for the existing deck. Determine the diameter...

... from lot lines and percentage of lot coverage. The sooner you correct a problem the easier it is to correct. good luck.
The county will give me two years on the permit to remedy any violations in the current deck along with the addition. So now I need to determine how to fix this? I'd prefer to go into the county with a "compliant" solution as opposed to having them tell me their solution.

I am going to want to leave the existing ledger board in place so if the single bolts are at a consistent height from the top of the post and at least 2" down can I notch the existing posts and install new joists? If not am I forced to at least lower deck to the height of one or more steps? Will I then have to lower/replace ledger board or can I make a really wide single step?

http://www.diychatroom.com/attachmen...h-100_2676.jpg

Current deck is 10' x 15' with the ledger board being on the 10' side.

I am going to have to post a few more pictures.
__________________
--Chris the DIY Guy

Master Bath, still going...

Last edited by ChrisDIY; 06-14-2011 at 10:14 AM.
ChrisDIY is offline   Reply With Quote
Old 06-14-2011, 10:37 AM   #8
Still going...
 
ChrisDIY's Avatar
 
Join Date: Feb 2010
Location: Indianapolis Area
Posts: 985
Rewards Points: 500
Blog Entries: 19
Default

Deck Code Violation -or Not?


Deck from above.
Attached Thumbnails
Deck Code Violation -or Not?-google-deck.jpg  
__________________
--Chris the DIY Guy

Master Bath, still going...
ChrisDIY is offline   Reply With Quote
Old 06-14-2011, 05:52 PM   #9
Custom Home Builder
 
Join Date: May 2011
Location: Ship Bottom (Long Beach Island), NJ
Posts: 95
Rewards Points: 75
Default

Deck Code Violation -or Not?


Quote:
Originally Posted by ChrisDIY View Post
Deck from above.
Can't find you on Dish Earth.
thomasjmarino is offline   Reply With Quote
Old 06-15-2011, 05:52 PM   #10
Still going...
 
ChrisDIY's Avatar
 
Join Date: Feb 2010
Location: Indianapolis Area
Posts: 985
Rewards Points: 500
Blog Entries: 19
Default

Deck Code Violation -or Not?


Well, went outside to look at it closer and it gets worse. Turns out there are no bolts instead they are cut off threaded rods. They are drilled at least 4" down from the top of the current joist. However, post are 4" taller than the top of the joists.
__________________
--Chris the DIY Guy

Master Bath, still going...
ChrisDIY is offline   Reply With Quote
Old 06-15-2011, 09:05 PM   #11
Member
 
Join Date: Dec 2009
Location: Long Island, NY
Posts: 183
Rewards Points: 150
Default

Deck Code Violation -or Not?


I thought I posted a reply last evening but I do not see it so I wonder what I did wrong or where it is. Here goes again. As long as the ledger is lag bolted or through bolted to the rim board (box beam) of the house then the ledger can stay as far as structure, just make sure it is properly bolted both in the upper and lower portions of the board. With the girder you can drill through the 2 X 10, 6 X 6 and 2 X 10 and add one or two more carriage bolts to each post but for this design your county may require the seal and signature of a design professional. I am pretty simple, I like the load to bear directly over a structural member that way you know the dead and live loads are transferred down. I suggest you consider support the joists temporarily, remove the girder and cut the posts; using the proper metal connecter install a new girder, toe nail the joists to the girder and use metal clips as well. This will place the girder directly over the posts. I assume for the 15' span you have two girders. The other option is to construct another girder a comfortable working distance from the existing girder. Working under the deck to dig new piers could be tough but the carpentry should go well. Make sure that you use the proper type of nails and metal connectors; e.g. double zinc or stainless steel. Many metals corrode rather quickly when in contact with treated lumber. I've used stainless since CCA left the market. If you wish to lower the deck check with your local codes to see if you can have a step outside of the door or if a platform is required; a step being about 10" - 12" deep where a platform is likely to be required to be at least 36" deep. If you lower the deck you may have to reconstruct your stair, remember the risers must all be the same. The tolerance between the greatest rise and lowest rise is likely permitted to be no greater then 3/8". check with your county. Also, closed risers are required by most codes. Often decks constructed without the benefit of a building permit are deficient at the piers, the post to pier connection, guards, railings and stairs. Post a couple of more photos and I am sure someone will comment. good luck.
TheCamper is offline   Reply With Quote
Old 06-16-2011, 10:29 PM   #12
Still going...
 
ChrisDIY's Avatar
 
Join Date: Feb 2010
Location: Indianapolis Area
Posts: 985
Rewards Points: 500
Blog Entries: 19
Default

Deck Code Violation -or Not?


Close up of post beam attachment.
Attached Thumbnails
Deck Code Violation -or Not?-img_3872.jpg  
__________________
--Chris the DIY Guy

Master Bath, still going...
ChrisDIY is offline   Reply With Quote
Old 06-16-2011, 10:33 PM   #13
Still going...
 
ChrisDIY's Avatar
 
Join Date: Feb 2010
Location: Indianapolis Area
Posts: 985
Rewards Points: 500
Blog Entries: 19
Default

Deck Code Violation -or Not?


Various views of deck. I know its a code violation, so need more help on fixing it. Thanks "TheCamper"
Attached Thumbnails
Deck Code Violation -or Not?-img_3873.jpg   Deck Code Violation -or Not?-img_3874.jpg   Deck Code Violation -or Not?-img_3877.jpg   Deck Code Violation -or Not?-img_3878.jpg   Deck Code Violation -or Not?-img_3879.jpg  

__________________
--Chris the DIY Guy

Master Bath, still going...
ChrisDIY is offline   Reply With Quote
Old 06-16-2011, 10:43 PM   #14
Still going...
 
ChrisDIY's Avatar
 
Join Date: Feb 2010
Location: Indianapolis Area
Posts: 985
Rewards Points: 500
Blog Entries: 19
Default

Deck Code Violation -or Not?


This deck is attached to the house and has twelve 6 by posts. I guess since its up in the air makes it look gangly.

Initial thought is to make a platform to the second row of posts and lower the remaining deck and enlarge it.
__________________
--Chris the DIY Guy

Master Bath, still going...
ChrisDIY is offline   Reply With Quote
Old 07-04-2011, 11:48 PM   #15
Still going...
 
ChrisDIY's Avatar
 
Join Date: Feb 2010
Location: Indianapolis Area
Posts: 985
Rewards Points: 500
Blog Entries: 19
Default

Deck Code Violation -or Not?


Ok, Ok, now I am confused. I just saw a newly professionally built sunroom, municipality inspected (not my county though), supported on one end by a ledger board and the other by three 6 x 6 posts utilizing the "prohibited post connection." So is this or not a prohibited connection? Sunroom I would describe as very nice enclosed 3 season screened porch on top of a deck.

Advertisement

__________________
--Chris the DIY Guy

Master Bath, still going...
ChrisDIY is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Deck Power Washed...now many days of rain before stain! mark2741 Painting 67 09-27-2013 07:32 PM
Deck stain project gone bad - HELP brownnl Painting 13 03-15-2011 02:57 PM
Fasten deck board from under deck resonator Carpentry 14 09-20-2010 11:15 AM
Patio Around an Existing Deck tonyg Landscaping & Lawn Care 1 09-10-2009 07:57 PM
code violation? krw1957 Electrical 6 12-11-2007 07:16 AM




Top of Page | View New Posts