DIY Chatroom -  DIY Home Improvement Forum
    DIY Forum     DIY Blogs     Photos     Woodworking     Extreme How To     Advertise     Contact Us  
Go Back   DIY Chatroom - DIY Home Improvement Forum > Home Improvement > Building & Construction


CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Reply
 
Thread Tools Search this Thread Display Modes
Old 07-28-2009, 05:26 PM   #1
Member
 
Join Date: Dec 2007
Posts: 122
Default Can a joist be cut to make more headroom?

I was wondering if there is any way to cut off 3 to 4 inches off of a joist in the basement and reinforce it with some sort of framing? Im installing a bathroom and will have to raise the tub 8 inches. If it were possible to cut the joists above the tub the extra inches would be priceless. Basically, the idea would be to cut off 5'x3" or 5'x4' strips off of 3 joists.

Leoskee is offline   Reply With Quote
Join DIYChatroom.com

Join the #1 DIY Forum Today - It's Totally Free!

DIYChatroom.com - Are you about to start a new home improvement task and need some help? Do you need advise on what products to buy? Or maybe you can give others some advice? No matter where you fit in you'll find that DIY Chatroom is a great community to join. Best of all it's totally free.

Join DIYChatroom.com - Click Here
JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. DIYChatroom.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any home improvement task!
Old 07-28-2009, 05:27 PM   #2
Extreme DIY Homeowner
 
Scuba_Dave's Avatar
 
Join Date: Jan 2009
Location: Rockland, MA
Posts: 5,807
Default

What size are the joists?
What is above that they are supporting?
__________________
DIY Chatroom Moderator
Not a Pro or for hire, I have enough to do on my own house, Just Look !!
http://www.diychatroom.com/f49/house-renovation-ongoing-37438/
Scuba_Dave is online now   Reply With Quote
Old 07-28-2009, 05:50 PM   #3
Member
 
Join Date: Mar 2007
Location: Long Island, NY
Posts: 2,899
Default

Quote:
Originally Posted by Leoskee View Post
I was wondering if there is any way to cut off 3 to 4 inches off of a joist in the basement and reinforce it with some sort of framing? Im installing a bathroom and will have to raise the tub 8 inches. If it were possible to cut the joists above the tub the extra inches would be priceless. Basically, the idea would be to cut off 5'x3" or 5'x4' strips off of 3 joists.
I would be interested why you need to raise the tub 8". That doesn't seem to be the best way of doing the job.
Cutting the joists are a no, no. They're sized and installed that way for a reason.
Ron
Ron6519 is offline   Reply With Quote
Old 07-28-2009, 08:54 PM   #4
Member
 
Join Date: Dec 2007
Posts: 122
Default

I have to raise the tub 8 inches because my sewer line is above ground. I will be using a maserating toilet unit (sanibest) and need to raise the tub in order to gravity feed into the unit.

As far as the joists are concerned, I understand their purpose and function. But at the same time I am wondering if there is any way to create additional support around them that is less than 8 inches.

The area that I am talking about is directly underneath my dining room. The joists are 8x2 and come directly off of the main support beam that runs down the middle of the house and extend to the perimiter support beam.
Leoskee is offline   Reply With Quote
Old 07-28-2009, 09:01 PM   #5
Extreme DIY Homeowner
 
Scuba_Dave's Avatar
 
Join Date: Jan 2009
Location: Rockland, MA
Posts: 5,807
Default

A 2x8 joist is 7.5", taking 3-4" off would reduce it to a 2x4
That would severely reduce its load carrying capacity
You could use steel to reinforce these
But would probably have to be engineered

How far do the 2x8 joists span?
Are they 16" on center?
Only a floor above these - not a wall?
A 2x4 can only span around 5' 8" depending upon the wood
__________________
DIY Chatroom Moderator
Not a Pro or for hire, I have enough to do on my own house, Just Look !!
http://www.diychatroom.com/f49/house-renovation-ongoing-37438/
Scuba_Dave is online now   Reply With Quote
Old 07-28-2009, 09:36 PM   #6
011000100110111101101111
 
DangerMouse's Avatar
 
Join Date: Jul 2008
Location: SW Michigan
Posts: 3,525
Default

if the bathroom is only to be used by the mother-in-law......

DM
__________________
Magical, Musical, Mysterious FUN!
http://www.youtube.com/user/MickeySoume
Now Featuring: Mickey's Multi-Talented Mutts!
DangerMouse is online now   Reply With Quote
Old 07-28-2009, 09:44 PM   #7
Member
 
Join Date: Dec 2007
Posts: 122
Default

They are 16" on center and they span 22'. The basement is a 22' square.

What exactly do you mean by engineered?
Leoskee is offline   Reply With Quote
Old 07-28-2009, 09:55 PM   #8
Extreme DIY Homeowner
 
Scuba_Dave's Avatar
 
Join Date: Jan 2009
Location: Rockland, MA
Posts: 5,807
Default

You would need an engineer to size a steel beam to replace the 2x8 joists
And 22' is a verylarge distance to span with a 2x8
Are you sure there isn't a support beam in there somewhere?
A 2x8 will normally only span around 12'
__________________
DIY Chatroom Moderator
Not a Pro or for hire, I have enough to do on my own house, Just Look !!
http://www.diychatroom.com/f49/house-renovation-ongoing-37438/
Scuba_Dave is online now   Reply With Quote
Old 07-28-2009, 10:02 PM   #9
Licensed Eng/Contractor
 
Aggie67's Avatar
 
Join Date: Dec 2008
Location: New Jersey
Posts: 398
Default

22 foot span? 2x8's? There has to be some missing information.

