basement framing and insulating questions around ledge


Hi,

This is the first posting.
I'm planning to remodel my basement built in 1980's in NJ.
It has 3'8" bottom half, and top half both for cinder block (total 7' only).
This type of basement is very unusual, because normally wood frame will be installed from ground level. Also there is a french drain and sump, too.
I don't have any experiences, so try to learn as much as possible before begin.

The wall is divided by ground level (3'8" down, 3'4" up).
My plan is to insulate the cinder block with 1 inch XPS, and build stud for half wall. And, frame the top half. But there is a ledge at a ground level and it's sloped about 30 degrees.
I draw two possibility of framing around ledge.

a - shown left) use 2x8 as the top plate of half wall and screw it to ledge, but it's sloped. Dunno how difficult it is. 2x8 also serves as the bottom plate of the top half wall.
b - shown right) use 2x4 as the top plate, and cover ledge with 1x4 or 2x4. and use 2x8 for bottom plate of the top half wall. This option gives me of framing and raising it against wall, I guess.

Also I assume, I need to insulate with XPS (or at least better) even for cinder block wall above the ground level. Is this overkill? Can I use some cheaper method of insulation?
Attached Thumbnails
basement framing and insulating questions around ledge-ledge1.jpg  
Attached Images
 

khatz is offline   Reply With Quote
Old 12-29-2011, 12:15 AM   #2
Newbie
 
Join Date: Dec 2011
Posts: 4
Rewards Points: 10
Default

basement framing and insulating questions around ledge


There is a hot water pipe running perpendicular to joist which exactly overlap the top plate should be attached to. (in picture the brown pipe to the ceiling)

It comes down around 1.5", so I'm thinking adding furring board of 2x2 or 2x4 next to hot water pipe, and screw top plate to the furring board.
The problem is the top plate will be attached to the furring board only for the half width, and it becomes L shape. Dunno how stable it would be.
Attached Images
 

khatz is offline   Reply With Quote
Old 12-29-2011, 12:21 AM   #3
Retired carpenter
 
Join Date: Dec 2011
Location: Portland, Oregon
Posts: 303
Rewards Points: 250
Default

basement framing and insulating questions around ledge


I would use method (b), but without the 1x4 or 2x4 ledge cover. Use some brackets to hold the upper wall to the wall instead.
Remember to use pressure treated lumber for the bottom plate, and to leave an air gap between the studs and the brick wall.
Fiberglass insulation between the studs will be cheaper and more efficient, I believe.
abracaboom is offline   Reply With Quote
Old 12-29-2011, 09:25 AM   #4
Newbie
 
Join Date: Dec 2011
Posts: 4
Rewards Points: 10
Default

basement framing and insulating questions around ledge


Thanks abracaboom.

What kind of bracket do you mean?
khatz is offline   Reply With Quote
Old 12-29-2011, 10:23 AM   #5
Retired carpenter
 
Join Date: Dec 2011
Location: Portland, Oregon
Posts: 303
Rewards Points: 250
Default

basement framing and insulating questions around ledge


Quote:
Originally Posted by khatz View Post
Thanks abracaboom.

What kind of bracket do you mean?
On both your lower and top 2x4 walls, you will need some kind of L-brackets attached to both the studs and the masonry to keep the stud walls from falling in. Those same brackets will keep the 2x8 from sinking.

I would also add, once the bottom wall is up, some concrete or cement points every 2 feet or so level with the top of the plate to support the 2x8 (faster and simpler than adding continuous 1x4 or 2x4 supports, which would be too high at some points for sure and would drive you crazy trying to shave them here and there).
abracaboom is offline   Reply With Quote
Old 12-29-2011, 12:10 PM   #6
Not so new
 
12penny's Avatar
 
Join Date: Nov 2008
Location: Lehigh Valley, Pa.
Posts: 934
Rewards Points: 504
Default

basement framing and insulating questions around ledge


Unless ur trying to keep the ledge, why not frame floor to ceiling?
12penny is offline   Reply With Quote
Old 12-29-2011, 03:29 PM   #7
Newbie
 
Join Date: Dec 2011
Posts: 4
Rewards Points: 10
Default

basement framing and insulating questions around ledge


Thanks for your input. I will find more inf o about L bracket.(size, material)

For the reason I am keeping the ledge is to Have nice shelf after finishing. Also not sure how i can fill up the hollow space. If it is much easier, then i might have to think about that option, too.
khatz is offline   Reply With Quote
Old 12-29-2011, 05:21 PM   #8
Member
 
Join Date: Dec 2011
Location: B.C. Canada
Posts: 2,055
Rewards Points: 1,030
Default

basement framing and insulating questions around ledge


Build lower wall first then toe screw upper studs to lower wall. Or build upper wall with a 2x4 bottom plate that gets nailed to the 2X8. I would not use brackets. Nothing wronge with them just more cost effective and faster these other ways.

(Read GBR below- much better ways *** IGNORE THIS You could use regular fiberglass insulation for all of the wall. I put a 2" piece of styrofaom in the bottom of each spacing between the studs. Stops wicking of water up the insulation.)

Also keep the drywall up 2" or as high as baseboards will allow (higher if taller baseboards,) and put 1/2" ply behind the baseboards.

Last edited by mae-ling; 01-02-2012 at 10:39 PM. Reason: GBR post below mine was much better way
mae-ling is offline   Reply With Quote
Old 01-02-2012, 01:50 PM   #9
Registered User
 
Join Date: Mar 2009
Posts: 9,967
Rewards Points: 2,000
Default

basement framing and insulating questions around ledge


http://www.buildingscience.com/docum...g-your-basment

http://www.buildingscience.com/docum...-at-rim-joist/

http://www.buildingscience.com/docum...wall-approach/

http://www.greenbuildingadvisor.com/...-building-code

Gary

__________________
If any ads are present in my answer above, I do not condone/support/use the product or services listed, they are there against my permission.
Gary in WA is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Basement Concrete Wall Framing Against Stairs Epicsoccer Remodeling 7 01-13-2013 04:11 PM
which method of framing and insulating basement daphillenium Insulation 3 10-27-2011 09:27 AM
Basement insulating and framing blakeasaurus Building & Construction 0 02-01-2011 07:37 PM
basement framing and insulating Donbee Building & Construction 10 12-25-2010 04:14 AM
Insulating basement - questions jtmann HVAC 7 11-19-2010 04:20 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.