This storage area has been in my attic since I moved in. I installed an attic ladder. Due to cracking sheetrock seams in the ceiling underneath the storage area in the garage I felt that the area was not built properly. At one point I had my brother walk around this area while I watched the ceiling and there was some movement.
Ok, so I figure no reason to worry too much, I'll just make sure I don't put stuff thats too heavy up there. Since this is just trussing, this area wasn't designed to have a floor in it anyway. I finally decided to pull up one of the original OSB "floor" panels in this storage space and the picture below is what I found.
I'm thinking this isn't a good way to build this floor and I wanted to make sure my thoughts were along the right lines before I rebuilt the area. The ceiling joists are 2x4s. I believe this area was built when the house was being built originally as the picture shows no insulation in one area. This is what it looked like when I pulled up the OSB, so if they couldn't get insulation into that area the floor must have been built before the insulation was put in.
The 2x4s that were installed to put the OSB on was put on other blocking besides the joists and then toenailed in. I'm thinking of removing these 2x4s and getting 2x8s to put in and sister the new 2x8s to the entire joist. Perhaps make the 2x8 go past the end of the flooring area and bring another 2x4 up to the roof to tie it in.
Ok, so I figure no reason to worry too much, I'll just make sure I don't put stuff thats too heavy up there. Since this is just trussing, this area wasn't designed to have a floor in it anyway. I finally decided to pull up one of the original OSB "floor" panels in this storage space and the picture below is what I found.
I'm thinking this isn't a good way to build this floor and I wanted to make sure my thoughts were along the right lines before I rebuilt the area. The ceiling joists are 2x4s. I believe this area was built when the house was being built originally as the picture shows no insulation in one area. This is what it looked like when I pulled up the OSB, so if they couldn't get insulation into that area the floor must have been built before the insulation was put in.
The 2x4s that were installed to put the OSB on was put on other blocking besides the joists and then toenailed in. I'm thinking of removing these 2x4s and getting 2x8s to put in and sister the new 2x8s to the entire joist. Perhaps make the 2x8 go past the end of the flooring area and bring another 2x4 up to the roof to tie it in.