Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > Building & Construction

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Search this Thread Display Modes
Old 10-30-2005, 02:48 PM   #1
Member
 
Join Date: Nov 2004
Posts: 160
Rewards Points: 150
Default

Contractors please:framing moved during demo?


My mom recently had the 15 x 10 plaster ceiling in her kitchen removed after years of continuous water damage from (2) bathrooms above. She also removed the tile floors and 'mud mat' sub flooring from the two bathrooms above as well as a cast iron tub. She's yet to replace the ceiling/flooring.
Mom reports that her bathroom doors no longer close properly; that they're slightly racked. Could "unloading" the ceiling/floor joists have caused the framing to move? Her house was built in the 40's from rough hewn, seasoned mixed hardwoods, has plaster walls and ceilings throughout and has hardwood floors over hardwood plank subfloor throughout.
She's concerned that she needs to re-load the joists with similar weight. I told her to plane the doors when she was done with the remodel. What say ye?

pipeguy is offline   Reply With Quote
Old 10-30-2005, 07:59 PM   #2
Member
 
Join Date: Aug 2005
Posts: 253
Rewards Points: 250
Default

Contractors please:framing moved during demo?


I vote fix the door when your done. I think a bunch of guys with crowbars probably knocked the doors out of wack. They'll probably get knocked a few more times before your done. HS

K2eoj is offline   Reply With Quote
Old 10-31-2005, 07:12 AM   #3
aka:awesomedell
 
Join Date: Mar 2005
Location: North Central Missouri
Posts: 206
Rewards Points: 150
Send a message via MSN to housedocs
Default

Contractors please:framing moved during demo?


I agree with Hammer, but I think it wouldn't hurt to take a 4' level upstairs and check the level and plumb on the floors and door jambs. Good luck.
__________________
All you need is ignorance and confidence and success is assured. - Mark Twain
housedocs is offline   Reply With Quote
Old 10-31-2005, 07:40 AM   #4
Member
 
Join Date: Nov 2004
Posts: 160
Rewards Points: 150
Default

Contractors please:framing moved during demo?


Thanx for the replies. She's all worried that she should hang a double layer of new drywall kitchen ceiling and put in a new cast-iron tub to make the post re-model framing load similar to that of the original. Fixing the doors is a much more doable solution.
pipeguy is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Choosing a contractor Grumpy Remodeling 7 04-28-2011 07:29 AM
Trustworthy Contractors? klum00 Remodeling 15 07-09-2007 06:22 PM
General contractors license. raymond_anthony Building & Construction 5 08-20-2006 04:07 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.