Our townhouse experienced significant damage to the framing in the crawl space due to water infiltration. We spent the last two years investigating where the water was coming from and believe we have done all that can be done to eliminate the sources. With that resolved we moved on to rebuilding the foundation and framing in the crawl space.

We were in the process of replacing some rotted floor joists and decided to replace the entire support structure for the landing after seeing the extent of the rot and poor condition of the piers.

I have some questions regarding how much end bearing is required for the ends of joists and beams and the best method of terminating a beam at a CMU wall.

Regarding end bearing for joist and beams. I found the following in Principles of Home Inspection: Systems & Standards.

Joists require 1 1/2 inches of end bearing, considerably less than the 3 1/2 inches required for beams. That's because the live load carried by individual joists is much smaller than the beam's load. Note: Some jurisdictions call for 3 inch end bearing on masonry. Check standard practices in your area.

Where joists rest on beams, best practice is to have the joist rest on the full width of the beam, rather than just 1 1/2 inches. Good practice also includes splicing joists that overlap from opposite side of the beam.


Based on the above I believe I should go with the following:

ORIGINAL FRAMING Only 1 of joist bear directly on 4x6 beam.



Photo below show typical condition of the original joists after I removed the rim joist.




PROPOSED REVISED FRAMING 3-1/2 of joist bare directly on 4x6 beam.



Last week we poured new footings and pilasters for the posts that will support the middle of the new 4x6 beam and floor joist. The new 4x6 beam will replace the existing 4x6 beam and plywood shown in the original framing drawing above.



I would like to support one end of the 4x6 bean with a Simpson HU46 hangar nailed to the 6x6 beam that replaced the rotted triple 2x6s. This will leave a gap between the new 4x6 beam and an existing 4x6 beam below.



The other end of the 4x6 terminates at a CMU wall. Currently it bears 1 on a pressure treated 2x6 secured to the CMU wall with corroded pins and washers.



I believe I have three options that meet code.

1. Remove the current pressure treated 2x6 ledger and secure the end of the new 4x6 beam in a Simpson HU46 secured to the CMU wall with Simpson Titen screws.



2. Remove the current pressure treated 2x6 and replace with another pressure treated 2x6 that is located 5-1/2 higher and secured to the CMU wall with expoxied 5/8 bolts, washers and nuts. The new 4x6 beam would be secured in a Simpson HU46 secured to the new pressure treated 2x6 with 1-1/2, 9 gauge, HDG nails



3. Remove the current pressure treated 2x6 and replace with a pressure treated 4x6 secured to the CMU wall with expoxied 5/8 bolts, washers and nuts. This will allow the 3-1/2 of the new beam to bear completely on the new 4x6 ledger as recommended in Principles of Home Inspection.

Comments appreciated.

Fire4Effect is offline   Reply With Quote
Old 06-22-2009, 04:30 PM   #2
Member
 
Join Date: Jan 2009
Location: South of Boston, MA
Posts: 17,248
Rewards Points: 2,000
Default

Crawl Space Beam and Joist Support Questions


Why not direct support all the way down under that 4x12 ?

Scuba_Dave is offline   Reply With Quote
Old 06-22-2009, 04:51 PM   #3
Member
 
Join Date: Jul 2007
Posts: 1,643
Rewards Points: 1,106
Default

Crawl Space Beam and Joist Support Questions


It looks like you are doing your homework and doing good work. Option 1 makes the most sense to me.
jogr is offline   Reply With Quote
Old 06-22-2009, 05:27 PM   #4
Member
 
Join Date: Jul 2008
Posts: 63
Rewards Points: 75
Default

Crawl Space Beam and Joist Support Questions


Quote:
Originally Posted by Scuba_Dave View Post
Why not direct support all the way down under that 4x12 ?
We did not want to move the location of the footings and beam from their original location. It is my understanding you are permitted to cantilever the load path 5-1/2 on a 2x6. We are only cantilevering 2-1/2. In addition, there is a very light load on the 4x12.
Fire4Effect is offline   Reply With Quote
Old 06-22-2009, 05:39 PM   #5
Member
 
Join Date: Jul 2008
Posts: 63
Rewards Points: 75
Default

Crawl Space Beam and Joist Support Questions


Quote:
Originally Posted by jogr View Post
It looks like you are doing your homework and doing good work. Option 1 makes the most sense to me.
Thanks. That's one vote for Option #1.
Fire4Effect is offline   Reply With Quote
Old 06-28-2009, 01:07 PM   #6
Member
 
Join Date: Jul 2008
Posts: 63
Rewards Points: 75
Default

Crawl Space Beam and Joist Support Questions


I talked with a structural engineer yesterday and he said any of the options above for the attachment of a beam to a CMU wall are acceptable. Based on some efflorescence on the CMU wall I am hesitant to use Option #1. Since we are in a seismic area I am hesitant to use Option #2. Im not comfortable with the 1-1/2 10D nails if things start moving around. I think I will go with Option #3. The structural engineer suggested using 3x6 ledger instead of 4x6 ledger as another option, but I see the Simpson BC4 he suggested for the 4x6 ledger will not work with the 3X6 ledger. I will ask him if I can use Simpson A34 ties if I use the 3x6 ledger.



He also said the revised framing is acceptable, but he wants me to add blocking under the 4x12.

Thank you to everyone who responded.

Fire4Effect is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
OSB Stronger than Plywood? Weathermaker01 Flooring 15 12-22-2012 09:06 AM
Ceiling joists support beam ptcamaro Building & Construction 3 06-17-2009 10:14 AM
Installing LVL in current joist space Southpaw Building & Construction 7 11-20-2008 03:16 PM
i beam in basement, notched joist component Building & Construction 1 03-18-2008 01:47 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.