Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > Building & Construction

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Search this Thread Display Modes
Old 02-05-2013, 09:45 AM   #1
Newbie
 
Join Date: May 2012
Posts: 5
Rewards Points: 10
Arrow

Couple of Questions about Installing Drop Ceiling Grid


1) Where the grid pieces hit the wall brackets, should I bend back the interlocking tabs?

2) To attach the grid pieces to the wall brackets, every tutorial mentions riveting them together. I bought a hand riveter but this seems cumbersome and time consuming as I have to drill holes (I don't have a grid punch). Also, rivets seem permanent, so if I make a mistake there's no going back. Is there an easier way to securely attach the grid to the wall brackets?

As you can tell, this is my first time doing this. Thanks!

fiveomar is offline   Reply With Quote
Old 02-05-2013, 10:05 AM   #2
Member
 
Join Date: Dec 2011
Location: Michigan
Posts: 843
Rewards Points: 500
Default

Couple of Questions about Installing Drop Ceiling Grid


I have a grid punch to make holes in wall rails. I did not bend any tabs.
I just looked up in two rooms, I did not use any rivets.
The panels will hold the grid rails in place.
I used one rivet in an outside corner of the Chimney!


Last edited by Hardway; 02-05-2013 at 10:08 AM.
Hardway is offline   Reply With Quote
Old 02-05-2013, 10:07 AM   #3
Mold!! Let's kill it!
 
Join Date: Feb 2008
Location: Central Pennsylvania
Posts: 2,849
Rewards Points: 2,012
Default

Couple of Questions about Installing Drop Ceiling Grid


First you need to decide which direction your main tees are going to run and then cut them so that they are centered in the wall angles. Your cross tee locations will determine how much to cut off of each end in order to be centered. Depending on the size of the room, you may want a main tee in the center or a tile in the center. Best thing is to draw this ceiling on paper and decide where cross tees and mains should fall before you cut. Some areas require attaching tees to wall angles for siesmic reasons. After you have the ceiling grid in place and most of the tiles dropped in, you can go back and make those attachments.
If you've cut your lengths correctly, the tees should not fall out of the wall angles after the tiles are dropped in. Any lights that you drop into the grid need to be suspended from their own tie wires.
Maintenance 6 is offline   Reply With Quote
Old 02-05-2013, 10:42 AM   #4
Member
 
Join Date: Sep 2011
Location: western Ny
Posts: 1,247
Rewards Points: 508
Default

Couple of Questions about Installing Drop Ceiling Grid


I rarely rivet the tracks at the walls. When I do though, I do it after I have all of the field tiles in place and the grid all squared up. Then I will rivet one or two along each wall. I rarely do this though.
danpik is online now   Reply With Quote
Old 02-05-2013, 07:18 PM   #5
Newbie
 
Join Date: May 2012
Posts: 5
Rewards Points: 10
Default

Couple of Questions about Installing Drop Ceiling Grid


Thanks, good info!
fiveomar is offline   Reply With Quote
Old 02-05-2013, 08:01 PM   #6
Handyman
 
brucem609's Avatar
 
Join Date: Feb 2013
Location: South Jersey
Posts: 76
Rewards Points: 75
Default

Couple of Questions about Installing Drop Ceiling Grid


I generally use pop rivets and only rivet in the mains. This wa you will always have a secure position. But once again ONLY afterimage the panels in
brucem609 is offline   Reply With Quote
Old 02-06-2013, 03:39 PM   #7
retired union carpenter
 
Join Date: Nov 2011
Location: PA
Posts: 323
Rewards Points: 250
Send a message via Yahoo to coupe
Default

Couple of Questions about Installing Drop Ceiling Grid


I have done thousands of square feet of drop ceilings. including, 7 super walmart stores, 12 W.L. Gore plants, 27 floors of Hyatt Regency hotel in Nashville,Tn., 6 Big K-marts, and 5- 3 story Kohl stores. I don't like the looks of rivets, do have a Whitney punch.

I prefer, to use lighter gauge tie wire to hold grid in place. I like my grid cut no more than 1/4" from walls on both sides and ends, allows for expansion/contraction. I find grid, laying on edge of wall channel, the weight if tile will turn channel downward showing gaps in framing. I use fence staples driven above ceiling height, and 27 gauge wire to tie the ends of mains tight at straight using a laser. strings will keep straight but sag for level.

as for cutting off the tabs, I've never ran into that. or simply changed layout to prevent it from happening.

good luck

__________________
as always, just my thoughts
good luck....coupe/Larry
take what helps? ignore the rest.
coupe is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Want to raise my ceiling and have insulation questions rjm102478 Roofing/Siding 7 02-01-2013 03:14 PM
Replacing Basement Drop Ceiling w/Drywall sadic1 Remodeling 17 03-18-2012 10:23 AM
Installing Drywall Ceiling daytrepper Drywall & Plaster 10 02-10-2011 12:52 AM
Installing ceiling trim with uneven ceiling. capslock Carpentry 3 03-20-2010 11:53 PM
couple questions about installing phone jacks joeyboy Electrical 31 10-09-2007 02:26 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.