concrete floor


I had a concrete floor poured for my garage and cracked the next day and continues to crack. The footings are 24 wide 27 deep, base was 4" of compacked sand #4 rebar 24 oc. I could fine nothing wrong with preperation. they use large rock with fiber added. The weather was about 72 degee. I kept it damp for 5 days. The contractor wanted to cut control joints the nex day. But I didn't want them I wanted a smooth floor it was crack the next day anyway. When I showed the contractor the problem he had no explanation for the cracking and suggest he could cut some control joints in and that might help.I think something is wrong with the mix. What do you think?

Granpa is offline   Reply With Quote
Old 05-17-2011, 11:38 AM   #2
Member
 
Join Date: Mar 2011
Location: Western suburbs, Chicago, Il.
Posts: 2,670
Rewards Points: 2,018
Default

concrete floor


Were you there when they poured it?
Lots of water?
Cracked the next day!?!?
Holy Moly!!
Get pictures! (You might need them - if it's cracked already -Ouch!)

rossfingal

By the way - wait for the concrete experts to see this - hope they know how to use jack-hammers.


Last edited by rossfingal; 05-17-2011 at 11:43 AM.
rossfingal is online now   Reply With Quote
Old 05-17-2011, 05:41 PM   #3
Member
 
Join Date: Jun 2009
Location: atl & hilton head
Posts: 3,310
Rewards Points: 2,202
Default

concrete floor


control/contraction joints should always be diamond sawed as soon as possible to prevent random cracking,,, when sawing, the current spec calls for thickness ./. 3 OR 1.3" deep if its a 4" thick floor,,, despite what you were told, fibre won't help much to control random cracking,,, i'd guess your only hope to save it now is full-depth sawing of a proper joint pattern.

why sand & not compacted fill as sand shifts ? gravel / graded aggregate base / nys dot item #4 is always recommended but never sand,,, if a 4" floor, 1 1/2" rock may be too large,,, rebar adds flexural but NOT compressive strength,,, conc likes to be square which's why we saw it,,, you shouldda listened to your contractor & let him saw,,, personally i wouldn't use fiber or wire mesh in 4" but that's often argued,,, as i recall, aci sez any steel/mesh's gotta be at the vertical midpoint +/- 5% which, in a 4" slab, is .2",,, by the time the jabonies finish tramping back& forth, guess what those odds are.

who designed this job ? your contractor SHOULD know why the cracks occurred - the joints should've been cut when the conc needed them - NOT when the owner sez,,, the next day is often too late.

Last edited by stadry; 05-17-2011 at 05:50 PM.
stadry is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Concrete stain on painted sloped floor ur_real_dad_21 Flooring 4 01-09-2009 11:38 AM
Carpet in the basement Packer Backer Flooring 16 11-03-2008 11:19 PM
cold concrete floor RuthP Flooring 4 02-03-2008 10:13 PM
Concrete deck -- rotting floor joists jwill Building & Construction 6 09-05-2007 08:01 AM
new concrete floor next to old concrete floor mattroos Building & Construction 10 08-28-2007 01:32 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.