I have a homework assignment for you:

1. Using a tape measure, measure the exact dimension of the joists, width by height.
2. Walk down there and tell us if it's one big room, or if it's partitioned off into a couple rooms. I'm thinking there has to be a couple columns down there supporting the midpoint of the joists.
Aggie67 is offline   Reply With Quote
Old 07-28-2009, 10:13 PM   #10
We pick these?
 
Join Date: Jun 2009
Location: Indiana, Texas, Florida
Posts: 127
Default

wood I-joists or floor trusses are engineered. You can cut the whole center out of a wood I-joist in most cases, but you can't cut the bottom of it out. If you cut a joist out and the kerf is in the clear span, it will crack or break. There are online span calculators available that you can figure your joist requirement with, but I can tell you that 2x6 is pretty much the smallest for floor joists over. That's 5 1/2" deep. Your basement is overall 22' with a beam over the center, so your span is only 11' on each side. It doesn't look like you can alter your joists, unless you want your family to collapse your floor during dinner one night.

I just paid a plumber to break my concrete floor and run drainage for a new full bath and laundry room and it was WAY too expensive. I think someone with lots of patience and some spare time could do the job in a couple weekends if they had some help. The difference between a macerator and all the gear vs. breaking concrete and doing it the regular way yourself, well the old fashioned way is cheaper. If you pay a plumber to do the drainage, like I did, you probably would come out cheaper with the pump. What about just breaking out enough concrete to get the trap down into the floor, might get you 4" extra?
NailedIt is offline   Reply With Quote
Old 07-28-2009, 10:33 PM   #11
Member
 
Join Date: Dec 2007
Posts: 122
Default

Quote:
Originally Posted by NailedIt View Post
wood I-joists or floor trusses are engineered. You can cut the whole center out of a wood I-joist in most cases, but you can't cut the bottom of it out. If you cut a joist out and the kerf is in the clear span, it will crack or break. There are online span calculators available that you can figure your joist requirement with, but I can tell you that 2x6 is pretty much the smallest for floor joists over. That's 5 1/2" deep. Your basement is overall 22' with a beam over the center, so your span is only 11' on each side. It doesn't look like you can alter your joists, unless you want your family to collapse your floor during dinner one night.

I just paid a plumber to break my concrete floor and run drainage for a new full bath and laundry room and it was WAY too expensive. I think someone with lots of patience and some spare time could do the job in a couple weekends if they had some help. The difference between a macerator and all the gear vs. breaking concrete and doing it the regular way yourself, well the old fashioned way is cheaper. If you pay a plumber to do the drainage, like I did, you probably would come out cheaper with the pump. What about just breaking out enough concrete to get the trap down into the floor, might get you 4" extra?

You did exactly as your name states: You nailed it. There is a support beam that is 5.5x7.5 that the joists rest on. Each joist spans the entire length of the house and they come out about 11' on each side. My house was build in 1924.

I considered breaking up the floor but the quotes I got were way too high. I think I can do what you mentioned as far as breaking out some of the floor directly under the Ptrap. Im just going to have to be very accurate with my measurements. I dont want to have to make a bigger hole than necessary.
Leoskee is offline   Reply With Quote
Reply


More On This Topic

The rafters of a patio overhead serve two main purposes. They're meant to firmly hold the overhead in place, and they're meant to add decoration to your patio. Patio overhead rafters are moderately easy to assemble and install. Read More »

Hi, this is Jon and in this clip we will be installing our fixture box. Now, with the can light that we pulled out, the diameter is about six inches. However, the diameter for our mounting plate is only about four inches. Now, because our opening is so... Read More »

And here we are inside the permanent shanty. You can see that it's roughly of an 8 by 6 foot construction. Make out of luan and 2 x 2's cut from 2 x 4's. It has all the amenities of home but in a much, much cruder fashion. Isn't that right great pumpkin... Read More »

We are going to talk a little bit about the demolition that we had to do to get started with this project. As you can see this wall along here has been exposed. You can see the 2x6 construction. We came in and decided where the new door should be into... Read More »

Cracks in foundation or other concrete structures are normally the result of water seeping in gradually over time or simply the moving and shifting of the concrete from seasonal temperature changes. Although it's common to have leaks in concrete, it's... Read More »

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
floor joist issue drtbk4ever Building & Construction 4 03-22-2009 12:20 PM
Shower drain is directly over a floor joist Sad Plumber Carpentry 4 03-03-2009 06:56 PM
sistering in a plumber whacked joist 4just1don Building & Construction 7 02-04-2009 03:33 PM
Floor Joist damage - bathing my way to disaster? Leah Frances Building & Construction 3 01-28-2008 12:33 AM
Ceiling Joist Worries clayrabbit Building & Construction 11 01-06-2008 07:07 PM

Top of Page | View New Posts


All times are GMT -4. The time now is 04:37 PM.


Powered by vBulletin® Version 3.8.1
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
© 2003 - 2009 The Building Network LLC